ADAMS "101"

Operated by THOMPSON, J. CLEO (P-5 855610) in the AMACKER-TIPPETT, SW (WOLFCAMP) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 15246District 7CField 02220700OilCasinghead gasSaveExport
Value, all time
$3.8 M
Apr 2002 – Jun 2009
Value, last 12 filed months
$0
at the published price for each month
Months reported
87
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 94 leases and 140 wells, and the rule below applies to all of them.

Discovered
1977-05-29
as the register files it
Field class
Oil and gas
the register's own label
Between wells
1,320 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 80 acres. The field rule took effect on 1996-05-01.

The Commission's schedule remark for this field reads: AOF-1 AND AOF-2 EFFECTIVE 05/01/2002.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition44,856 bbl$1,493,684
Casinghead gasProduction330,678 Mcf$2,321,377
Total$3,815,062

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.4215, -102.1179. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

31.42147, -102.11785 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
9,400 ft
1 wells filed one
Completion to plug
18.5 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 9,400 ft.

Completions filed
Sep 2002
1 of 1 wells
Plug dates filed
Mar 2021
1 of 1 wells

Last completion to plug: a median of 18.5 years across the 1 well that filed both dates, with the middle half between 18.5 years and 18.5 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-4613413019,400 ftSep 2002Mar 2021Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (87)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

87 months

Jun 20090066.163.90$0
May 20090054.743.93$0
Apr 20090046.773.59$0
Mar 20090042.144.06$0
Feb 20090032.814.63$0
Jan 20090035.865.37$0
Dec 20080037.105.98$0
Nov 20080055.496.86$0
Oct 20080075.246.92$0
Sep 200800101.767.88$0
Aug 200800114.228.48$0
Jul 200800131.0811.39$0
Jun 200800131.3313.03$0
May 200800123.1711.57$0
Apr 200800110.3110.45$0
Mar 200800101.909.66$0
Feb 20080092.538.77$0
Jan 20080090.388.21$0
Dec 20070088.337.30$0
Nov 20070091.677.29$0
Oct 20070082.856.92$0
Sep 20070075.846.24$0
Aug 20070069.066.39$0
Jul 20070070.906.39$0
Jun 20070062.007.55$0
May 20070058.747.85$0
Apr 20070059.617.81$0
Mar 20070056.927.30$0
Feb 20071688,90755.108.22$82,437
Jan 200708,91550.306.73$59,970
Dec 2006010,41356.656.92$72,042
Nov 200606,80254.207.62$51,814
Oct 200606,74154.906.01$40,539
Sep 200606,49660.085.04$32,722
Aug 200606,24668.717.34$45,845
Jul 20061695,60469.376.34$47,268
Jun 200619,13966.286.38$58,409
May 200609,13866.016.42$58,712
Apr 2006010,24764.397.36$75,423
Mar 200617611,95856.707.08$94,677
Feb 20061828,61657.597.75$77,265
Jan 20061788,87660.598.93$90,077
Dec 20051896,16854.9413.42$93,130
Nov 20051896,45854.6910.59$78,716
Oct 20053567,57058.3413.80$125,203
Sep 20052817,25761.4512.08$104,925
Aug 20051837,08961.519.80$80,706
Jul 20055447,34655.697.84$87,915
Jun 20055387,18952.337.38$81,216
May 20057287,03145.226.65$79,684
Apr 20057187,37749.207.36$89,624
Mar 20059227,28750.377.15$98,579
Feb 20059214,66545.226.31$71,093
Jan 20059124,42243.166.32$67,319
Dec 20041,0924,80939.866.75$75,993
Nov 20049095,43145.286.33$75,540
Oct 20045505,01149.706.52$59,982
Sep 20041777,25643.245.28$45,993
Aug 200409,75042.375.55$54,119
Jul 20040038.286.08$0
Jun 2004017,57136.106.43$113,035
May 200492311,40437.486.49$108,658
Apr 20041,71695234.475.86$64,728
Mar 20041,8516,93434.365.53$101,946
Feb 20041,4406,33832.455.51$81,648
Jan 20045452,10332.036.30$30,704
Dec 20031,3046,07330.266.30$77,729
Nov 20035605,36028.804.60$40,758
Oct 20033629,92428.174.76$57,432
Sep 20031,8664,18226.314.75$68,956
Aug 20032,0337,63129.765.13$99,647
Jul 20031848,79929.415.17$50,910
Jun 20031,4756,01128.565.98$78,090
May 20031,480026.595.97$39,353
Apr 2003746026.675.41$19,896
Mar 20031,103031.146.10$34,347
Feb 20031,294033.487.93$43,323
Jan 20032,6123,01830.315.58$96,016
Dec 20021,295026.914.85$34,848
Nov 20021,505024.664.14$37,113
Oct 20022,434026.464.23$64,404
Sep 20021,877027.443.64$51,505
Aug 200237325225.963.16$10,480
Jul 20021,30357524.583.06$33,788
Jun 20023,3952,40023.733.34$88,575
May 200292493724.663.58$26,144
Apr 2002173023.653.51$4,091

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Feb 2007 — as filed, then multipliedworked
Oil                  168 bbl  × $ 55.10 =     $9,257
Casinghead gas     8,907 Mcf  × $  8.22 =    $73,180

────────────────────────────────────────────────────
Month total                                  $82,437

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/O/15246 is the state's own key, not one this site invented.