LIN CZ

Operated by DISCOVERY OPERATING, INC. (P-5 220865) in the W.O.D. (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 15933District 7CField 94353500OilCasinghead gasSaveExport
Value, all time
$603 k
Mar 2006 – May 2026
Value, last 12 filed months
$4 k
at the published price for each month
Months reported
243
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 25 leases and 25 wells, and the rule below applies to all of them.

Discovered
1979-07-02
as the register files it
Field class
Oil and gas
the register's own label
Between wells
933 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 80 acres. The field rule took effect on 2006-10-10.

The Commission's schedule remark for this field reads: PERMANENT RULE.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition3,102 bbl$224,695
Casinghead gasProduction89,235 Mcf$378,132
Total$602,827

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.9977, -100.7832. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.99770, -100.78321 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,199 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,199 ft.

Completions filed
Mar 2006
1 of 1 wells

1 well

42-4133233417,199 ftMar 2006

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (243)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

243 months

May 20260100106.413.05$305
Apr 202607298.932.87$207
Mar 2026010189.753.15$318
Feb 202609063.503.75$338
Jan 202608259.138.00$656
Dec 2025011656.664.41$512
Nov 202501558.593.93$59
Oct 202503559.383.30$116
Sep 2025012162.743.08$372
Aug 2025012263.933.01$368
Jul 202508666.743.32$285
Jun 2025010866.483.13$338
May 202508760.553.23$281
Apr 2025017562.363.54$620
Mar 2025012667.704.27$538
Feb 2025017170.884.34$742
Jan 2025017274.324.28$736
Dec 2024018668.993.12$581
Nov 202402169.052.20$46
Oct 2024015671.372.28$356
Sep 202407469.612.36$175
Aug 202403475.632.06$70
Jul 202408879.932.15$189
Jun 2024018078.082.63$474
May 2024013078.812.20$286
Apr 2024010984.451.66$181
Mar 2024016280.301.55$250
Feb 2024018876.091.78$335
Jan 2024019073.023.30$627
Dec 2023012171.262.61$316
Nov 2023014877.892.81$416
Oct 2023012685.443.09$389
Sep 2023020789.042.74$566
Aug 2023021480.522.67$572
Jul 2023023174.852.64$610
Jun 2023018668.962.26$420
May 2023025970.622.23$577
Apr 2023026378.122.24$589
Mar 2023025372.852.39$605
Feb 2023022675.112.47$557
Jan 2023027676.533.39$935
Dec 2022020176.415.73$1,152
Nov 2022022285.005.65$1,253
Oct 2022021887.185.86$1,278
Sep 2022014384.888.16$1,167
Aug 2022016094.529.13$1,460
Jul 20220210101.587.54$1,584
Jun 20220242115.097.98$1,930
May 20220289109.378.43$2,437
Apr 20220142104.226.84$971
Mar 20220276108.885.08$1,401
Feb 2022022091.054.86$1,069
Jan 2022023081.844.54$1,044
Dec 2021024271.323.90$944
Nov 2021028177.435.24$1,472
Oct 2021023479.795.71$1,337
Sep 2021029569.865.35$1,579
Aug 2021023666.024.22$996
Jul 2021030170.783.98$1,199
Jun 2021031369.493.38$1,058
May 2021030063.483.02$905
Apr 2021031260.362.76$861
Mar 2021032961.302.72$894
Feb 2021022157.805.55$1,226
Jan 2021032150.412.81$902
Dec 2020022644.642.68$605
Nov 20209220638.772.71$4,124
Oct 2020028036.972.48$694
Sep 2020026637.091.99$530
Aug 2020029639.982.39$706
Jul 2020028038.371.83$511
Jun 2020023834.901.69$402
May 2020030616.921.81$555
Apr 2020039014.751.80$704
Mar 2020029730.341.86$551
Feb 2020028349.881.98$561
Jan 2020035057.252.09$733
Dec 2019030659.012.30$705
Nov 2019030955.302.75$850
Oct 2019031453.472.42$759
Sep 2019028655.052.66$760
Aug 201907853.112.30$180
Jul 2019028456.272.46$699
Jun 2019027952.782.49$695
May 2019033358.482.74$913
Apr 201910926962.632.75$7,567
Mar 2019041856.803.06$1,280
Feb 2019030750.852.79$857
Jan 2019025646.033.23$826
Dec 2018028746.594.19$1,201
Nov 2018024752.934.24$1,047
Oct 2018032261.443.40$1,094
Sep 2018032759.543.11$1,016
Aug 2018037859.403.07$1,159
Jul 2018063865.142.93$1,871
Jun 2018083360.183.08$2,563
May 2018037065.382.90$1,073
Apr 2018034463.842.90$998
Mar 2018036261.222.79$1,009
Feb 2018034261.782.77$946
Jan 2018036562.874.01$1,463
Dec 20177630257.272.92$5,235
Nov 2017035255.423.12$1,098
Oct 2017025149.292.98$749
Sep 2017026347.523.09$812
Aug 2017029145.373.00$874
Jul 2017024943.873.09$769
Jun 2017032042.493.09$988
May 2017038245.373.26$1,247
Apr 2017023047.933.21$739
Mar 2017034746.772.98$1,035
Feb 201716746450.452.95$9,795
Jan 2017029149.413.42$995
Dec 2016048748.763.72$1,813
Nov 2016041842.492.64$1,105
Oct 2016050046.193.09$1,545
Sep 2016062741.553.10$1,944
Aug 2016052741.442.92$1,541
Jul 2016051041.622.92$1,491
Jun 2016048045.352.69$1,289
May 2016037142.521.99$739
Apr 2016047136.561.99$938
Mar 2016045433.011.79$814
Feb 2016044726.472.06$922
Jan 2016044827.352.36$1,059
Dec 2015052232.362.00$1,045
Nov 2015055738.792.17$1,207
Oct 2015092743.552.43$2,249
Sep 2015048042.992.76$1,324
Aug 2015067040.162.87$1,925
Jul 2015070148.152.95$2,065
Jun 2015027756.152.88$799
May 201517029355.212.96$10,252
Apr 2015026949.822.71$728
Mar 2015027842.892.93$816
Feb 2015019344.662.98$574
Jan 2015020943.433.10$648
Dec 2014021254.693.59$761
Nov 2014020870.464.25$884
Oct 2014020878.303.90$811
Sep 2014123286.164.05$1,025
Aug 2014025089.394.04$1,009
Jul 2014025196.564.18$1,049
Jun 2014224998.164.74$1,376
May 2014027694.734.73$1,305
Apr 2014031695.944.81$1,520
Mar 2014030495.895.06$1,537
Feb 2014130097.406.19$1,955
Jan 2014032990.404.86$1,599
Dec 2013032691.824.35$1,420
Nov 2013033588.853.74$1,252
Oct 2013135197.423.78$1,424
Sep 20130190104.113.72$706
Aug 20132324104.253.52$1,350
Jul 2013176310102.523.72$19,196
Jun 2013333594.403.93$1,601
May 2013025294.834.15$1,046
Apr 2013131893.964.28$1,456
Mar 2013018393.623.91$716
Feb 2013027791.233.42$947
Jan 2013035791.603.42$1,221
Dec 2012136886.773.42$1,345
Nov 2012036886.953.62$1,334
Oct 2012533989.383.40$1,599
Sep 2012034794.672.92$1,013
Aug 2012036592.662.91$1,061
Jul 2012335185.133.02$1,316
Jun 2012134079.822.52$936
May 2012135691.612.49$977
Apr 20120341101.652.00$681
Mar 20120360105.052.22$800
Feb 2012166335101.102.57$17,644
Jan 2012033798.092.73$921
Dec 2011134296.873.24$1,205
Nov 2011034995.723.31$1,156
Oct 2011137184.983.65$1,439
Sep 2011137583.623.99$1,578
Aug 2011239283.404.15$1,793
Jul 2011040494.144.52$1,825
Jun 2011199292.904.64$4,696
May 201111,02198.134.40$4,595
Apr 20110940105.964.33$4,073
Mar 20111841,03096.364.06$21,909
Feb 2011188885.644.18$3,797
Jan 201111,03486.504.59$4,831
Dec 2010092185.734.35$4,004
Nov 2010094380.843.80$3,579
Oct 201011,00478.103.51$3,601
Sep 2010193072.633.98$3,774
Aug 201011,01573.684.42$4,559
Jul 201001,06472.554.74$5,040
Jun 2010911,03970.364.91$11,505
May 201001,09871.124.24$4,650
Apr 2010198281.694.12$4,130
Mar 201001,01178.394.39$4,437
Feb 20106277173.585.44$8,758
Jan 2010486174.365.96$5,433
Dec 2009188471.445.48$4,919
Nov 2009189074.593.75$3,413
Oct 200917692472.544.11$16,565
Sep 2009079965.543.06$2,449
Aug 20091121867.423.22$1,443
Jul 2009125261.133.46$934
Jun 2009022266.163.90$865
May 2009022554.743.93$883
Apr 2009122546.773.59$854
Mar 200917624142.144.06$8,395
Feb 2009022232.814.63$1,029
Jan 2009022435.865.37$1,203
Dec 2008119237.105.98$1,185
Nov 2008023055.496.86$1,578
Oct 2008125575.246.92$1,840
Sep 20080167101.767.88$1,315
Aug 20080241114.228.48$2,044
Jul 2008173249131.0811.39$25,513
Jun 20080228131.3313.03$2,971
May 20080261123.1711.57$3,021
Apr 20080257110.3110.45$2,687
Mar 20080263101.909.66$2,542
Feb 200815824192.538.77$16,733
Jan 2008025990.388.21$2,125
Dec 2007026288.337.30$1,913
Nov 2007024191.677.29$1,757
Oct 2007027482.856.92$1,897
Sep 200717526275.846.24$14,908
Aug 2007027669.066.39$1,763
Jul 2007127770.906.39$1,840
Jun 2007128962.007.55$2,244
May 200717531658.747.85$12,759
Apr 2007229059.617.81$2,383
Mar 2007128456.927.30$2,131
Feb 2007125755.108.22$2,167
Jan 200718127250.306.73$10,934
Dec 2006297356.656.92$6,845
Nov 200601,05554.207.62$8,036
Oct 200617179754.906.01$14,181
Sep 2006035160.085.04$1,768
Aug 2006137768.717.34$2,836
Jul 200618047169.376.34$15,474
Jun 2006265466.286.38$4,308
May 2006093266.016.42$5,988
Apr 20061771,91564.397.36$25,492
Mar 200601,28956.707.08$9,130

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Oil                    0 bbl  × $106.41 =         $0
Casinghead gas       100 Mcf  × $  3.05 =       $305

────────────────────────────────────────────────────
Month total                                     $305

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/O/15933 is the state's own key, not one this site invented.