Operated by ANDERSON, JAMES K. INC. (P-5 22275) in the WADY (CANYON SAND) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 15954District 7CField 94551075OilCasinghead gasSaveExport
Value, all time
$1.1 M
May 2006 – May 2022
Value, last 12 filed months
$0
at the published price for each month
Months reported
193
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 3 leases and 3 wells, and the rule below applies to all of them.

Discovered
1996-01-09
as the register files it
Field class
Oil
the register's own label
Between wells
933 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 1996-03-26.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition14,906 bbl$1,053,603
Casinghead gasProduction4,470 Mcf$19,712
Total$1,073,316

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.9686, -100.1508. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

31.96864, -100.15078 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
4,025 ft
1 wells filed one
Completion to plug
15.5 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 4,025 ft.

Completions filed
May 2006
1 of 1 wells
Plug dates filed
Nov 2021
1 of 1 wells

Last completion to plug: a median of 15.5 years across the 1 well that filed both dates, with the middle half between 15.5 years and 15.5 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-3993490714,025 ftMay 2006Nov 2021Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (193)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

193 months

May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 2019159052.782.49$8,392
May 20190058.482.74$0
Apr 20190062.632.75$0
Mar 20190056.803.06$0
Feb 201903050.852.79$84
Jan 201903046.033.23$97
Dec 201803046.594.19$126
Nov 201803052.934.24$127
Oct 201803061.443.40$102
Sep 201803059.543.11$93
Aug 201803059.403.07$92
Jul 201803065.142.93$88
Jun 201803060.183.08$92
May 20181253065.382.90$8,260
Apr 201803063.842.90$87
Mar 201803061.222.79$84
Feb 201803061.782.77$83
Jan 201803062.874.01$120
Dec 201703057.272.92$88
Nov 201703055.423.12$94
Oct 201703049.292.98$90
Sep 201703047.523.09$93
Aug 201703045.373.00$90
Jul 201703043.873.09$93
Jun 201703042.493.09$93
May 201703045.373.26$98
Apr 201703047.933.21$96
Mar 201703046.772.98$90
Feb 20171503050.452.95$7,656
Jan 201703049.413.42$103
Dec 201603048.763.72$112
Nov 201603042.492.64$79
Oct 201603046.193.09$93
Sep 201603041.553.10$93
Aug 201603041.442.92$88
Jul 201603041.622.92$88
Jun 201603045.352.69$81
May 201603042.521.99$60
Apr 20161603036.561.99$5,909
Mar 201603033.011.79$54
Feb 201603026.472.06$62
Jan 201603027.352.36$71
Dec 201503032.362.00$60
Nov 201503038.792.17$65
Oct 20151623043.552.43$7,128
Sep 201503042.992.76$83
Aug 201503040.162.87$86
Jul 201503048.152.95$88
Jun 201503056.152.88$86
May 201503055.212.96$89
Apr 201503049.822.71$81
Mar 20151633042.892.93$7,079
Feb 201503044.662.98$89
Jan 201503043.433.10$93
Dec 201403054.693.59$108
Nov 201403070.464.25$128
Oct 201403078.303.90$117
Sep 201403086.164.05$121
Aug 201403089.394.04$121
Jul 201403096.564.18$125
Jun 20141533098.164.74$15,161
May 20140094.734.73$0
Apr 20140095.944.81$0
Mar 201403095.895.06$152
Feb 201403097.406.19$186
Jan 20140090.404.86$0
Dec 201303091.824.35$131
Nov 201303088.853.74$112
Oct 201303097.423.78$113
Sep 2013030104.113.72$112
Aug 201315930104.253.52$16,681
Jul 2013030102.523.72$112
Jun 201303094.403.93$118
May 201303094.834.15$124
Apr 201303093.964.28$128
Mar 20131753093.623.91$16,501
Feb 201303091.233.42$103
Jan 201303091.603.42$103
Dec 201203086.773.42$103
Nov 201203086.953.62$109
Oct 20121523089.383.40$13,688
Sep 201203094.672.92$88
Aug 201203092.662.91$87
Jul 201203085.133.02$91
Jun 20120079.822.52$0
May 201203091.612.49$75
Apr 201217630101.652.00$17,950
Mar 2012030105.052.22$67
Feb 2012030101.102.57$77
Jan 201203098.092.73$82
Dec 20111783096.873.24$17,340
Nov 201103095.723.31$99
Oct 201103084.983.65$109
Sep 201103083.623.99$120
Aug 20111753083.404.15$14,719
Jul 201103094.144.52$136
Jun 201103092.904.64$139
May 201103098.134.40$132
Apr 201117630105.964.33$18,779
Mar 201103096.364.06$122
Feb 201103085.644.18$125
Jan 20111743086.504.59$15,189
Dec 201003085.734.35$130
Nov 20101793080.843.80$14,584
Oct 201003078.103.51$105
Sep 20101783072.633.98$13,048
Aug 201003073.684.42$133
Jul 20101753072.554.74$12,838
Jun 20101783070.364.91$12,671
May 201003071.124.24$127
Apr 20101793081.694.12$14,746
Mar 201003078.394.39$132
Feb 20100073.585.44$0
Jan 201003074.365.96$179
Dec 200903071.445.48$165
Nov 20091753074.593.75$13,166
Oct 20091773072.544.11$12,963
Sep 20091773065.543.06$11,693
Aug 200903067.423.22$97
Jul 20091763061.133.46$10,863
Jun 200903066.163.90$117
May 20091763054.743.93$9,752
Apr 20091793046.773.59$8,479
Mar 200913042.144.06$164
Feb 20091803032.814.63$6,045
Jan 20091793035.865.37$6,580
Dec 200803037.105.98$179
Nov 20081753055.496.86$9,917
Oct 20081783075.246.92$13,600
Sep 200817830101.767.88$18,350
Aug 2008130114.228.48$369
Jul 200817630131.0811.39$23,412
Jun 200818230131.3313.03$24,293
May 200818030123.1711.57$22,518
Apr 200818330110.3110.45$20,500
Mar 2008230101.909.66$494
Feb 20081813092.538.77$17,011
Jan 20081863090.388.21$17,057
Dec 20071843088.337.30$16,472
Nov 20071813091.677.29$16,811
Oct 20071773082.856.92$14,872
Sep 20071813075.846.24$13,914
Aug 20073583069.066.39$24,915
Jul 20071833070.906.39$13,166
Jun 20071803062.007.55$11,386
May 20072543058.747.85$15,155
Apr 20073773059.617.81$22,707
Mar 20073103056.927.30$17,864
Feb 20073683055.108.22$20,523
Jan 20071863050.306.73$9,558
Dec 20063643056.656.92$20,828
Nov 20063683054.207.62$20,174
Oct 20065453054.906.01$30,101
Sep 20063673060.085.04$22,200
Aug 20067243068.717.34$49,966
Jul 20061,0803069.376.34$75,110
Jun 20061,2593066.286.38$83,638
May 20068923066.016.42$59,074

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jun 2019 — as filed, then multipliedworked
Oil                  159 bbl  × $ 52.78 =     $8,392
Casinghead gas         0 Mcf  × $  2.49 =         $0

────────────────────────────────────────────────────
Month total                                   $8,392

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/O/15954 is the state's own key, not one this site invented.