SCHLINKE "18"

Operated by PIONEER NATURAL RES. USA, INC. (P-5 665748) in the PROBANDT (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 16042District 7CField 73243500OilCasinghead gasSaveExport
Value, all time
$1.5 M
Aug 2006 – Feb 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
235
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 126 leases and 180 wells, and the rule below applies to all of them.

Discovered
1975-02-12
as the register files it
Field class
Oil and gas
the register's own label
Between wells
1,200 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 80 acres. The field rule took effect on 1983-09-26.

The Commission's schedule remark for this field reads: FIELD RULES EFF. 9/26/83 PER DKT 7C-79,619 NET GOR 750

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition6,172 bbl$453,146
Casinghead gasProduction201,017 Mcf$1,045,653
Total$1,498,799

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.4341, -100.9089. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

31.43410, -100.90890 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
6,800 ft
1 wells filed one
Completion to plug
6.5 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,800 ft.

Completions filed
Apr 2019
1 of 1 wells
Plug dates filed
Oct 2025
1 of 1 wells

Last completion to plug: a median of 6.5 years across the 1 well that filed both dates, with the middle half between 6.5 years and 6.5 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-2353396846,800 ftApr 2019Oct 2025Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (235)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

235 months

Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 201924062.632.75$1,503
Mar 2019027756.803.06$848
Feb 2019019050.852.79$531
Jan 2019021746.033.23$701
Dec 2018025446.594.19$1,063
Nov 2018024152.934.24$1,021
Oct 2018020861.443.40$707
Sep 2018020059.543.11$622
Aug 2018021959.403.07$672
Jul 2018025265.142.93$739
Jun 201814319160.183.08$9,193
May 2018016965.382.90$490
Apr 2018022863.842.90$661
Mar 2018027461.222.79$764
Feb 2018025061.782.77$692
Jan 2018029562.874.01$1,183
Dec 2017031857.272.92$929
Nov 2017033055.423.12$1,029
Oct 2017039549.292.98$1,179
Sep 2017045447.523.09$1,402
Aug 2017040745.373.00$1,223
Jul 2017035643.873.09$1,099
Jun 2017029042.493.09$895
May 2017030645.373.26$999
Apr 2017030747.933.21$986
Mar 2017031646.772.98$943
Feb 2017028150.452.95$830
Jan 2017029849.413.42$1,019
Dec 2016030148.763.72$1,121
Nov 2016031042.492.64$820
Oct 20167929546.193.09$4,561
Sep 2016032541.553.10$1,008
Aug 2016033541.442.92$980
Jul 2016048741.622.92$1,424
Jun 2016067745.352.69$1,818
May 201618051842.521.99$8,685
Apr 2016359936.561.99$1,302
Mar 201615871433.011.79$6,497
Feb 2016065226.472.06$1,345
Jan 2016073927.352.36$1,747
Dec 2015072532.362.00$1,451
Nov 2015073338.792.17$1,589
Oct 2015081343.552.43$1,973
Sep 2015080942.992.76$2,232
Aug 2015085840.162.87$2,465
Jul 2015065448.152.95$1,926
Jun 2015060056.152.88$1,730
May 2015053155.212.96$1,569
Apr 201517951549.822.71$10,312
Mar 2015058842.892.93$1,726
Feb 2015056844.662.98$1,690
Jan 2015357743.433.10$1,919
Dec 2014064654.693.59$2,320
Nov 2014083170.464.25$3,533
Oct 2014070178.303.90$2,735
Sep 2014067886.164.05$2,743
Aug 2014077089.394.04$3,107
Jul 201417683896.564.18$20,497
Jun 2014086498.164.74$4,093
May 2014097394.734.73$4,599
Apr 2014053895.944.81$2,587
Mar 2014079895.895.06$4,035
Feb 2014076097.406.19$4,706
Jan 2014087590.404.86$4,253
Dec 20131861,08891.824.35$21,816
Nov 201301,12488.853.74$4,202
Oct 201301,00697.423.78$3,802
Sep 20130994104.113.72$3,695
Aug 201301,062104.253.52$3,741
Jul 201301,130102.523.72$4,201
Jun 20131891,16694.403.93$22,428
May 201301,22194.834.15$5,066
Apr 201301,21493.964.28$5,199
Mar 201301,52093.623.91$5,948
Feb 201301,41791.233.42$4,846
Jan 20131881,43091.603.42$22,111
Dec 201201,49986.773.42$5,127
Nov 201201,46486.953.62$5,307
Oct 201221,52989.383.40$5,377
Sep 201201,45594.672.92$4,246
Aug 201201,51792.662.91$4,412
Jul 201201,52585.133.02$4,607
Jun 201211,47879.822.52$3,803
May 20121841,48791.612.49$20,556
Apr 201201,461101.652.00$2,917
Mar 201201,777105.052.22$3,949
Feb 201201,695101.102.57$4,357
Jan 20121881,90198.092.73$23,638
Dec 201101,97096.873.24$6,382
Nov 201102,01895.723.31$6,682
Oct 201101,95984.983.65$7,147
Sep 201101,91583.623.99$7,633
Aug 20111841,94583.404.15$23,416
Jul 201101,69694.144.52$7,661
Jun 201101,66992.904.64$7,744
May 201101,76098.134.40$7,752
Apr 20111891,862105.964.33$28,095
Mar 20111932,06996.364.06$26,992
Feb 201102,16585.644.18$9,050
Jan 201101,93786.504.59$8,888
Dec 201001,87385.734.35$8,143
Nov 201002,05780.843.80$7,807
Oct 201002,16178.103.51$7,583
Sep 201002,05172.633.98$8,162
Aug 201002,23973.684.42$9,895
Jul 20101782,27272.554.74$23,675
Jun 201002,25170.364.91$11,053
May 201002,02771.124.24$8,585
Apr 201001,65881.694.12$6,835
Mar 20101721,74678.394.39$21,146
Feb 201001,54573.585.44$8,408
Jan 201001,72174.365.96$10,264
Dec 200901,75071.445.48$9,597
Nov 20091781,78274.593.75$19,962
Oct 200901,87872.544.11$7,719
Sep 200901,82765.543.06$5,599
Aug 200901,94267.423.22$6,250
Jul 200902,00361.133.46$6,939
Jun 20091831,96166.163.90$19,745
May 200902,04654.743.93$8,032
Apr 200902,00046.773.59$7,175
Mar 200902,11442.144.06$8,581
Feb 200901,93432.814.63$8,960
Jan 20091782,21535.865.37$18,280
Dec 200802,25737.105.98$13,490
Nov 200802,34255.496.86$16,067
Oct 200802,51375.246.92$17,395
Sep 20081772,564101.767.88$38,208
Aug 200802,597114.228.48$22,030
Jul 200802,616131.0811.39$29,795
Jun 200802,588131.3313.03$33,728
May 20081782,744123.1711.57$53,684
Apr 200802,775110.3110.45$29,012
Mar 200802,941101.909.66$28,422
Feb 20081722,95192.538.77$41,797
Jan 200803,40190.388.21$27,908
Dec 200703,26688.337.30$23,848
Nov 20071743,10591.677.29$38,591
Oct 200703,13182.856.92$21,673
Sep 20071802,73775.846.24$30,741
Aug 200702,04869.066.39$13,083
Jul 200702,22070.906.39$14,181
Jun 20071862,39562.007.55$29,611
May 200702,22158.747.85$17,427
Apr 20071792,06559.617.81$26,788
Mar 20071752,10956.927.30$25,361
Feb 200701,70255.108.22$13,984
Jan 20071742,05550.306.73$22,576
Dec 20061851,88856.656.92$23,542
Nov 20061471,22954.207.62$17,329
Oct 20063611,01054.906.01$25,893
Sep 200618769260.085.04$14,721
Aug 200635995968.717.34$31,706

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2019 — as filed, then multipliedworked
Oil                   24 bbl  × $ 62.63 =     $1,503
Casinghead gas         0 Mcf  × $  2.75 =         $0

────────────────────────────────────────────────────
Month total                                   $1,503

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/O/16042 is the state's own key, not one this site invented.