SUGG-JANE TAYLOR "E"

Operated by COMPASS ENERGY OPERATING, LLC (P-5 169751) in the SUGG RANCH (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 16076District 7CField 87018551OilCasinghead gasSaveExport
Value, all time
$39.3 M
Nov 2006 – Jun 2021
Value, last 12 filed months
$0
at the published price for each month
Months reported
176
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 116 leases and 861 wells, and the rule below applies to all of them.

Discovered
1987-05-17
as the register files it
Field class
Oil and gas
the register's own label
Between wells
933 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 1992-04-01.

The Commission's schedule remark for this field reads: EFF 10-01-19

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition385,947 bbl$30,662,525
Casinghead gasProduction2,017,147 Mcf$8,674,956
Total$39,337,481

Wells on this lease (19)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.4586, -101.0736. A lease has no coordinate of its own — that point is the mean of its wells, and they span 1.9 miles.

31.45941, -101.06926 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
19 of 19 wells
With a plug date
5.3%
1 of 19 wells
Median depth
7,690 ft
19 wells filed one
Completion to plug
4.0 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
19100.0%
A plug date is filed
15.3%
BothOn the schedule and plugged. Neither fact cancels the other.
15.3%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

Total depth in feet, 19 of 19 wells. Median 7,690 ft, with the middle half between 7,611 and 7,808 ft; the shallowest is 7,500 ft and the deepest 8,045 ft. The median is published rather than the mean, because a single mis-keyed depth moves a mean and cannot move a median.

When they were last completed

Last completion by decade, 19 of 19 wells, Feb 2007 – Mar 2018. This is the LAST completion filed on each wellbore, not the first — a well recompleted in 2019 counts once, in the 2010s.

Completions filed
Feb 2007 – Mar 2018
19 of 19 wells
Plug dates filed
May 2020
1 of 19 wells; 18 filed none

Last completion to plug: a median of 4.0 years across the 1 well that filed both dates, with the middle half between 4.0 years and 4.0 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

19 wells

42-2353423019E7,722 ftMar 2018Yes
42-2353423120E7,668 ftSep 2016Yes
42-235340202E7,675 ftMay 2016May 2020Yes
42-235340727E7,900 ftSep 2015Yes
42-2353414312E7,575 ftJul 2015Yes
42-2353458723E7,920 ftJul 2014Yes
42-2353465827E7,690 ftMay 2011Yes
42-2353465933E7,815 ftMay 2011Yes
42-2353418014E7,500 ftJul 2009Yes
42-2353423222E7,742 ftSep 2008Yes
42-2353422821E7,624 ftJul 2008Yes
42-2353418716E7,540 ftApr 2008Yes
42-2353418317E7,699 ftApr 2008Yes
42-2353417815E7,500 ftMar 2008Yes
42-2353417313E7,597 ftFeb 2008Yes
42-235341229E7,928 ftOct 2007Yes
42-235340778E7,650 ftMay 2007Yes
42-235340665E7,800 ftMar 2007Yes
42-235340444E8,045 ftFeb 2007Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (176)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

176 months

Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20198755,98355.052.66$64,067
Aug 20194596,36453.112.30$39,042
Jul 20194676,41656.272.46$42,062
Jun 20195126,46952.782.49$43,139
May 20195116,60158.482.74$47,972
Apr 20194156,31862.632.75$43,370
Mar 20194956,75956.803.06$48,813
Feb 20194866,13350.852.79$41,838
Jan 20196446,76146.033.23$51,469
Dec 20186846,82146.594.19$60,416
Nov 20183536,88652.934.24$47,862
Oct 20186267,20261.443.40$62,934
Sep 20184777,08559.543.11$50,421
Aug 20185977,41459.403.07$58,197
Jul 20183997,59065.142.93$48,244
Jun 20186417,55260.183.08$61,812
May 20184907,91065.382.90$54,982
Apr 20186387,90263.842.90$63,652
Mar 20186479,12961.222.79$65,050
Feb 20186447,04761.782.77$59,279
Jan 20184327,78762.874.01$58,380
Dec 20174997,94857.272.92$51,798
Nov 20176977,95255.423.12$63,425
Oct 20176107,97549.292.98$53,862
Sep 20174707,79347.523.09$46,394
Aug 20177568,11345.373.00$58,674
Jul 20176708,59843.873.09$55,937
Jun 20174618,64042.493.09$46,262
May 20174618,72945.373.26$49,402
Apr 20176518,78847.933.21$59,426
Mar 20178809,76746.772.98$70,299
Feb 20175718,74350.452.95$54,622
Jan 20177289,29149.413.42$67,735
Dec 20166689,50148.763.72$67,942
Nov 20169969,63742.492.64$67,804
Oct 201676210,47546.193.09$67,567
Sep 201675110,63941.553.10$64,192
Aug 201679710,58641.442.92$63,985
Jul 20166479,89841.622.92$55,873
Jun 201679110,40645.352.69$63,821
May 201692010,92442.521.99$60,869
Apr 201690010,98836.561.99$54,782
Mar 201693711,12933.011.79$50,896
Feb 20161,09310,72726.472.06$51,068
Jan 20161,04110,66827.352.36$53,694
Dec 20151,33511,55332.362.00$66,323
Nov 20151,24212,03438.792.17$74,259
Oct 20151,14710,45843.552.43$75,329
Sep 20157457,49342.992.76$52,696
Aug 20157657,92840.162.87$53,496
Jul 20156429,25048.152.95$58,154
Jun 201595210,41056.152.88$83,465
May 201578412,74455.212.96$80,949
Apr 20151,40214,60349.822.71$109,372
Mar 20151,72414,66042.892.93$116,965
Feb 201577412,04144.662.98$70,403
Jan 20151,55912,53443.433.10$106,571
Dec 20141,14913,37154.693.59$110,859
Nov 20141,24612,64870.464.25$141,570
Oct 20141,32414,03478.303.90$158,415
Sep 20141,10014,23986.164.05$152,379
Aug 20141,38314,22889.394.04$181,038
Jul 20141,14413,49396.564.18$166,860
Jun 20141,44813,50998.164.74$206,126
May 201475513,50694.734.73$135,358
Apr 20141,11512,79795.944.81$168,515
Mar 20141,74314,38695.895.06$239,883
Feb 20141,47313,17297.406.19$225,031
Jan 20141,56815,12190.404.86$215,246
Dec 20131,75014,72191.824.35$224,787
Nov 20131,54913,50688.853.74$188,118
Oct 20131,59314,40797.423.78$209,639
Sep 20131,49114,883104.113.72$210,559
Aug 20131,81316,613104.253.52$247,526
Jul 20131,56917,149102.523.72$224,609
Jun 20131,58816,61094.403.93$215,241
May 20132,09217,32294.834.15$270,255
Apr 20131,91317,08993.964.28$252,931
Mar 20132,32918,19893.623.91$289,247
Feb 20131,87316,20691.233.42$226,297
Jan 20132,18517,94391.603.42$261,509
Dec 20122,41718,49686.773.42$272,982
Nov 20121,99718,42786.953.62$240,436
Oct 20122,76119,78889.383.40$314,051
Sep 20122,52819,41394.672.92$295,981
Aug 20122,47220,17592.662.91$287,728
Jul 20122,52420,08685.133.02$275,544
Jun 20123,11819,61879.822.52$298,297
May 20122,64719,35591.612.49$290,653
Apr 20122,54817,918101.652.00$294,783
Mar 20123,24218,997105.052.22$382,785
Feb 20122,85717,404101.102.57$333,575
Jan 20123,63920,18298.092.73$412,129
Dec 20113,70519,22896.873.24$421,197
Nov 20113,80210,87795.723.31$399,944
Oct 20113,94318,91184.983.65$404,074
Sep 20114,14317,74483.623.99$417,162
Aug 20114,29715,82783.404.15$424,041
Jul 20114,61714,20894.144.52$498,825
Jun 20114,18813,78492.904.64$453,021
May 20113,67314,20998.134.40$423,020
Apr 20112,47514,494105.964.33$325,058
Mar 20113,00414,16796.364.06$346,946
Feb 20112,06612,38985.644.18$228,718
Jan 20112,89613,93986.504.59$314,467
Dec 20102,60414,49885.734.35$286,275
Nov 20102,10814,80580.843.80$226,601
Oct 20102,79115,45978.103.51$272,221
Sep 20102,58415,16872.633.98$248,037
Aug 20102,67716,25873.684.42$269,091
Jul 20102,49315,95872.554.74$256,452
Jun 20102,59716,09570.364.91$261,758
May 20102,90616,97371.124.24$278,559
Apr 20102,86216,48781.694.12$301,768
Mar 20103,81217,33478.394.39$374,896
Feb 20103,28116,06873.585.44$328,864
Jan 20103,74018,11274.365.96$386,128
Dec 20094,22018,85371.445.48$404,862
Nov 20094,23019,00074.593.75$386,794
Oct 20094,07919,67172.544.11$376,743
Sep 20093,75319,18165.543.06$304,757
Aug 20094,41222,53867.423.22$369,996
Jul 20094,26822,16961.133.46$337,707
Jun 20094,53921,94266.163.90$385,764
May 20094,97023,56354.743.93$364,560
Apr 20095,28324,19746.773.59$333,893
Mar 20096,06624,32242.144.06$354,344
Feb 20096,30121,11332.814.63$304,552
Jan 20096,75823,83035.865.37$370,333
Dec 20087,27522,81137.105.98$406,247
Nov 20087,69921,15455.496.86$572,342
Oct 20088,66526,11075.246.92$832,688
Sep 20089,59625,634101.767.88$1,178,410
Aug 20089,54724,676114.228.48$1,299,785
Jul 20088,68024,479131.0811.39$1,416,576
Jun 20087,77121,479131.3313.03$1,300,493
May 20088,95415,878123.1711.57$1,286,641
Apr 20089,26713,658110.3110.45$1,165,035
Mar 20088,9619,536101.909.66$1,005,282
Feb 20085,2756,91192.538.77$548,709
Jan 20083,8607,70790.388.21$412,108
Dec 20074,4658,36888.337.30$455,496
Nov 20075,0336,87591.677.29$511,506
Oct 20072,7126,09682.856.92$266,886
Sep 20072,9196,69375.846.24$263,169
Aug 20073,3148,26069.066.39$281,629
Jul 20074,1818,44170.906.39$350,354
Jun 20073,8296,61962.007.55$287,361
May 20073,6203,61858.747.85$241,027
Apr 20073,2592,91559.617.81$217,021
Mar 20072,2853,18056.927.30$153,282
Feb 20071,9141,91655.108.22$121,203
Jan 20071,394050.306.73$70,118
Dec 20061,735056.656.92$98,288
Nov 20061,331054.207.62$72,140

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Sep 2019 — as filed, then multipliedworked
Oil                  875 bbl  × $ 55.05 =    $48,169
Casinghead gas     5,983 Mcf  × $  2.66 =    $15,899

────────────────────────────────────────────────────
Month total                                  $64,067

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/O/16076 is the state's own key, not one this site invented.