UNIVERSITY -25C-

Operated by APACHE CORPORATION (P-5 27200) in the SPRABERRY (TREND AREA) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 16164District 7CField 85279200OilCasinghead gasSaveExport
Value, all time
$1.7 M
Mar 2007 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
231
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 7,461 leases and 22,481 wells, and the rule below applies to all of them.

Discovered
1904-12-31
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 80 acres. The field rule took effect on 2016-03-08.

The Commission's schedule remark for this field reads: AREA) 85279200.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition17,927 bbl$1,442,913
Casinghead gasProduction60,285 Mcf$288,459
Total$1,731,371

Wells on this lease (2)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.3056, -101.5981. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.1 miles.

31.30556, -101.59808 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
2 of 2 wells
With a plug date
50.0%
1 of 2 wells
Median depth
8,134 ft
2 wells filed one
Completion to plug
11.9 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
2100.0%
A plug date is filed
150.0%
BothOn the schedule and plugged. Neither fact cancels the other.
150.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

Between 7,740 and 8,528 ft, median 8,134 ft, over the 2 wells that filed a depth.

Completions filed
Apr 2005 – Oct 2006
2 of 2 wells
Plug dates filed
Mar 2017
1 of 2 wells; 1 filed none

Last completion to plug: a median of 11.9 years across the 1 well that filed both dates, with the middle half between 11.9 years and 11.9 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

2 wells

42-383358207TM8,528 ftOct 2006Yes
42-3833047647,740 ftApr 2005Mar 2017Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (231)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

231 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 20190062.632.75$0
Mar 20190056.803.06$0
Feb 20190050.852.79$0
Jan 20190046.033.23$0
Dec 20180046.594.19$0
Nov 20180052.934.24$0
Oct 20180061.443.40$0
Sep 20180059.543.11$0
Aug 20180059.403.07$0
Jul 20180065.142.93$0
Jun 20180060.183.08$0
May 20180065.382.90$0
Apr 20180063.842.90$0
Mar 20180061.222.79$0
Feb 20180061.782.77$0
Jan 20180062.874.01$0
Dec 20170057.272.92$0
Nov 20170055.423.12$0
Oct 20170049.292.98$0
Sep 20170047.523.09$0
Aug 20170045.373.00$0
Jul 20170043.873.09$0
Jun 20170042.493.09$0
May 20170045.373.26$0
Apr 20170047.933.21$0
Mar 20170046.772.98$0
Feb 20170050.452.95$0
Jan 2017013749.413.42$468
Dec 2016035048.763.72$1,303
Nov 2016013242.492.64$349
Oct 2016033946.193.09$1,048
Sep 2016032841.553.10$1,017
Aug 201608341.442.92$243
Jul 2016010641.622.92$310
Jun 201605145.352.69$137
May 20160342.521.99$6
Apr 201608036.561.99$159
Mar 20160433.011.79$7
Feb 20161026.472.06$26
Jan 20163727.352.36$99
Dec 20150032.362.00$0
Nov 20150038.792.17$0
Oct 20150043.552.43$0
Sep 20150042.992.76$0
Aug 20153040.162.87$120
Jul 20155810848.152.95$3,111
Jun 201515336756.152.88$9,649
May 201515338355.212.96$9,579
Apr 201514632349.822.71$8,148
Mar 201519135942.892.93$9,246
Feb 201515640944.662.98$8,184
Jan 201512944343.433.10$6,976
Dec 201417254254.693.59$11,353
Nov 201412463770.464.25$11,445
Oct 201421971278.303.90$19,925
Sep 201418463686.164.05$18,426
Aug 201414072489.394.04$15,436
Jul 201419881196.564.18$22,509
Jun 201415877898.164.74$19,195
May 201413266694.734.73$15,652
Apr 201413367995.944.81$16,025
Mar 201413673995.895.06$16,778
Feb 201411460497.406.19$14,844
Jan 201416370490.404.86$18,157
Dec 201312576091.824.35$14,787
Nov 201310669088.853.74$11,998
Oct 201314680797.423.78$17,273
Sep 2013144591104.113.72$17,189
Aug 2013153183104.253.52$16,595
Jul 2013145184102.523.72$15,549
Jun 201315426294.403.93$15,568
May 201316168394.834.15$18,101
Apr 201317659993.964.28$19,102
Mar 201317837193.623.91$18,116
Feb 201314563991.233.42$15,414
Jan 201318054891.603.42$18,362
Dec 201217753786.773.42$17,195
Nov 201218466286.953.62$18,399
Oct 201220561789.383.40$20,421
Sep 201217760394.672.92$18,516
Aug 201218062492.662.91$18,493
Jul 201212840785.133.02$12,126
Jun 201211950379.822.52$10,766
May 201214156391.612.49$14,318
Apr 2012151547101.652.00$16,441
Mar 2012154597105.052.22$17,504
Feb 2012188537101.102.57$20,387
Jan 201220265698.092.73$21,608
Dec 201116062896.873.24$17,534
Nov 201117765095.723.31$19,095
Oct 201114562484.983.65$14,599
Sep 201111163283.623.99$11,801
Aug 201113659883.404.15$13,824
Jul 201114659394.144.52$16,423
Jun 201113653292.904.64$15,103
May 201114261498.134.40$16,639
Apr 2011119520105.964.33$14,863
Mar 201115766696.364.06$17,831
Feb 201113059085.644.18$13,599
Jan 201117766586.504.59$18,362
Dec 201016965485.734.35$17,332
Nov 201014150680.843.80$13,319
Oct 201013057278.103.51$12,160
Sep 201013579872.633.98$12,981
Aug 2010661,19773.684.42$10,153
Jul 201011782972.554.74$12,415
Jun 201014158070.364.91$12,769
May 201012562171.124.24$11,520
Apr 201013660881.694.12$13,616
Mar 201016167178.394.39$15,566
Feb 201013859373.585.44$13,381
Jan 201015765774.365.96$15,593
Dec 200915061371.445.48$14,078
Nov 200915758974.593.75$13,920
Oct 200918656772.544.11$15,823
Sep 200918659665.543.06$14,017
Aug 200913451067.423.22$10,676
Jul 200919758361.133.46$14,062
Jun 200921557466.163.90$16,460
May 200921057654.743.93$13,757
Apr 200921260146.773.59$12,071
Mar 200919856542.144.06$10,637
Feb 20097333132.814.63$3,929
Jan 200924465635.865.37$12,273
Dec 200813036737.105.98$7,017
Nov 200820756555.496.86$15,363
Oct 200821957975.246.92$20,485
Sep 2008173527101.767.88$21,756
Aug 2008129541114.228.48$19,324
Jul 2008135518131.0811.39$23,596
Jun 2008161465131.3313.03$27,204
May 2008294556123.1711.57$42,647
Apr 2008306506110.3110.45$39,045
Mar 2008331519101.909.66$38,745
Feb 200829950792.538.77$32,113
Jan 200816129690.388.21$16,980
Dec 200718128888.337.30$18,091
Nov 200717231991.677.29$18,093
Oct 200721971682.856.92$23,100
Sep 200717773475.846.24$18,007
Aug 200716774269.066.39$16,273
Jul 200745481670.906.39$37,401
Jun 200740179762.007.55$30,878
May 200745681158.747.85$33,149
Apr 200745265459.617.81$32,048
Mar 200750468956.927.30$33,719

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jan 2017 — as filed, then multipliedworked
Oil                    0 bbl  × $ 49.41 =         $0
Casinghead gas       137 Mcf  × $  3.42 =       $468

────────────────────────────────────────────────────
Month total                                     $468

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/O/16164 is the state's own key, not one this site invented.