BOULWARE

Operated by PETX OPERATING LLC (P-5 102221) in the H-J (CROSSCUT) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 17042District 7CField 37680200OilCasinghead gasSaveExport
Value, all time
$1.2 M
Jul 2009 – May 2026
Value, last 12 filed months
$7 k
at the published price for each month
Months reported
203
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 1 leases and 1 wells, and the rule below applies to all of them.

Discovered
2009-07-27
as the register files it
Field class
Oil
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: WELL TO 9/15/09.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition16,102 bbl$1,191,846
Casinghead gasProduction3,032 Mcf$15,058
Total$1,206,904

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.1303, -100.4904. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

31.13029, -100.49041 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
5,682 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 5,682 ft.

Completions filed
Sep 2009
1 of 1 wells

1 well

42-4513262315,682 ftSep 2009

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (203)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

203 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 2025107066.483.13$7,113
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 2024162069.612.36$11,277
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 2024169084.451.66$14,272
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 2023169077.892.81$13,163
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 2023171070.622.23$12,076
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 2022165087.185.86$14,385
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 20221690115.097.98$19,450
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 2022171091.054.86$15,570
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 2021166077.435.24$12,853
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 2021170060.362.76$10,261
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 2021168050.412.81$8,469
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 2020170034.901.69$5,933
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 2020168049.881.98$8,380
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 2019173053.472.42$9,250
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 2019171056.272.46$9,622
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 20190062.632.75$0
Mar 2019166056.803.06$9,429
Feb 20190050.852.79$0
Jan 20190046.033.23$0
Dec 2018174046.594.19$8,107
Nov 20180052.934.24$0
Oct 20180061.443.40$0
Sep 20180059.543.11$0
Aug 2018173059.403.07$10,276
Jul 20180065.142.93$0
Jun 20180060.183.08$0
May 2018173065.382.90$11,311
Apr 20180063.842.90$0
Mar 20180061.222.79$0
Feb 20180061.782.77$0
Jan 2018181062.874.01$11,379
Dec 20170057.272.92$0
Nov 20170055.423.12$0
Oct 2017179049.292.98$8,823
Sep 20170047.523.09$0
Aug 20170045.373.00$0
Jul 2017174043.873.09$7,633
Jun 20170042.493.09$0
May 2017176045.373.26$7,985
Apr 20170047.933.21$0
Mar 20170046.772.98$0
Feb 2017171050.452.95$8,627
Jan 20170049.413.42$0
Dec 20160048.763.72$0
Nov 2016178042.492.64$7,563
Oct 20160046.193.09$0
Sep 20160041.553.10$0
Aug 2016175041.442.92$7,252
Jul 20160041.622.92$0
Jun 20160045.352.69$0
May 2016177042.521.99$7,526
Apr 20160036.561.99$0
Mar 2016173033.011.79$5,711
Feb 20160026.472.06$0
Jan 2016175027.352.36$4,786
Dec 20150032.362.00$0
Nov 20150038.792.17$0
Oct 2015168043.552.43$7,316
Sep 20150042.992.76$0
Aug 2015173040.162.87$6,948
Jul 20150048.152.95$0
Jun 20150056.152.88$0
May 20150055.212.96$0
Apr 2015179049.822.71$8,918
Mar 20150042.892.93$0
Feb 2015180044.662.98$8,039
Jan 20150043.433.10$0
Dec 20140054.693.59$0
Nov 2014181070.464.25$12,753
Oct 20140078.303.90$0
Sep 2014175086.164.05$15,078
Aug 20140089.394.04$0
Jul 2014178096.564.18$17,188
Jun 20140098.164.74$0
May 2014178094.734.73$16,862
Apr 20140095.944.81$0
Mar 2014181095.895.06$17,356
Feb 20140097.406.19$0
Jan 20140090.404.86$0
Dec 2013180091.824.35$16,528
Nov 20130088.853.74$0
Oct 2013181097.423.78$17,633
Sep 201300104.113.72$0
Aug 20131710104.253.52$17,827
Jul 201300102.523.72$0
Jun 2013179094.403.93$16,898
May 2013182094.834.15$17,259
Apr 20130093.964.28$0
Mar 2013182093.623.91$17,039
Feb 2013180091.233.42$16,421
Jan 20130091.603.42$0
Dec 2012180086.773.42$15,619
Nov 2012174086.953.62$15,129
Oct 20120089.383.40$0
Sep 2012179094.672.92$16,946
Aug 20120092.662.91$0
Jul 2012176085.133.02$14,983
Jun 20120079.822.52$0
May 2012181091.612.49$16,581
Apr 20121800101.652.00$18,297
Mar 20121700105.052.22$17,859
Feb 20121800101.102.57$18,198
Jan 20120098.092.73$0
Dec 20110096.873.24$0
Nov 2011180095.723.31$17,230
Oct 20110084.983.65$0
Sep 2011186083.623.99$15,553
Aug 2011178083.404.15$14,845
Jul 2011180094.144.52$16,945
Jun 20110092.904.64$0
May 2011162098.134.40$15,897
Apr 20111610105.964.33$17,060
Mar 20110096.364.06$0
Feb 2011180085.644.18$15,415
Jan 2011180086.504.59$15,570
Dec 2010183085.734.35$15,689
Nov 20100080.843.80$0
Oct 2010359078.103.51$28,038
Sep 2010179072.633.98$13,001
Aug 2010163073.684.42$12,010
Jul 2010173072.554.74$12,551
Jun 2010179070.364.91$12,594
May 2010339071.124.24$24,110
Apr 2010360081.694.12$29,408
Mar 201035919378.394.39$28,989
Feb 201017969373.585.44$16,942
Jan 201036266474.365.96$30,878
Dec 200970250971.445.48$52,942
Nov 20091,00186874.593.75$77,921
Oct 200997510572.544.11$71,158
Sep 20090065.543.06$0
Aug 20090067.423.22$0
Jul 20090061.133.46$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jun 2025 — as filed, then multipliedworked
Oil                  107 bbl  × $ 66.48 =     $7,113
Casinghead gas         0 Mcf  × $  3.13 =         $0

────────────────────────────────────────────────────
Month total                                   $7,113

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/O/17042 is the state's own key, not one this site invented.