AMACKER-TRUST 37

Operated by APV MCCAMEY LLC (P-5 28617) in the TIPPETT (LEONARD, LOWER) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 5728District 7CField 90188415Hydrogen sulphide fieldOilCasinghead gasSaveExport
Value, all time
$812 k
Jan 1993 – Feb 2020
Value, last 12 filed months
$0
at the published price for each month
Months reported
326
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 51 leases and 101 wells, and the rule below applies to all of them.

Discovered
1962-12-27
as the register files it
Field class
Oil and gas
the register's own label
Between wells
1,200 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres.

The register flags this field for hydrogen sulphide. That is a poisonous gas that occurs naturally in some formations. The flag is a property of the field as the Commission records it. It is not a measurement taken at this lease, and it is not a statement that gas is escaping anywhere.

The Commission's schedule remark for this field reads: MULTIPLE 49B MAXIMUM 160 ACRES

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition8,579 bbl$341,021
Casinghead gasProduction122,784 Mcf$470,509
Total$811,530

31,682 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.0157, -102.1432. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

31.01574, -102.14317 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
5,700 ft
1 wells filed one
Completion to plug
44.1 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 5,700 ft.

Completions filed
Oct 1969
1 of 1 wells
Plug dates filed
Nov 2013
1 of 1 wells

Last completion to plug: a median of 44.1 years across the 1 well that filed both dates, with the middle half between 44.1 years and 44.1 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-1051087315,700 ftOct 1969Nov 2013Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (326)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

326 months

Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 20190062.632.75$0
Mar 20190056.803.06$0
Feb 20190050.852.79$0
Jan 20190046.033.23$0
Dec 20180046.594.19$0
Nov 20180052.934.24$0
Oct 20180061.443.40$0
Sep 20180059.543.11$0
Aug 20180059.403.07$0
Jul 20180065.142.93$0
Jun 20180060.183.08$0
May 20180065.382.90$0
Apr 20180063.842.90$0
Mar 20180061.222.79$0
Feb 20180061.782.77$0
Jan 20180062.874.01$0
Dec 20170057.272.92$0
Nov 20170055.423.12$0
Oct 20170049.292.98$0
Sep 20170047.523.09$0
Aug 20170045.373.00$0
Jul 20170043.873.09$0
Jun 20170042.493.09$0
May 20170045.373.26$0
Apr 20170047.933.21$0
Mar 20170046.772.98$0
Feb 20170050.452.95$0
Jan 20170049.413.42$0
Dec 20160048.763.72$0
Nov 20160042.492.64$0
Oct 2016120046.193.09$5,543
Sep 20160041.553.10$0
Aug 20160041.442.92$0
Jul 20160041.622.92$0
Jun 20160045.352.69$0
May 20160042.521.99$0
Apr 20160036.561.99$0
Mar 20160033.011.79$0
Feb 20160026.472.06$0
Jan 20160027.352.36$0
Dec 20150032.362.00$0
Nov 20150038.792.17$0
Oct 20150043.552.43$0
Sep 20150042.992.76$0
Aug 20150040.162.87$0
Jul 20150048.152.95$0
Jun 20150056.152.88$0
May 20150055.212.96$0
Apr 20150049.822.71$0
Mar 20150042.892.93$0
Feb 20150044.662.98$0
Jan 20150043.433.10$0
Dec 20140054.693.59$0
Nov 20140070.464.25$0
Oct 20140078.303.90$0
Sep 20140086.164.05$0
Aug 20140089.394.04$0
Jul 20140096.564.18$0
Jun 20140098.164.74$0
May 20140094.734.73$0
Apr 20140095.944.81$0
Mar 20140095.895.06$0
Feb 20140097.406.19$0
Jan 20140090.404.86$0
Dec 20130091.824.35$0
Nov 20130088.853.74$0
Oct 20130097.423.78$0
Sep 201300104.113.72$0
Aug 201300104.253.52$0
Jul 201300102.523.72$0
Jun 20130094.403.93$0
May 20130094.834.15$0
Apr 20130093.964.28$0
Mar 20130093.623.91$0
Feb 20130091.233.42$0
Jan 20130091.603.42$0
Dec 20120086.773.42$0
Nov 20120086.953.62$0
Oct 20120089.383.40$0
Sep 20120094.672.92$0
Aug 201225092.662.91$2,317
Jul 201232085.133.02$2,724
Jun 201227079.822.52$2,155
May 201228091.612.49$2,565
Apr 2012330101.652.00$3,354
Mar 201250105.052.22$525
Feb 201290101.102.57$910
Jan 201210098.092.73$981
Dec 201122096.873.24$2,131
Nov 201158095.723.31$5,552
Oct 201141084.983.65$3,484
Sep 20110083.623.99$0
Aug 20115083.404.15$417
Jul 20110094.144.52$0
Jun 20110092.904.64$0
May 2011026998.134.40$1,185
Apr 20110342105.964.33$1,482
Mar 2011015796.364.06$637
Feb 20118022985.644.18$7,808
Jan 2011073686.504.59$3,377
Dec 2010039385.734.35$1,709
Nov 2010061980.843.80$2,349
Oct 201018031778.103.51$15,170
Sep 2010028872.633.98$1,146
Aug 2010035373.684.42$1,560
Jul 2010032272.554.74$1,525
Jun 2010533970.364.91$2,016
May 2010032771.124.24$1,385
Apr 2010031181.694.12$1,282
Mar 2010026578.394.39$1,163
Feb 2010016473.585.44$893
Jan 201018349774.365.96$16,572
Dec 2009043771.445.48$2,396
Nov 2009349274.593.75$2,070
Oct 2009051372.544.11$2,109
Sep 200917724965.543.06$12,364
Aug 2009025467.423.22$818
Jul 2009134761.133.46$1,263
Jun 2009436766.163.90$1,694
May 20092365654.743.93$3,834
Apr 20093754646.773.59$3,689
Mar 2009276642.144.06$1,406
Feb 200915025432.814.63$6,098
Jan 20092422035.865.37$2,042
Dec 20082522037.105.98$2,242
Nov 20082043655.496.86$4,101
Oct 200812342875.246.92$12,217
Sep 20080595101.767.88$4,687
Aug 20086856114.228.48$7,947
Jul 20082896131.0811.39$10,467
Jun 200801,251131.3313.03$16,304
May 20081181,375123.1711.57$30,449
Apr 2008120627110.3110.45$19,792
Mar 20080694101.909.66$6,707
Feb 2008068092.538.77$5,964
Jan 2008068790.388.21$5,637
Dec 200711155588.337.30$13,857
Nov 2007063291.677.29$4,608
Oct 2007053582.856.92$3,703
Sep 200713624175.846.24$11,819
Aug 2007447469.066.39$3,304
Jul 2007054970.906.39$3,507
Jun 2007033262.007.55$2,506
May 200727547358.747.85$19,865
Apr 2007032059.617.81$2,498
Mar 200716872156.927.30$14,827
Feb 2007062055.108.22$5,094
Jan 2007056750.306.73$3,814
Dec 200613155956.656.92$11,289
Nov 20061172,46254.207.62$25,096
Oct 2006066054.906.01$3,969
Sep 200602,41060.085.04$12,140
Aug 200611458268.717.34$12,105
Jul 2006052169.376.34$3,305
Jun 2006049966.286.38$3,186
May 200611054566.016.42$10,763
Apr 2006036464.397.36$2,679
Mar 200610335056.707.08$8,319
Feb 2006245657.597.75$3,650
Jan 2006049760.598.93$4,440
Dec 200510734154.9413.42$10,453
Nov 2005055454.6910.59$5,866
Oct 20059456858.3413.80$13,320
Sep 2005051561.4512.08$6,221
Aug 20056284861.519.80$12,121
Jul 2005154055.697.84$4,291
Jun 2005049452.337.38$3,646
May 20053959145.226.65$5,694
Apr 2005016549.207.36$1,214
Mar 200512636950.377.15$8,987
Feb 20057857945.226.31$7,182
Jan 2005053843.166.32$3,401
Dec 20046060539.866.75$6,476
Nov 2004161045.286.33$3,907
Oct 2004058149.706.52$3,785
Sep 20045954943.245.28$5,452
Aug 2004043342.375.55$2,403
Jul 20045860638.286.08$5,907
Jun 2004052036.106.43$3,345
May 2004038337.486.49$2,487
Apr 20045133934.475.86$3,744
Mar 2004046234.365.53$2,555
Feb 2004045632.455.51$2,512
Jan 200411441032.036.30$6,234
Dec 200312449930.266.30$6,897
Nov 2003052128.804.60$2,394
Oct 2003048628.174.76$2,313
Sep 2003053626.314.75$2,546
Aug 2003046229.765.13$2,370
Jul 2003044329.415.17$2,291
Jun 20039340728.565.98$5,091
May 2003048326.595.97$2,885
Apr 2003049326.675.41$2,666
Mar 2003046331.146.10$2,822
Feb 2003036733.487.93$2,909
Jan 200310131830.315.58$4,836
Dec 2002039526.914.85$1,917
Nov 2002039924.664.14$1,651
Oct 20026739326.464.23$3,435
Sep 2002041327.443.64$1,501
Aug 2002040625.963.16$1,285
Jul 2002047724.583.06$1,460
Jun 2002053423.733.34$1,783
May 20026551524.663.58$3,449
Apr 2002041723.653.51$1,465
Mar 2002552422.003.10$1,736
Feb 200211841018.222.38$3,124
Jan 2002032717.172.38$777
Dec 2001048316.932.36$1,142
Nov 2001034018.072.41$818
Oct 200115940519.782.53$4,169
Sep 2001041424.262.25$932
Aug 2001030224.873.05$922
Jul 2001038423.933.20$1,228
Jun 2001039024.563.82$1,491
May 2001012125.524.31$521
Apr 200112437424.685.34$5,056
Mar 2001041924.545.38$2,253
Feb 2001032627.755.77$1,880
Jan 2001024327.478.40$2,041
Dec 20006134626.889.12$4,796
Nov 2000020632.215.66$1,166
Oct 20006143631.235.15$4,148
Sep 2000029931.875.19$1,551
Aug 2000030529.644.54$1,385
Jul 20006048528.534.09$3,695
Jun 20006040429.304.40$3,534
May 2000038127.263.68$1,402
Apr 20006046624.513.12$2,923
Mar 2000045628.422.86$1,304
Feb 20004337227.622.73$2,202
Jan 20004543325.272.48$2,211
Dec 19994724624.282.42$1,737
Nov 19994443223.192.43$2,072
Oct 1999060420.982.80$1,693
Sep 19994542421.752.62$2,089
Aug 1999037219.262.88$1,070
Jul 19996431517.892.37$1,892
Jun 1999047815.942.36$1,129
May 19993136315.792.32$1,332
Apr 19992027415.102.21$907
Mar 1999615,34512.471.84$10,587
Feb 199901,8789.981.82$3,414
Jan 19994441610.381.90$1,247
Dec 1998184839.201.77$1,022
Nov 1998056010.892.19$1,224
Oct 1998052112.421.97$1,026
Sep 19981842912.592.08$1,120
Aug 199814757411.301.91$2,756
Jul 199813750411.742.24$2,736
Jun 1998065011.242.24$1,454
May 1998070312.622.21$1,551
Apr 1998064713.042.51$1,621
Mar 199817260112.802.31$3,590
Feb 1998056413.952.30$1,297
Jan 1998059114.702.15$1,273
Dec 1997056416.322.41$1,360
Nov 1997054618.193.09$1,686
Oct 199716558019.253.15$5,003
Sep 1997052617.742.95$1,554
Aug 1997056617.862.55$1,446
Jul 1997062917.582.25$1,413
Jun 1997061217.242.26$1,381
May 199716966318.972.31$4,736
Apr 1997052817.882.08$1,100
Mar 1997052318.951.94$1,014
Feb 1997040020.492.21$882
Jan 199716245923.483.54$5,428
Dec 1996045723.32$0
Nov 1996051821.97$0
Oct 1996058023.31$0
Sep 199616851622.22$3,733
Aug 1996066920.26$0
Jul 1996072719.55$0
Jun 1996068418.73$0
May 199616672319.43$3,225
Apr 1996061621.51$0
Mar 1996069019.38$0
Feb 1996058416.98$0
Jan 199632069117.07$5,462
Dec 1995065117.19$0
Nov 1995067216.00$0
Oct 1995088815.43$0
Sep 199516965516.18$2,734
Aug 1995072015.92$0
Jul 1995071515.24$0
Jun 1995067816.41$0
May 199517671417.56$3,091
Apr 1995065917.73$0
Mar 1995066216.44$0
Feb 1995060616.58$0
Jan 199515863115.92$2,515
Dec 1994066815.03$0
Nov 1994067115.90$0
Oct 199415773615.58$2,446
Sep 1994073115.29$0
Aug 1994078016.13$0
Jul 1994047617.56$0
Jun 199417716317.09$3,025
May 19940115.88$0
Apr 199401714.14$0
Mar 1994070312.46$0
Feb 199417063112.50$2,125
Jan 1994068912.66$0
Dec 1993067012.33$0
Nov 1993066714.49$0
Oct 199316670115.85$2,631
Sep 1993068915.03$0
Aug 199301,37915.66$0
Jul 1993073215.46$0
Jun 199315368716.79$2,569
May 199301,45617.68$0
Apr 1993070718.05$0
Mar 199316570418.14$2,993
Feb 1993063617.90$0
Jan 1993068216.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Oct 2016 — as filed, then multipliedworked
Oil                  120 bbl  × $ 46.19 =     $5,543
Casinghead gas         0 Mcf  × $  3.09 =         $0

────────────────────────────────────────────────────
Month total                                   $5,543

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/O/5728 is the state's own key, not one this site invented.