BLW

Operated by GIEBEL PETROLEUM LTD. (P-5 304280) in the LOOP, NE. (YATES) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 183095District 8AField 54852500GasSaveExport
Value, all time
$766 k
Nov 2000 – Feb 2008
Value, last 12 filed months
$0
at the published price for each month
Months reported
88
no gaps in the span
Streams
1
gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 14 leases and 14 wells, and the rule below applies to all of them.

Discovered
1966-01-20
as the register files it
Field class
Gas
the register's own label
Between wells
2,640 ft
minimum
From a lease line
1,320 ft
minimum

A drilling unit in this field needs at least 320 acres.

The Commission's schedule remark for this field reads: ALLOCATION FORMULA ADMINISTRATIVELY SUSPENDED 3/1/94

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
GasProduction145,883 Mcf$766,099
Total$766,099

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.9201, -102.4062. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.92012, -102.40623 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
5,470 ft
1 wells filed one
Completion to plug
7.3 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 5,470 ft.

Completions filed
Nov 2000
1 of 1 wells
Plug dates filed
Feb 2008
1 of 1 wells

Last completion to plug: a median of 7.3 years across the 1 well that filed both dates, with the middle half between 7.3 years and 7.3 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-1653561415,470 ftNov 2000Feb 2008Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (88)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

88 months

Feb 2008092.538.77$0
Jan 2008090.388.21$0
Dec 2007088.337.30$0
Nov 2007091.677.29$0
Oct 2007082.856.92$0
Sep 2007075.846.24$0
Aug 2007069.066.39$0
Jul 2007070.906.39$0
Jun 2007062.007.55$0
May 2007058.747.85$0
Apr 2007059.617.81$0
Mar 2007056.927.30$0
Feb 2007055.108.22$0
Jan 2007050.306.73$0
Dec 2006056.656.92$0
Nov 2006054.207.62$0
Oct 2006054.906.01$0
Sep 2006060.085.04$0
Aug 2006068.717.34$0
Jul 2006069.376.34$0
Jun 2006066.286.38$0
May 2006066.016.42$0
Apr 2006064.397.36$0
Mar 2006056.707.08$0
Feb 200676957.597.75$5,961
Jan 20061,58160.598.93$14,124
Dec 20051,29354.9413.42$17,346
Nov 20051,45954.6910.59$15,448
Oct 20051,37558.3413.80$18,969
Sep 20051,19761.4512.08$14,459
Aug 20051,44361.519.80$14,137
Jul 20051,38055.697.84$10,824
Jun 20051,33552.337.38$9,854
May 20051,65045.226.65$10,974
Apr 20051,67049.207.36$12,292
Mar 20051,95650.377.15$13,995
Feb 20051,65245.226.31$10,427
Jan 20052,05243.166.32$12,973
Dec 20041,80839.866.75$12,206
Nov 20041,86145.286.33$11,781
Oct 20041,90449.706.52$12,405
Sep 20042,13243.245.28$11,265
Aug 20042,02142.375.55$11,218
Jul 20042,18238.286.08$13,276
Jun 20042,01836.106.43$12,982
May 20042,08137.486.49$13,515
Apr 20041,93534.475.86$11,336
Mar 20041,95834.365.53$10,828
Feb 20041,90132.455.51$10,474
Jan 20042,14932.036.30$13,538
Dec 20032,08130.266.30$13,114
Nov 20032,14128.804.60$9,838
Oct 20032,51028.174.76$11,947
Sep 20032,63126.314.75$12,496
Aug 20032,36629.765.13$12,137
Jul 20032,16329.415.17$11,185
Jun 20031,59828.565.98$9,561
May 20032,11026.595.97$12,602
Apr 20032,15626.675.41$11,658
Mar 20032,20231.146.10$13,423
Feb 20032,11933.487.93$16,795
Jan 20032,27130.315.58$12,677
Dec 20022,46526.914.85$11,965
Nov 20022,38524.664.14$9,867
Oct 20022,59726.464.23$10,983
Sep 20022,19427.443.64$7,976
Aug 20022,40925.963.16$7,622
Jul 20022,54624.583.06$7,795
Jun 20022,39123.733.34$7,982
May 20022,70924.663.58$9,709
Apr 20023,09423.653.51$10,867
Mar 20023,19422.003.10$9,910
Feb 20022,78718.222.38$6,621
Jan 20023,21517.172.38$7,638
Dec 20013,85216.932.36$9,108
Nov 20012,65818.072.41$6,394
Oct 20013,15319.782.53$7,974
Sep 20013,13224.262.25$7,051
Aug 20013,26224.873.05$9,959
Jul 20013,24023.933.20$10,359
Jun 20013,65024.563.82$13,958
May 20014,17025.524.31$17,962
Apr 20013,23124.685.34$17,238
Mar 20014,33824.545.38$23,323
Feb 20013,13027.755.77$18,051
Jan 20014,97127.478.40$41,750
Dec 2000026.889.12$0
Nov 2000032.215.66$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Feb 2006 — as filed, then multipliedworked
Gas                  769 Mcf  × $  7.75 =     $5,961

────────────────────────────────────────────────────
Month total                                   $5,961

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 8A/G/183095 is the state's own key, not one this site invented.