BAGGETT, DEBBIE

Operated by POWER UPP MIDLAND 1 LLC (P-5 103701) in the HARRIS (YATES) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 203747District 8AField 39242666CondensateGasSaveExport
Value, all time
$2.6 M
Mar 2004 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
267
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 30 leases and 30 wells, and the rule below applies to all of them.

Discovered
1961-06-26
as the register files it
Field class
Gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: SUSPENDED AND ALL OVERPRODUCTION CANCELLED.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition165 bbl$13,102
GasProduction434,612 Mcf$2,599,030
Total$2,612,132

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.5478, -102.6916. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.54779, -102.69156 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
3,200 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 3,200 ft.

Completions filed
Mar 2004
1 of 1 wells

1 well

42-165360282Y3,200 ftMar 2004

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (267)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

267 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 20190062.632.75$0
Mar 20190056.803.06$0
Feb 20190050.852.79$0
Jan 20190046.033.23$0
Dec 20180046.594.19$0
Nov 20180052.934.24$0
Oct 20180061.443.40$0
Sep 20180059.543.11$0
Aug 20180059.403.07$0
Jul 20180065.142.93$0
Jun 20180060.183.08$0
May 20180065.382.90$0
Apr 20180063.842.90$0
Mar 20180061.222.79$0
Feb 20180061.782.77$0
Jan 20180062.874.01$0
Dec 20170057.272.92$0
Nov 20170055.423.12$0
Oct 20170049.292.98$0
Sep 20170047.523.09$0
Aug 20170045.373.00$0
Jul 20170043.873.09$0
Jun 20170042.493.09$0
May 20170045.373.26$0
Apr 20170047.933.21$0
Mar 20170046.772.98$0
Feb 20170050.452.95$0
Jan 20170049.413.42$0
Dec 20160048.763.72$0
Nov 20160042.492.64$0
Oct 20160046.193.09$0
Sep 20160041.553.10$0
Aug 20160041.442.92$0
Jul 20160041.622.92$0
Jun 20160045.352.69$0
May 20160042.521.99$0
Apr 20160036.561.99$0
Mar 20160033.011.79$0
Feb 20160026.472.06$0
Jan 20160027.352.36$0
Dec 201501,16032.362.00$2,322
Nov 201501,31538.792.17$2,850
Oct 201501,46043.552.43$3,543
Sep 201501,38342.992.76$3,815
Aug 201501,50240.162.87$4,314
Jul 201501,62348.152.95$4,780
Jun 201501,22356.152.88$3,526
May 2015089255.212.96$2,636
Apr 201501,50849.822.71$4,082
Mar 201501,58042.892.93$4,637
Feb 201501,52244.662.98$4,530
Jan 201501,62643.433.10$5,042
Dec 201401,87754.693.59$6,741
Nov 201401,74270.464.25$7,407
Oct 201402,03178.303.90$7,923
Sep 201401,82586.164.05$7,383
Aug 201402,10289.394.04$8,482
Jul 2014056096.564.18$2,341
Jun 201401,24598.164.74$5,897
May 201401,41994.734.73$6,707
Apr 201401,43195.944.81$6,882
Mar 201401,74695.895.06$8,829
Feb 201401,46997.406.19$9,096
Jan 201401,77990.404.86$8,647
Dec 201301,95991.824.35$8,530
Nov 201301,98988.853.74$7,435
Oct 2013211,90497.423.78$9,242
Sep 201301,925104.113.72$7,157
Aug 201302,080104.253.52$7,327
Jul 201302,355102.523.72$8,755
Jun 201303,02394.403.93$11,891
May 201302,51294.834.15$10,422
Apr 201301,97793.964.28$8,467
Mar 201302,02393.623.91$7,916
Feb 201301,91791.233.42$6,556
Jan 2013392,12391.603.42$10,833
Dec 201202,10786.773.42$7,206
Nov 201202,29086.953.62$8,301
Oct 201202,44989.383.40$8,326
Sep 201202,33894.672.92$6,823
Aug 201202,46692.662.91$7,172
Jul 201202,53085.133.02$7,643
Jun 201202,53779.822.52$6,391
May 201202,53591.612.49$6,308
Apr 201202,605101.652.00$5,202
Mar 201202,576105.052.22$5,724
Feb 201202,641101.102.57$6,788
Jan 201202,62198.092.73$7,166
Dec 201102,81696.873.24$9,123
Nov 201102,77295.723.31$9,179
Oct 201102,85884.983.65$10,428
Sep 201103,09683.623.99$12,340
Aug 201102,10783.404.15$8,743
Jul 201102,93094.144.52$13,236
Jun 201102,88492.904.64$13,381
May 201102,99898.134.40$13,206
Apr 201102,805105.964.33$12,155
Mar 201103,21396.364.06$13,036
Feb 201102,92885.644.18$12,239
Jan 201103,31686.504.59$15,216
Dec 201003,13485.734.35$13,626
Nov 201003,25880.843.80$12,365
Oct 201003,19378.103.51$11,204
Sep 201003,37872.633.98$13,443
Aug 201003,38973.684.42$14,977
Jul 201003,55672.554.74$16,843
Jun 201033,34570.364.91$16,636
May 201003,48671.124.24$14,764
Apr 201003,35181.694.12$13,815
Mar 201003,47578.394.39$15,251
Feb 201003,33473.585.44$18,145
Jan 201003,55574.365.96$21,202
Dec 2009613,26271.445.48$22,246
Nov 200903,43974.593.75$12,901
Oct 200903,69472.544.11$15,183
Sep 200903,73665.543.06$11,450
Aug 200903,60667.423.22$11,606
Jul 200903,95661.133.46$13,706
Jun 200903,58266.163.90$13,952
May 200904,33354.743.93$17,010
Apr 200904,11646.773.59$14,766
Mar 200904,07342.144.06$16,532
Feb 200902,50532.814.63$11,606
Jan 200904,46335.865.37$23,971
Dec 200801,66237.105.98$9,934
Nov 200804,15955.496.86$28,532
Oct 200803,50975.246.92$24,289
Sep 200802,540101.767.88$20,008
Aug 200803,826114.228.48$32,456
Jul 200804,292131.0811.39$48,883
Jun 200802,832131.3313.03$36,908
May 200803,657123.1711.57$42,327
Apr 200804,431110.3110.45$46,325
Mar 200803,596101.909.66$34,752
Feb 200803,85092.538.77$33,767
Jan 200803,64690.388.21$29,918
Dec 200703,39288.337.30$24,768
Nov 200783,10591.677.29$23,374
Oct 200702,53182.856.92$17,520
Sep 200703,13675.846.24$19,582
Aug 200701,80869.066.39$11,549
Jul 200704,14270.906.39$26,459
Jun 200702,72462.007.55$20,562
May 200703,23158.747.85$25,351
Apr 200704,75559.617.81$37,114
Mar 200704,84656.927.30$35,385
Feb 200703,71055.108.22$30,481
Jan 200704,91650.306.73$33,069
Dec 200605,04356.656.92$34,890
Nov 200604,89254.207.62$37,265
Oct 200603,48554.906.01$20,958
Sep 200604,53860.085.04$22,859
Aug 200604,91068.717.34$36,039
Jul 200605,28169.376.34$33,496
Jun 2006124,42966.286.38$29,070
May 2006214,81366.016.42$32,310
Apr 200605,28064.397.36$38,863
Mar 200604,85456.707.08$34,380
Feb 200605,13457.597.75$39,794
Jan 200605,85660.598.93$52,314
Dec 200506,11254.9413.42$81,995
Nov 200506,35454.6910.59$67,279
Oct 200506,16958.3413.80$85,106
Sep 200504,33361.4512.08$52,338
Aug 200503,87561.519.80$37,963
Jul 200504,95655.697.84$38,873
Jun 200506,65852.337.38$49,143
May 200502,22045.226.65$14,766
Apr 2005014649.207.36$1,075
Mar 200502,81150.377.15$20,112
Feb 2005016645.226.31$1,048
Jan 2005079343.166.32$5,014
Dec 200402,81639.866.75$19,011
Nov 200405,89045.286.33$37,286
Oct 200402,91449.706.52$18,985
Sep 200402,66043.245.28$14,055
Aug 200404,63342.375.55$25,716
Jul 200404,79538.286.08$29,174
Jun 200402,08636.106.43$13,419
May 200409,97037.486.49$64,751
Apr 20040034.475.86$0
Mar 20040034.365.53$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Dec 2015 — as filed, then multipliedworked
Condensate             0 bbl  × $ 32.36 =         $0
Gas                1,160 Mcf  × $  2.00 =     $2,322

────────────────────────────────────────────────────
Month total                                   $2,322

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 8A/G/203747 is the state's own key, not one this site invented.