KINNEY

Operated by SHELBY PRODUCTION, INC. (P-5 773684) in the CHALK, N. (ATOKA CONGL.) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 212864District 8AField 16740500CondensateGasSaveExport
Value, all time
$262 k
Oct 2005 – Jun 2023
Value, last 12 filed months
$0
at the published price for each month
Months reported
213
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 3 leases and 3 wells, and the rule below applies to all of them.

Discovered
1985-05-06
as the register files it
Field class
Gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: STATEWIDE RULES IN EFFECT

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition91 bbl$6,647
GasProduction58,118 Mcf$255,329
Total$261,976

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 33.8744, -100.2130. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

33.87443, -100.21305 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
6,543 ft
1 wells filed one
Completion to plug
17.0 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,543 ft.

Completions filed
Oct 2005
1 of 1 wells
Plug dates filed
Oct 2022
1 of 1 wells

Last completion to plug: a median of 17.0 years across the 1 well that filed both dates, with the middle half between 17.0 years and 17.0 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-1013063316,543 ftOct 2005Oct 2022Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (213)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

213 months

Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 202048044.642.68$2,143
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190155.302.75$3
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 2019031858.482.74$871
Apr 2019049262.632.75$1,353
Mar 2019051356.803.06$1,571
Feb 2019043150.852.79$1,203
Jan 2019051646.033.23$1,666
Dec 2018053546.594.19$2,239
Nov 2018050152.934.24$2,123
Oct 2018051561.443.40$1,750
Sep 2018048459.543.11$1,504
Aug 2018050559.403.07$1,549
Jul 2018046765.142.93$1,369
Jun 2018044260.183.08$1,360
May 2018043865.382.90$1,271
Apr 2018039863.842.90$1,155
Mar 2018038161.222.79$1,062
Feb 2018027561.782.77$761
Jan 201807362.874.01$293
Dec 2017049357.272.92$1,440
Nov 2017055255.423.12$1,721
Oct 2017056049.292.98$1,671
Sep 2017031147.523.09$960
Aug 2017057445.373.00$1,725
Jul 2017056443.873.09$1,741
Jun 2017054542.493.09$1,683
May 2017053445.373.26$1,743
Apr 2017050647.933.21$1,625
Mar 2017051646.772.98$1,540
Feb 2017044050.452.95$1,299
Jan 2017044549.413.42$1,521
Dec 2016037948.763.72$1,411
Nov 2016027142.492.64$717
Oct 2016020646.193.09$637
Sep 2016022541.553.10$698
Aug 2016027341.442.92$798
Jul 2016013941.622.92$406
Jun 2016018745.352.69$502
May 2016015642.521.99$311
Apr 2016024036.561.99$478
Mar 2016062433.011.79$1,119
Feb 2016061926.472.06$1,277
Jan 2016066827.352.36$1,579
Dec 2015063132.362.00$1,263
Nov 2015055138.792.17$1,194
Oct 2015065843.552.43$1,597
Sep 2015062342.992.76$1,719
Aug 2015048440.162.87$1,390
Jul 2015056048.152.95$1,649
Jun 2015050856.152.88$1,464
May 2015027955.212.96$825
Apr 2015039449.822.71$1,066
Mar 2015054542.892.93$1,599
Feb 2015046744.662.98$1,390
Jan 2015036743.433.10$1,138
Dec 2014045854.693.59$1,645
Nov 2014030370.464.25$1,288
Oct 2014025578.303.90$995
Sep 201407186.164.05$287
Aug 201407489.394.04$299
Jul 2014010096.564.18$418
Jun 201408998.164.74$422
May 2014028994.734.73$1,366
Apr 2014024495.944.81$1,173
Mar 2014036795.895.06$1,856
Feb 2014027497.406.19$1,697
Jan 2014029490.404.86$1,429
Dec 2013025891.824.35$1,123
Nov 2013027188.853.74$1,013
Oct 2013029297.423.78$1,104
Sep 20130139104.113.72$517
Aug 20130200104.253.52$705
Jul 20130343102.523.72$1,275
Jun 2013026294.403.93$1,031
May 2013246194.834.15$2,102
Apr 2013331993.964.28$1,648
Mar 2013036093.623.91$1,409
Feb 2013452391.233.42$2,154
Jan 2013049591.603.42$1,693
Dec 2012335286.773.42$1,464
Nov 2012363586.953.62$2,563
Oct 201258989.383.40$749
Sep 2012031294.672.92$911
Aug 2012030292.662.91$878
Jul 2012179585.133.02$2,487
Jun 2012045379.822.52$1,141
May 2012341591.612.49$1,307
Apr 20120308101.652.00$615
Mar 20120186105.052.22$413
Feb 20120234101.102.57$601
Jan 2012053898.092.73$1,471
Dec 2011043596.873.24$1,409
Nov 2011015095.723.31$497
Oct 201105484.983.65$197
Sep 20110083.623.99$0
Aug 20110083.404.15$0
Jul 20110094.144.52$0
Jun 20110092.904.64$0
May 20110098.134.40$0
Apr 201100105.964.33$0
Mar 20110096.364.06$0
Feb 201102085.644.18$84
Jan 201104386.504.59$197
Dec 2010044785.734.35$1,943
Nov 201003,49080.843.80$13,246
Oct 201003,20678.103.51$11,250
Sep 201002,24772.633.98$8,942
Aug 2010028673.684.42$1,264
Jul 2010015272.554.74$720
Jun 2010012470.364.91$609
May 2010013871.124.24$584
Apr 2010018281.694.12$750
Mar 2010020678.394.39$904
Feb 2010022873.585.44$1,241
Jan 2010024374.365.96$1,449
Dec 2009021171.445.48$1,157
Nov 2009011474.593.75$428
Oct 2009017072.544.11$699
Sep 20090065.543.06$0
Aug 20090067.423.22$0
Jul 2009016361.133.46$565
Jun 2009052666.163.90$2,049
May 2009029154.743.93$1,142
Apr 200902346.773.59$83
Mar 200906342.144.06$256
Feb 20090832.814.63$37
Jan 200901035.865.37$54
Dec 200806337.105.98$377
Nov 20080055.496.86$0
Oct 2008013275.246.92$914
Sep 20080115101.767.88$906
Aug 20080247114.228.48$2,095
Jul 20080264131.0811.39$3,007
Jun 20080199131.3313.03$2,593
May 20081943123.1711.57$2,838
Apr 20080126110.3110.45$1,317
Mar 20080126101.909.66$1,218
Feb 200809992.538.77$868
Jan 2008012590.388.21$1,026
Dec 2007015988.337.30$1,161
Nov 2007021291.677.29$1,546
Oct 2007022182.856.92$1,530
Sep 200706875.846.24$425
Aug 200706869.066.39$434
Jul 200709170.906.39$581
Jun 2007013962.007.55$1,049
May 2007048558.747.85$3,805
Apr 2007047659.617.81$3,715
Mar 2007035456.927.30$2,585
Feb 2007036355.108.22$2,982
Jan 2007064250.306.73$4,319
Dec 2006011356.656.92$782
Nov 200608554.207.62$647
Oct 2006024654.906.01$1,479
Sep 20060060.085.04$0
Aug 20060068.717.34$0
Jul 20060069.376.34$0
Jun 20060266.286.38$13
May 2006010366.016.42$662
Apr 2006017364.397.36$1,273
Mar 2006020156.707.08$1,424
Feb 2006037657.597.75$2,914
Jan 2006070660.598.93$6,307
Dec 200501,70254.9413.42$22,833
Nov 200501,62554.6910.59$17,206
Oct 20050058.3413.80$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Dec 2020 — as filed, then multipliedworked
Condensate            48 bbl  × $ 44.64 =     $2,143
Gas                    0 Mcf  × $  2.68 =         $0

────────────────────────────────────────────────────
Month total                                   $2,143

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 8A/G/212864 is the state's own key, not one this site invented.