OIL DEV. CO. "20"

Operated by BLM BLACK GOLD PROPERTIES, LTD. (P-5 75774) in the SMYER field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 12596District 8AField 84345001Hydrogen sulphide fieldOilCasinghead gasSaveExport
Value, all time
$1.1 M
Jan 1993 – May 2014
Value, last 12 filed months
$4 k
at the published price for each month
Months reported
257
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 61 leases and 456 wells, and the rule below applies to all of them.

Discovered
1944-01-07
as the register files it
Field class
Oil
the register's own label
Between wells
933 ft
minimum
From a lease line
440 ft
minimum

A drilling unit in this field needs at least 40 acres.

The register flags this field for hydrogen sulphide. That is a poisonous gas that occurs naturally in some formations. The flag is a property of the field as the Commission records it. It is not a measurement taken at this lease, and it is not a statement that gas is escaping anywhere.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition42,461 bbl$1,058,737
Casinghead gasProduction241 Mcf$964
Total$1,059,701

43 Mcf of this lease's gas, across 43 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 33.5739, -102.1387. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

33.57391, -102.13872 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
10,300 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 10,300 ft.

Plug dates filed
Jun 2013
1 of 1 wells

1 well

42-21901052110,300 ftJun 2013Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (257)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

257 months

May 20140094.734.73$0
Apr 20140095.944.81$0
Mar 20140095.895.06$0
Feb 20140097.406.19$0
Jan 20140090.404.86$0
Dec 20130091.824.35$0
Nov 201346088.853.74$4,087
Oct 20130097.423.78$0
Sep 201300104.113.72$0
Aug 201300104.253.52$0
Jul 201300102.523.72$0
Jun 20133194.403.93$287
May 20130194.834.15$4
Apr 20130193.964.28$4
Mar 20130193.623.91$4
Feb 20130191.233.42$3
Jan 20130191.603.42$3
Dec 20120186.773.42$3
Nov 20120186.953.62$4
Oct 20120189.383.40$3
Sep 20120194.672.92$3
Aug 20120192.662.91$3
Jul 20120185.133.02$3
Jun 20120179.822.52$3
May 20120191.612.49$2
Apr 201201101.652.00$2
Mar 201201105.052.22$2
Feb 201201101.102.57$3
Jan 20120198.092.73$3
Dec 20110196.873.24$3
Nov 20110195.723.31$3
Oct 20110184.983.65$4
Sep 20110183.623.99$4
Aug 20110183.404.15$4
Jul 20110194.144.52$5
Jun 20110192.904.64$5
May 20110198.134.40$4
Apr 201101105.964.33$4
Mar 20110196.364.06$4
Feb 20110185.644.18$4
Jan 20110186.504.59$5
Dec 20100185.734.35$4
Nov 20100180.843.80$4
Oct 20100178.103.51$4
Sep 20100172.633.98$4
Aug 20100173.684.42$4
Jul 20100172.554.74$5
Jun 20100170.364.91$5
May 2010164171.124.24$11,668
Apr 20100181.694.12$4
Mar 20100178.394.39$4
Feb 20100173.585.44$5
Jan 20100174.365.96$6
Dec 20090171.445.48$5
Nov 20090174.593.75$4
Oct 2009166172.544.11$12,046
Sep 20090165.543.06$3
Aug 20090167.423.22$3
Jul 20090161.133.46$3
Jun 20090166.163.90$4
May 20090154.743.93$4
Apr 20090146.773.59$4
Mar 20090142.144.06$4
Feb 20090132.814.63$5
Jan 20090135.865.37$5
Dec 20080137.105.98$6
Nov 20080155.496.86$7
Oct 20080175.246.92$7
Sep 200801101.767.88$8
Aug 20081591114.228.48$18,169
Jul 20081641131.0811.39$21,509
Jun 200801131.3313.03$13
May 20081681123.1711.57$20,704
Apr 200801110.3110.45$10
Mar 20081651101.909.66$16,823
Feb 20080192.538.77$9
Jan 2008152190.388.21$13,746
Dec 2007171188.337.30$15,112
Nov 20070191.677.29$7
Oct 2007164182.856.92$13,594
Sep 2007167175.846.24$12,672
Aug 20070169.066.39$6
Jul 20070170.906.39$6
Jun 2007325162.007.55$20,158
May 20070158.747.85$8
Apr 2007161159.617.81$9,605
Mar 20070156.927.30$7
Feb 2007174155.108.22$9,596
Jan 20070150.306.73$7
Dec 20060156.656.92$7
Nov 2006162154.207.62$8,788
Oct 20060154.906.01$6
Sep 2006150160.085.04$9,017
Aug 20060168.717.34$7
Jul 2006148169.376.34$10,273
Jun 2006166166.286.38$11,009
May 20060166.016.42$6
Apr 2006153164.397.36$9,859
Mar 2006154156.707.08$8,739
Feb 20060157.597.75$8
Jan 2006166160.598.93$10,067
Dec 2005164154.9413.42$9,024
Nov 2005153154.6910.59$8,378
Oct 20050158.3413.80$14
Sep 2005310161.4512.08$19,062
Aug 20050161.519.80$10
Jul 2005162155.697.84$9,030
Jun 20050152.337.38$7
May 2005158145.226.65$7,151
Apr 20050149.207.36$7
Mar 20050150.377.15$7
Feb 2005157145.226.31$7,106
Jan 20050143.166.32$6
Dec 2004176139.866.75$7,022
Nov 20040145.286.33$6
Oct 20040149.706.52$7
Sep 2004148143.245.28$6,405
Aug 2004176142.375.55$7,463
Jul 20040138.286.08$6
Jun 2004149136.106.43$5,385
May 2004168137.486.49$6,303
Apr 20040134.475.86$6
Mar 20040134.365.53$6
Feb 2004175132.455.51$5,684
Jan 2004158132.036.30$5,067
Dec 2003144130.266.30$4,364
Nov 2003173128.804.60$4,987
Oct 20030128.174.76$5
Sep 2003174126.314.75$4,583
Aug 2003174129.765.13$5,183
Jul 2003155129.415.17$4,564
Jun 2003170128.565.98$4,861
May 2003166126.595.97$4,420
Apr 2003175126.675.41$4,673
Mar 2003166131.146.10$5,175
Feb 2003163133.487.93$5,465
Jan 2003336130.315.58$10,190
Dec 2002168126.914.85$4,526
Nov 20020124.664.14$4
Oct 2002174126.464.23$4,608
Sep 2002147127.443.64$4,037
Aug 2002155125.963.16$4,027
Jul 2002171124.583.06$4,206
Jun 2002173123.733.34$4,109
May 2002343124.663.58$8,462
Apr 2002175123.653.51$4,142
Mar 2002167122.003.10$3,677
Feb 20020118.222.38$2
Jan 2002173117.172.38$2,973
Dec 2001345116.932.36$5,843
Nov 2001172118.072.41$3,110
Oct 2001162119.782.53$3,207
Sep 2001168124.262.25$4,078
Aug 2001167124.873.05$4,156
Jul 2001329123.933.20$7,876
Jun 20010124.563.82$4
May 2001328125.524.31$8,375
Apr 2001164124.685.34$4,053
Mar 2001165124.545.38$4,054
Feb 2001164127.755.77$4,557
Jan 2001334127.478.40$9,183
Dec 2000163126.889.12$4,391
Nov 2000331132.215.66$10,667
Oct 2000165131.235.15$5,158
Sep 2000331131.875.19$10,554
Aug 2000168129.644.54$4,984
Jul 2000326128.534.09$9,305
Jun 2000161129.304.40$4,722
May 2000338127.263.68$9,218
Apr 2000162124.513.12$3,974
Mar 2000173128.422.86$4,920
Feb 2000346127.622.73$9,559
Jan 2000326125.272.48$8,241
Dec 1999165124.282.42$4,009
Nov 1999181123.192.43$4,200
Oct 1999354120.982.80$7,430
Sep 1999167121.752.62$3,635
Aug 1999176119.262.88$3,393
Jul 1999356117.892.37$6,371
Jun 1999357115.942.36$5,693
May 1999352115.792.32$5,560
Apr 1999351115.102.21$5,302
Mar 1999183112.471.84$2,284
Feb 199953019.981.82$5,291
Jan 1999337110.381.90$3,500
Dec 199853719.201.77$4,942
Nov 1998340110.892.19$3,705
Oct 1998357112.421.97$4,436
Sep 1998705112.592.08$8,878
Aug 1998354111.301.91$4,002
Jul 1998866111.742.24$10,169
Jun 1998519111.242.24$5,836
May 1998488112.622.21$6,161
Apr 1998171113.042.51$2,232
Mar 1998168112.802.31$2,153
Feb 1998544113.952.30$7,591
Jan 1998731114.702.15$10,748
Dec 1997701116.322.41$11,443
Nov 1997542118.193.09$9,862
Oct 1997709119.253.15$13,651
Sep 1997895117.742.95$15,880
Aug 1997886117.862.55$15,827
Jul 1997874117.582.25$15,367
Jun 1997669117.242.26$11,536
May 1997526118.972.31$9,981
Apr 1997152117.882.08$2,720
Mar 1997131118.951.94$2,484
Feb 19970120.492.21$2
Jan 1997173123.483.54$4,066
Dec 1996329123.32$7,672
Nov 1996174121.97$3,823
Oct 199677123.31$1,795
Sep 1996312122.22$6,933
Aug 1996143120.26$2,897
Jul 1996165119.55$3,226
Jun 1996320118.73$5,994
May 1996167119.43$3,245
Apr 1996335121.51$7,206
Mar 1996163119.38$3,159
Feb 1996260116.98$4,415
Jan 1996183117.07$3,124
Dec 1995338117.19$5,810
Nov 1995341116.00$5,456
Oct 1995485115.43$7,484
Sep 1995278116.18$4,498
Aug 1995329115.92$5,238
Jul 1995497115.24$7,574
Jun 1995335116.41$5,497
May 1995276117.56$4,847
Apr 1995167117.73$2,961
Mar 1995311116.44$5,113
Feb 1995174016.58$2,885
Jan 1995165015.92$2,627
Dec 1994332015.03$4,990
Nov 1994153015.90$2,433
Oct 1994159015.58$2,477
Sep 1994177115.29$2,706
Aug 1994304116.13$4,904
Jul 1994161117.56$2,827
Jun 1994323117.09$5,520
May 1994173115.88$2,747
Apr 1994324114.14$4,581
Mar 1994172112.46$2,143
Feb 1994166112.50$2,075
Jan 1994325112.66$4,115
Dec 1993166112.33$2,047
Nov 1993162114.49$2,347
Oct 1993327115.85$5,183
Sep 1993158115.03$2,375
Aug 1993164115.66$2,568
Jul 1993172115.46$2,659
Jun 1993328116.79$5,507
May 1993163117.68$2,882
Apr 1993168118.05$3,032
Mar 1993315118.14$5,714
Feb 1993335117.90$5,997
Jan 1993331116.93$5,604

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Nov 2013 — as filed, then multipliedworked
Oil                   46 bbl  × $ 88.85 =     $4,087
Casinghead gas         0 Mcf  × $  3.74 =         $0

────────────────────────────────────────────────────
Month total                                   $4,087

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 8A/O/12596 is the state's own key, not one this site invented.