LINDSEY "A"

Operated by RUSSELL, L. J. OIL COMPANY (P-5 736777) in the SHARON RIDGE (CLEAR FORK) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 61911District 8AField 82710166Hydrogen sulphide fieldOilCasinghead gasSaveExport
Value, all time
$1.5 M
Jan 1993 – May 2026
Value, last 12 filed months
$11 k
at the published price for each month
Months reported
401
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 250 leases and 1,129 wells, and the rule below applies to all of them.

Discovered
1950-10-02
as the register files it
Field class
Oil
the register's own label
Between wells
660 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 10 acres.

The register flags this field for hydrogen sulphide. That is a poisonous gas that occurs naturally in some formations. The flag is a property of the field as the Commission records it. It is not a measurement taken at this lease, and it is not a statement that gas is escaping anywhere.

The Commission's schedule remark for this field reads: CORRELATIVE INTERVAL 1996-3260'.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition34,283 bbl$1,500,784
Casinghead gasProduction401 Mcf$1,491
Total$1,502,274

48 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (3)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.5775, -101.0513. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.1 miles.

32.57723, -101.05157 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 3 wells
With a plug date
0.0%
0 of 3 wells
Median depth
3,530 ft
3 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
3100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

Between 3,248 and 3,593 ft, median 3,530 ft, over the 3 wells that filed a depth.

Completions filed
Jun 1977 – Apr 1981
3 of 3 wells

3 wells

42-4153164033,593 ftApr 1981
42-4153120923,530 ftJan 1978
42-4153089213,248 ftJun 1977

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (401)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

401 months

May 202601106.413.05$3
Apr 20260198.932.87$3
Mar 202636189.753.15$3,234
Feb 20260163.503.75$4
Jan 20260159.138.00$8
Dec 20250156.664.41$4
Nov 202567158.593.93$3,929
Oct 20250159.383.30$3
Sep 20250162.743.08$3
Aug 202558163.933.01$3,711
Jul 20250166.743.32$3
Jun 20250166.483.13$3
May 202558160.553.23$3,515
Apr 20250162.363.54$4
Mar 202532167.704.27$2,171
Feb 20250170.884.34$4
Jan 20250174.324.28$4
Dec 2024112168.993.12$7,730
Nov 20240169.052.20$2
Oct 20240171.372.28$2
Sep 20240169.612.36$2
Aug 20240175.632.06$2
Jul 202488179.932.15$7,036
Jun 20240178.082.63$3
May 20240178.812.20$2
Apr 20240184.451.66$2
Mar 202487180.301.55$6,988
Feb 20240176.091.78$2
Jan 20240173.023.30$3
Dec 20230171.262.61$3
Nov 20230177.892.81$3
Oct 20230185.443.09$3
Sep 202352189.042.74$4,633
Aug 20230180.522.67$3
Jul 202355174.852.64$4,119
Jun 20230168.962.26$2
May 20230170.622.23$2
Apr 202366178.122.24$5,158
Mar 20230172.852.39$2
Feb 202329175.112.47$2,181
Jan 20230176.533.39$3
Dec 20220176.415.73$6
Nov 202248185.005.65$4,086
Oct 20220187.185.86$6
Sep 202255184.888.16$4,677
Aug 20220194.529.13$9
Jul 2022421101.587.54$4,274
Jun 202201115.097.98$8
May 202201109.378.43$8
Apr 2022281104.226.84$2,925
Mar 202201108.885.08$5
Feb 2022117191.054.86$10,658
Jan 20220181.844.54$5
Dec 20210171.323.90$4
Nov 20210177.435.24$5
Oct 2021110179.795.71$8,783
Sep 2021116169.865.35$8,109
Aug 20210166.024.22$4
Jul 202155170.783.98$3,897
Jun 20210169.493.38$3
May 20210163.483.02$3
Apr 202178160.362.76$4,711
Mar 20210161.302.72$3
Feb 20210157.805.55$6
Jan 20210150.412.81$3
Dec 2020123144.642.68$5,493
Nov 20200138.772.71$3
Oct 202095136.972.48$3,515
Sep 20200137.091.99$2
Aug 202076139.982.39$3,041
Jul 20200138.371.83$2
Jun 202076134.901.69$2,654
May 202061116.921.81$1,034
Apr 20200114.751.80$2
Mar 2020114130.341.86$3,461
Feb 20200149.881.98$2
Jan 202041157.252.09$2,349
Dec 20190159.012.30$2
Nov 2019112155.302.75$6,196
Oct 201941153.472.42$2,195
Sep 20190155.052.66$3
Aug 2019126153.112.30$6,694
Jul 20190156.272.46$2
Jun 201964152.782.49$3,380
May 20190158.482.74$3
Apr 201935162.632.75$2,195
Mar 2019131156.803.06$7,444
Feb 20190150.852.79$3
Jan 201947146.033.23$2,167
Dec 20180146.594.19$4
Nov 2018109152.934.24$5,774
Oct 20180161.443.40$3
Sep 201865159.543.11$3,873
Aug 20180159.403.07$3
Jul 2018112165.142.93$7,299
Jun 201840160.183.08$2,410
May 20180165.382.90$3
Apr 2018106163.842.90$6,770
Mar 20180161.222.79$3
Feb 201879161.782.77$4,883
Jan 20180162.874.01$4
Dec 2017112157.272.92$6,417
Nov 201755155.423.12$3,051
Oct 20170149.292.98$3
Sep 201770147.523.09$3,329
Aug 2017103145.373.00$4,676
Jul 20170143.873.09$3
Jun 201748142.493.09$2,043
May 20170145.373.26$3
Apr 201780147.933.21$3,838
Mar 201771146.772.98$3,324
Feb 201730150.452.95$1,516
Jan 2017156149.413.42$7,711
Dec 20160148.763.72$4
Nov 201647142.492.64$2,000
Oct 2016153146.193.09$7,070
Sep 20160141.553.10$3
Aug 2016170141.442.92$7,048
Jul 20160141.622.92$3
Jun 201677145.352.69$3,495
May 201697142.521.99$4,126
Apr 201661136.561.99$2,232
Mar 2016159133.011.79$5,250
Feb 20160126.472.06$2
Jan 2016156127.352.36$4,269
Dec 20150132.362.00$2
Nov 2015155138.792.17$6,015
Oct 2015160143.552.43$6,970
Sep 20150142.992.76$3
Aug 20150140.162.87$3
Jul 2015152148.152.95$7,322
Jun 20150156.152.88$3
May 2015152155.212.96$8,395
Apr 20150149.822.71$3
Mar 2015156142.892.93$6,694
Feb 20150144.662.98$3
Jan 2015160143.433.10$6,952
Dec 20140154.693.59$4
Nov 2014152170.464.25$10,714
Oct 20140178.303.90$4
Sep 2014164186.164.05$14,134
Aug 20140189.394.04$4
Jul 2014160196.564.18$15,454
Jun 2014157198.164.74$15,416
May 20140194.734.73$5
Apr 20140195.944.81$5
Mar 2014163195.895.06$15,635
Feb 20140197.406.19$6
Jan 2014152190.404.86$13,746
Dec 20130191.824.35$4
Nov 2013158188.853.74$14,042
Oct 20130197.423.78$4
Sep 20131561104.113.72$16,245
Aug 20131541104.253.52$16,058
Jul 201301102.523.72$4
Jun 2013157194.403.93$14,825
May 20130194.834.15$4
Apr 2013158193.964.28$14,850
Mar 20130193.623.91$4
Feb 2013158191.233.42$14,418
Jan 20130191.603.42$3
Dec 2012157186.773.42$13,626
Nov 20120186.953.62$4
Oct 2012160189.383.40$14,304
Sep 2012155194.672.92$14,677
Aug 20120192.662.91$3
Jul 2012158185.133.02$13,454
Jun 20120179.822.52$3
May 2012158191.612.49$14,477
Apr 201201101.652.00$2
Mar 20121561105.052.22$16,390
Feb 20121581101.102.57$15,976
Jan 20120198.092.73$3
Dec 2011155196.873.24$15,018
Nov 20110195.723.31$3
Oct 2011158184.983.65$13,430
Sep 2011164183.623.99$13,718
Aug 2011157183.404.15$13,098
Jul 2011157194.144.52$14,785
Jun 20110192.904.64$5
May 20110198.134.40$4
Apr 20111551105.964.33$16,428
Mar 20110196.364.06$4
Feb 2011155185.644.18$13,278
Jan 20110186.504.59$5
Dec 20100185.734.35$4
Nov 2010156180.843.80$12,615
Oct 20100178.103.51$4
Sep 2010161172.633.98$11,697
Aug 20100173.684.42$4
Jul 20100172.554.74$5
Jun 2010158170.364.91$11,122
May 20100171.124.24$4
Apr 2010156181.694.12$12,748
Mar 20100178.394.39$4
Feb 2010159173.585.44$11,705
Jan 20100174.365.96$6
Dec 20090171.445.48$5
Nov 2009155174.593.75$11,565
Oct 20090172.544.11$4
Sep 2009153165.543.06$10,031
Aug 2009154167.423.22$10,386
Jul 20090161.133.46$3
Jun 2009151166.163.90$9,994
May 20090154.743.93$4
Apr 2009156146.773.59$7,300
Mar 2009157142.144.06$6,620
Feb 20090132.814.63$5
Jan 2009159135.865.37$5,707
Dec 20080137.105.98$6
Nov 2008162155.496.86$8,996
Oct 20080175.246.92$7
Sep 20081401101.767.88$14,254
Aug 20081651114.228.48$18,855
Jul 200801131.0811.39$11
Jun 20081541131.3313.03$20,238
May 200801123.1711.57$12
Apr 20081651110.3110.45$18,212
Mar 20081641101.909.66$16,721
Feb 20080192.538.77$9
Jan 2008162190.388.21$14,650
Dec 20070188.337.30$7
Nov 2007166191.677.29$15,225
Oct 2007160182.856.92$13,263
Sep 20070175.846.24$6
Aug 2007158169.066.39$10,918
Jul 20070170.906.39$6
Jun 2007164162.007.55$10,176
May 2007163158.747.85$9,582
Apr 20070159.617.81$8
Mar 2007161156.927.30$9,171
Feb 20070155.108.22$8
Jan 2007163150.306.73$8,206
Dec 20060156.656.92$7
Nov 2006160154.207.62$8,680
Oct 2006163154.906.01$8,955
Sep 20060160.085.04$5
Aug 2006161168.717.34$11,070
Jul 2006179169.376.34$12,424
Jun 20060166.286.38$6
May 2006166166.016.42$10,964
Apr 20060164.397.36$7
Mar 2006171156.707.08$9,703
Feb 20060157.597.75$8
Jan 20060160.598.93$9
Dec 2005157154.9413.42$8,639
Nov 2005161154.6910.59$8,816
Oct 20050158.3413.80$14
Sep 2005166161.4512.08$10,213
Aug 2005170161.519.80$10,467
Jul 20050155.697.84$8
Jun 2005164152.337.38$8,590
May 20050145.226.65$7
Apr 2005154149.207.36$7,584
Mar 2005158150.377.15$7,966
Feb 20050145.226.31$6
Jan 2005157143.166.32$6,782
Dec 2004161139.866.75$6,424
Nov 20040145.286.33$6
Oct 2004158149.706.52$7,859
Sep 2004163143.245.28$7,053
Aug 20040142.375.55$6
Jul 2004163138.286.08$6,246
Jun 20040136.106.43$6
May 2004163137.486.49$6,116
Apr 2004158134.475.86$5,452
Mar 20040134.365.53$6
Feb 2004161132.455.51$5,230
Jan 2004156132.036.30$5,003
Dec 20030130.266.30$6
Nov 2003160128.804.60$4,613
Oct 2003161128.174.76$4,540
Sep 20030126.314.75$5
Aug 2003156129.765.13$4,648
Jul 2003161129.415.17$4,740
Jun 20030128.565.98$6
May 2003161126.595.97$4,287
Apr 2003162126.675.41$4,326
Mar 20030131.146.10$6
Feb 2003164133.487.93$5,499
Jan 2003169130.315.58$5,128
Dec 20020126.914.85$5
Nov 2002153124.664.14$3,777
Oct 2002157126.464.23$4,158
Sep 20020127.443.64$4
Aug 2002164125.963.16$4,261
Jul 2002166124.583.06$4,083
Jun 20020123.733.34$3
May 2002160124.663.58$3,949
Apr 2002162123.653.51$3,835
Mar 20020122.003.10$3
Feb 2002150118.222.38$2,735
Jan 2002169117.172.38$2,904
Dec 2001161116.932.36$2,728
Nov 20010118.072.41$2
Oct 2001111119.782.53$2,198
Sep 2001163124.262.25$3,957
Aug 200121124.873.05$525
Jul 2001158123.933.20$3,784
Jun 2001169124.563.82$4,154
May 2001166125.524.31$4,241
Apr 20010124.685.34$5
Mar 2001164124.545.38$4,030
Feb 2001175127.755.77$4,862
Jan 20010127.478.40$8
Dec 2000166126.889.12$4,471
Nov 2000164132.215.66$5,288
Oct 20000131.235.15$5
Sep 2000174131.875.19$5,551
Aug 2000160129.644.54$4,747
Jul 20000128.534.09$4
Jun 2000154129.304.40$4,517
May 2000167127.263.68$4,556
Apr 2000167124.513.12$4,096
Mar 20000128.422.86$3
Feb 2000170127.622.73$4,698
Jan 2000164125.272.48$4,147
Dec 1999164124.282.42$3,984
Nov 19990123.192.43$2
Oct 1999156120.982.80$3,276
Sep 1999167121.752.62$3,635
Aug 1999154119.262.88$2,969
Jul 19990117.892.37$2
Jun 1999167115.942.36$2,664
May 1999170115.792.32$2,687
Apr 1999166115.102.21$2,509
Mar 19990112.471.84$2
Feb 199917519.981.82$1,748
Jan 1999163110.381.90$1,694
Dec 199815719.201.77$1,446
Nov 19980110.892.19$2
Oct 1998166112.421.97$2,064
Sep 1998164112.592.08$2,067
Aug 1998163111.301.91$1,844
Jul 19980111.742.24$2
Jun 1998154111.242.24$1,733
May 1998170112.622.21$2,148
Apr 1998170113.042.51$2,219
Mar 1998165112.802.31$2,114
Feb 19980113.952.30$2
Jan 1998170114.702.15$2,501
Dec 1997162116.322.41$2,646
Nov 1997155118.193.09$2,823
Oct 19970119.253.15$3
Sep 1997138117.742.95$2,451
Aug 1997166117.862.55$2,967
Jul 1997163117.582.25$2,868
Jun 199797117.242.26$1,675
May 1997103118.972.31$1,956
Apr 199787117.882.08$1,558
Mar 1997224118.951.94$4,247
Feb 1997125120.492.21$2,563
Jan 199775123.483.54$1,765
Dec 199698123.32$2,285
Nov 1996179121.97$3,933
Oct 1996112123.31$2,611
Sep 1996104122.22$2,311
Aug 1996122120.26$2,472
Jul 1996208119.55$4,066
Jun 1996122118.73$2,285
May 199697119.43$1,885
Apr 1996121121.51$2,603
Mar 1996202119.38$3,915
Feb 199691116.98$1,545
Jan 1996122117.07$2,083
Dec 1995200117.19$3,438
Nov 199586116.00$1,376
Oct 1995120115.43$1,852
Sep 1995220116.18$3,560
Aug 1995109115.92$1,735
Jul 199584115.24$1,280
Jun 1995203116.41$3,331
May 1995116117.56$2,037
Apr 1995122117.73$2,163
Mar 1995234116.44$3,847
Feb 1995121116.58$2,006
Jan 1995164115.92$2,611
Dec 1994188115.03$2,826
Nov 1994116115.90$1,844
Oct 1994129115.58$2,010
Sep 1994192115.29$2,936
Aug 1994131116.13$2,113
Jul 1994120117.56$2,107
Jun 1994186117.09$3,179
May 1994116115.88$1,842
Apr 1994239114.14$3,379
Mar 199476112.46$947
Feb 1994123112.50$1,538
Jan 1994196112.66$2,481
Dec 1993124112.33$1,529
Nov 1993191114.49$2,768
Oct 1993119115.85$1,886
Sep 1993197115.03$2,961
Aug 1993119115.66$1,864
Jul 1993201115.46$3,107
Jun 1993117116.79$1,964
May 1993195117.68$3,448
Apr 1993123118.05$2,220
Mar 1993201118.14$3,646
Feb 1993124117.90$2,220
Jan 1993192116.93$3,251

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Oil                    0 bbl  × $106.41 =         $0
Casinghead gas         1 Mcf  × $  3.05 =         $3

────────────────────────────────────────────────────
Month total                                       $3

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 8A/O/61911 is the state's own key, not one this site invented.