BLALOCK

Operated by LARIO OIL & GAS COMPANY (P-5 486710) in the TONTO, N. (STRAWN) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 62032District 8AField 90696800OilCasinghead gasSaveExport
Value, all time
$792 k
Jan 1993 – Jun 2015
Value, last 12 filed months
$134
at the published price for each month
Months reported
270
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 5 leases and 9 wells, and the rule below applies to all of them.

Discovered
1975-09-06
as the register files it
Field class
Oil
the register's own label
Between wells
1,320 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 80 acres.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition20,978 bbl$715,053
Casinghead gasProduction23,913 Mcf$77,410
Total$792,463

7,857 Mcf of this lease's gas, across 47 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.8438, -100.8659. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.84378, -100.86588 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
7,100 ft
1 wells filed one
Completion to plug
37.3 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,100 ft.

Completions filed
Oct 1977
1 of 1 wells
Plug dates filed
Feb 2015
1 of 1 wells

Last completion to plug: a median of 37.3 years across the 1 well that filed both dates, with the middle half between 37.3 years and 37.3 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-4153118317,100 ftOct 1977Feb 2015Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (270)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

270 months

Jun 20150056.152.88$0
May 20150055.212.96$0
Apr 20150049.822.71$0
Mar 20150042.892.93$0
Feb 20153044.662.98$134
Jan 20150043.433.10$0
Dec 20140054.693.59$0
Nov 20140070.464.25$0
Oct 20140078.303.90$0
Sep 20140086.164.05$0
Aug 20140089.394.04$0
Jul 20140096.564.18$0
Jun 20140098.164.74$0
May 20140094.734.73$0
Apr 2014187095.944.81$17,941
Mar 20140095.895.06$0
Feb 20140097.406.19$0
Jan 20140090.404.86$0
Dec 20130091.824.35$0
Nov 20130088.853.74$0
Oct 2013186097.423.78$18,120
Sep 201300104.113.72$0
Aug 201300104.253.52$0
Jul 20130124102.523.72$461
Jun 2013012494.403.93$488
May 201318512494.834.15$18,058
Apr 2013012093.964.28$514
Mar 20130093.623.91$0
Feb 20130091.233.42$0
Jan 2013178091.603.42$16,305
Dec 20120086.773.42$0
Nov 20120086.953.62$0
Oct 20120089.383.40$0
Sep 20120094.672.92$0
Aug 2012154092.662.91$14,270
Jul 20120085.133.02$0
Jun 20120079.822.52$0
May 20120091.612.49$0
Apr 201200101.652.00$0
Mar 20121860105.052.22$19,539
Feb 201200101.102.57$0
Jan 20120098.092.73$0
Dec 20110096.873.24$0
Nov 20110095.723.31$0
Oct 2011180084.983.65$15,296
Sep 20110083.623.99$0
Aug 20110083.404.15$0
Jul 20110094.144.52$0
Jun 2011185092.904.64$17,187
May 20110098.134.40$0
Apr 201100105.964.33$0
Mar 20110096.364.06$0
Feb 20110085.644.18$0
Jan 2011176086.504.59$15,224
Dec 20100085.734.35$0
Nov 20100080.843.80$0
Oct 20100078.103.51$0
Sep 2010185072.633.98$13,437
Aug 20100073.684.42$0
Jul 20100072.554.74$0
Jun 20100070.364.91$0
May 2010190071.124.24$13,513
Apr 20100081.694.12$0
Mar 20100078.394.39$0
Feb 2010189073.585.44$13,907
Jan 20100074.365.96$0
Dec 20090071.445.48$0
Nov 20090074.593.75$0
Oct 2009173072.544.11$12,549
Sep 20090065.543.06$0
Aug 20090067.423.22$0
Jul 20090061.133.46$0
Jun 2009184066.163.90$12,173
May 20090054.743.93$0
Apr 20090046.773.59$0
Mar 20090042.144.06$0
Feb 2009189032.814.63$6,201
Jan 20090035.865.37$0
Dec 20080037.105.98$0
Nov 20080055.496.86$0
Oct 2008188075.246.92$14,145
Sep 200800101.767.88$0
Aug 200800114.228.48$0
Jul 200800131.0811.39$0
Jun 20081850131.3313.03$24,296
May 200800123.1711.57$0
Apr 200800110.3110.45$0
Mar 20081880101.909.66$19,157
Feb 20080092.538.77$0
Jan 20080090.388.21$0
Dec 20070088.337.30$0
Nov 2007193091.677.29$17,692
Oct 20070082.856.92$0
Sep 2007012075.846.24$749
Aug 200718412469.066.39$13,499
Jul 2007012470.906.39$792
Jun 2007012062.007.55$906
May 2007012458.747.85$973
Apr 200718912059.617.81$12,203
Mar 2007012456.927.30$905
Feb 2007011255.108.22$920
Jan 200719512450.306.73$10,643
Dec 2006012456.656.92$858
Nov 2006012054.207.62$914
Oct 2006012454.906.01$746
Sep 200617212060.085.04$10,938
Aug 2006012468.717.34$910
Jul 2006012469.376.34$787
Jun 200616812066.286.38$11,901
May 2006012466.016.42$797
Apr 2006012064.397.36$883
Mar 200618212456.707.08$11,198
Feb 2006011257.597.75$868
Jan 2006012460.598.93$1,108
Dec 200513612454.9413.42$9,135
Nov 2005012054.6910.59$1,271
Oct 200515812458.3413.80$10,928
Sep 2005012061.4512.08$1,449
Aug 200516912461.519.80$11,610
Jul 2005012455.697.84$973
Jun 2005012052.337.38$886
May 200517212445.226.65$8,603
Apr 2005012049.207.36$883
Mar 2005012450.377.15$887
Feb 200517211245.226.31$8,485
Jan 2005012443.166.32$784
Dec 200417112439.866.75$7,653
Nov 2004012045.286.33$760
Oct 2004012449.706.52$808
Sep 200417012043.245.28$7,985
Aug 2004012442.375.55$688
Jul 2004012038.286.08$730
Jun 200417412036.106.43$7,053
May 2004012437.486.49$805
Apr 200416912034.475.86$6,528
Mar 2004012434.365.53$686
Feb 2004011232.455.51$617
Jan 2004012432.036.30$781
Dec 200316912430.266.30$5,895
Nov 2003012028.804.60$551
Oct 2003012428.174.76$590
Sep 200316610026.314.75$4,842
Aug 2003012429.765.13$636
Jul 200309229.415.17$476
Jun 2003012028.565.98$718
May 200316712426.595.97$5,181
Apr 2003012026.675.41$649
Mar 2003012431.146.10$756
Feb 200317211233.487.93$6,646
Jan 2003011630.315.58$648
Dec 200217312426.914.85$5,257
Nov 2002012024.664.14$496
Oct 2002012426.464.23$524
Sep 200217212027.443.64$5,156
Aug 2002012425.963.16$392
Jul 2002012424.583.06$380
Jun 200217212023.733.34$4,482
May 200208824.663.58$315
Apr 2002011223.653.51$393
Mar 200217712422.003.10$4,279
Feb 2002011218.222.38$266
Jan 200217312417.172.38$3,265
Dec 2001012416.932.36$293
Nov 200116512018.072.41$3,270
Oct 2001010419.782.53$263
Sep 200117212024.262.25$4,443
Aug 200115012424.873.05$4,109
Jul 2001012423.933.20$396
Jun 200114612024.563.82$4,045
May 2001012425.524.31$534
Apr 200115412024.685.34$4,441
Mar 200113512424.545.38$3,980
Feb 2001011227.755.77$646
Jan 200114412427.478.40$4,997
Dec 200015512426.889.12$5,298
Nov 2000012032.215.66$679
Oct 200015512431.235.15$5,479
Sep 2000012031.875.19$622
Aug 200012812429.644.54$4,357
Jul 200015212428.534.09$4,844
Jun 200016412029.304.40$5,333
May 2000012427.263.68$456
Apr 200012912024.513.12$3,536
Mar 200014412428.422.86$4,447
Feb 2000011627.622.73$316
Jan 200015112425.272.48$4,123
Dec 199914512424.282.42$3,821
Nov 1999012023.192.43$292
Oct 199914312420.982.80$3,348
Sep 199915312021.752.62$3,642
Aug 199915012419.262.88$3,246
Jul 1999012417.892.37$294
Jun 199915312015.942.36$2,722
May 199913612415.792.32$2,435
Apr 1999012015.102.21$265
Mar 199916412412.471.84$2,273
Feb 19991641129.981.82$1,840
Jan 1999012410.381.90$236
Dec 19981821249.201.77$1,894
Nov 199814812010.892.19$1,874
Oct 199815112412.421.97$2,120
Sep 1998012012.592.08$250
Aug 199815512411.301.91$1,988
Jul 199814612411.742.24$1,991
Jun 199814412011.242.24$1,887
May 1998012412.622.21$274
Apr 199816812013.042.51$2,491
Mar 199814112412.802.31$2,091
Feb 199815411213.952.30$2,406
Jan 1998012414.702.15$267
Dec 199712912416.322.41$2,404
Nov 199716412018.193.09$3,354
Oct 199712912419.253.15$2,874
Sep 199715712017.742.95$3,140
Aug 199716212417.862.55$3,210
Jul 1997012417.582.25$279
Jun 199714912017.242.26$2,840
May 199714212418.972.31$2,980
Apr 199716612017.882.08$3,218
Mar 199715912418.951.94$3,254
Feb 199715611220.492.21$3,444
Jan 199714212023.483.54$3,759
Dec 1996012423.32$0
Nov 199616312021.97$3,581
Oct 199614712423.31$3,427
Sep 199616212022.22$3,600
Aug 199616612420.26$3,363
Jul 199615912419.55$3,108
Jun 1996013018.73$0
May 199615915619.43$3,089
Apr 199614214221.51$3,054
Mar 199616115719.38$3,120
Feb 199614417216.98$2,445
Jan 19960017.07$0
Dec 199516010917.19$2,750
Nov 199514215716.00$2,272
Oct 199515213615.43$2,345
Sep 19951569516.18$2,524
Aug 199516111015.92$2,563
Jul 199515712015.24$2,393
Jun 199515011716.41$2,462
May 199515012117.56$2,634
Apr 199517118217.73$3,032
Mar 199516419716.44$2,696
Feb 1995016116.58$0
Jan 199514920315.92$2,372
Dec 199416622715.03$2,495
Nov 199415411415.90$2,449
Oct 199415312015.58$2,384
Sep 199430211715.29$4,618
Aug 199416211116.13$2,613
Jul 1994011517.56$0
Jun 199416117317.09$2,751
May 199414719915.88$2,334
Apr 199415818914.14$2,234
Mar 199416018112.46$1,994
Feb 199415816112.50$1,975
Jan 199416225912.66$2,051
Dec 199316324812.33$2,010
Nov 199315924314.49$2,304
Oct 199315126615.85$2,393
Sep 199316423815.03$2,465
Aug 199315425315.66$2,412
Jul 199315021915.46$2,319
Jun 199331221116.79$5,238
May 1993023417.68$0
Apr 199315721718.05$2,834
Mar 199315523018.14$2,812
Feb 199315620717.90$2,792
Jan 199315712416.93$2,658

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Feb 2015 — as filed, then multipliedworked
Oil                    3 bbl  × $ 44.66 =       $134
Casinghead gas         0 Mcf  × $  2.98 =         $0

────────────────────────────────────────────────────
Month total                                     $134

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 8A/O/62032 is the state's own key, not one this site invented.