JAMES, T. C. JR.

Operated by AOCO OPERATING COMPANY, L.L.C. (P-5 26802) in the HOOPLE (CLEAR FORK) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 62554District 8AField 42499500OilCasinghead gasSave
Value, all time
$743 k
Jan 1993 – Nov 1999
Value, last 12 filed months
$52 k
at the published price for each month
Months reported
83
no gaps in the span
Streams
2
oil, casinghead gas

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition45,278 bbl$735,680
Casinghead gasProduction6,077 Mcf$7,786
Total$743,466

2,749 Mcf of this lease's gas, across 47 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (18)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 33.5285, -101.5384. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.8 miles.

33.52757, -101.53950 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
44.4%
8 of 18 wells
With a plug date
44.4%
8 of 18 wells
Median depth
4,558 ft
18 wells filed one
Completion to plug
38.1 years
median over 8 wells

What the state filed about each well

On the RRC proration schedule
844.4%
A plug date is filed
844.4%
BothOn the schedule and plugged. Neither fact cancels the other.
844.4%
NeitherNo plug date, and not on the schedule.
1055.6%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

0k
2k
4k
6k
8k
10k
12k
15k
20k+

Total depth in feet, 18 of 18 wells. Median 4,558 ft, with the middle half between 4,500 and 4,608 ft; the shallowest is 4,470 ft and the deepest 4,620 ft. The median is published rather than the mean, because a single mis-keyed depth moves a mean and cannot move a median.

When they were last completed

70s
80s
90s
00s
10s
20s

Last completion by decade, 18 of 18 wells, Aug 1979 – Feb 2026. This is the LAST completion filed on each wellbore, not the first — a well recompleted in 2019 counts once, in the 2010s.

Completions filed
Aug 1979 – Feb 2026
18 of 18 wells
Plug dates filed
Jul 2006 – Nov 2022
8 of 18 wells; 10 filed none

Last completion to plug: a median of 38.1 years across the 8 wells that filed both dates, with the middle half between 33.0 years and 41.6 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

18 wells

42-107310197604,620 ftFeb 2026
42-107310297704,620 ftApr 2025
42-107310307594,485 ftSep 2021
42-1073046474,520 ftNov 2020
42-107310187714,620 ftFeb 2011
42-107310317474,620 ftFeb 2009
42-107310177484,610 ftNov 1998
42-10730568124,515 ftMar 1981Nov 2022Yes
42-10730567114,500 ftMar 1981
42-10730566104,500 ftMar 1981Oct 2022Yes
42-1073056594,470 ftDec 1980
42-1073046584,500 ftJun 1980Mar 2015Yes
42-1073046164,600 ftApr 1980Feb 2017Yes
42-1073044854,600 ftApr 1980Jul 2019Yes
42-1073044944,600 ftMar 1980Nov 2007Yes
42-1073039934,560 ftNov 1979Nov 2022Yes
42-1073039724,555 ftOct 1979
42-1073036614,500 ftAug 1979Jul 2006Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (83)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

83 months

Nov 19990023.192.43$0
Oct 19990020.982.80$0
Sep 19990021.752.62$0
Aug 19990019.262.88$0
Jul 19990017.892.37$0
Jun 19990015.942.36$0
May 19991,11312815.792.32$17,871
Apr 1999661015.102.21$9,981
Mar 1999682012.471.84$8,505
Feb 199951409.981.82$5,130
Jan 199934012810.381.90$3,772
Dec 19986811289.201.77$6,492
Nov 199849412810.892.19$5,659
Oct 199864412812.421.97$8,251
Sep 199859412812.592.08$7,745
Aug 199847512811.301.91$5,612
Jul 199848912811.742.24$6,027
Jun 199862512811.242.24$7,311
May 199875312812.622.21$9,785
Apr 199860612813.042.51$8,223
Mar 199846412812.802.31$6,235
Feb 199877612813.952.30$11,119
Jan 199847012814.702.15$7,185
Dec 199747212816.322.41$8,012
Nov 199778212818.193.09$14,620
Oct 199762412819.253.15$12,415
Sep 199763712817.742.95$11,679
Aug 199760912817.862.55$11,204
Jul 199748312817.582.25$8,779
Jun 199779712817.242.26$14,029
May 199762412818.972.31$12,133
Apr 199748812817.882.08$8,992
Mar 199751512818.951.94$10,007
Feb 199753412820.492.21$11,224
Jan 199761312823.483.54$14,846
Dec 199653112823.32$12,383
Nov 199652812821.97$11,600
Oct 1996540723.31$12,587
Sep 1996734722.22$16,309
Aug 1996524720.26$10,616
Jul 1996359719.55$7,018
Jun 1996711718.73$13,317
May 1996523719.43$10,162
Apr 1996530721.51$11,400
Mar 199669912819.38$13,547
Feb 199652612816.98$8,931
Jan 199651112817.07$8,723
Dec 199569712817.19$11,981
Nov 199552312816.00$8,368
Oct 1995535715.43$8,255
Sep 1995715716.18$11,569
Aug 1995525715.92$8,358
Jul 1995518715.24$7,894
Jun 1995527716.41$8,648
May 1995678717.56$11,906
Apr 1995516717.73$9,149
Mar 199550712816.44$8,335
Feb 199549012816.58$8,124
Jan 199565412815.92$10,412
Dec 199449512815.03$7,440
Nov 199449912815.90$7,934
Oct 1994654715.58$10,189
Sep 1994498015.29$7,614
Aug 1994673716.13$10,855
Jul 1994496717.56$8,710
Jun 1994654717.09$11,177
May 1994663715.88$10,528
Apr 1994501714.14$7,084
Mar 199449712812.46$6,193
Feb 199450712812.50$6,338
Jan 199483512812.66$10,571
Dec 199350512812.33$6,227
Nov 199349612814.49$7,187
Oct 1993664715.85$10,524
Sep 1993498715.03$7,485
Aug 1993658715.66$10,304
Jul 1993664715.46$10,265
Jun 1993495716.79$8,311
May 1993669717.68$11,828
Apr 1993668718.05$12,057
Mar 199349512818.14$8,979
Feb 199366212817.90$11,850
Jan 199367212816.93$11,377

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 1999 — as filed, then multipliedworked
Oil                1,113 bbl  × $ 15.79 =    $17,574
Casinghead gas       128 Mcf  × $  2.32 =       $297

────────────────────────────────────────────────────
Month total                                  $17,871

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 8A/O/62554 is the state's own key, not one this site invented.