REICHLE "B"

Operated by BROWN, H.L. OPERATING, L.L.C. (P-5 100263) in the EDMISSON, N.W. (CLEARFORK) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 64407District 8AField 27668500OilCasinghead gasSave
Value, all time
$118 k
Jan 1993 – Apr 2004
Value, last 12 filed months
$0
at the published price for each month
Months reported
136
no gaps in the span
Streams
2
oil, casinghead gas

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition6,878 bbl$117,619
Casinghead gasProduction21 Mcf$0
Total$117,619

21 Mcf of this lease's gas, across 21 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 33.6558, -101.8873. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

33.65576, -101.88726 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
5,500 ft
1 wells filed one
Completion to plug
20.8 years
median over 1 wells

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 5,500 ft.

Completions filed
Apr 1983
1 of 1 wells
Plug dates filed
Jan 2004
1 of 1 wells

Last completion to plug: a median of 20.8 years across the 1 well that filed both dates, with the middle half between 20.8 years and 20.8 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-3033089335,500 ftApr 1983Jan 2004Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (136)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

136 months

Apr 20040034.475.86$0
Mar 20040034.365.53$0
Feb 20040032.455.51$0
Jan 20040032.036.30$0
Dec 20030030.266.30$0
Nov 20030028.804.60$0
Oct 20030028.174.76$0
Sep 20030026.314.75$0
Aug 20030029.765.13$0
Jul 20030029.415.17$0
Jun 20030028.565.98$0
May 20030026.595.97$0
Apr 20030026.675.41$0
Mar 20030031.146.10$0
Feb 20030033.487.93$0
Jan 20030030.315.58$0
Dec 20020026.914.85$0
Nov 20020024.664.14$0
Oct 20020026.464.23$0
Sep 20020027.443.64$0
Aug 20020025.963.16$0
Jul 20020024.583.06$0
Jun 20020023.733.34$0
May 20020024.663.58$0
Apr 20020023.653.51$0
Mar 20020022.003.10$0
Feb 20020018.222.38$0
Jan 20020017.172.38$0
Dec 20010016.932.36$0
Nov 20010018.072.41$0
Oct 20010019.782.53$0
Sep 20010024.262.25$0
Aug 20010024.873.05$0
Jul 20010023.933.20$0
Jun 20010024.563.82$0
May 200155025.524.31$1,404
Apr 20010024.685.34$0
Mar 200158024.545.38$1,423
Feb 200156027.755.77$1,554
Jan 200156027.478.40$1,538
Dec 20000026.889.12$0
Nov 200056032.215.66$1,804
Oct 2000110031.235.15$3,435
Sep 20000031.875.19$0
Aug 20000029.644.54$0
Jul 20000028.534.09$0
Jun 20000029.304.40$0
May 20000027.263.68$0
Apr 20000024.513.12$0
Mar 20000028.422.86$0
Feb 20000027.622.73$0
Jan 20000025.272.48$0
Dec 19990024.282.42$0
Nov 19990023.192.43$0
Oct 19990020.982.80$0
Sep 19990021.752.62$0
Aug 19990019.262.88$0
Jul 19990017.892.37$0
Jun 19990015.942.36$0
May 199972015.792.32$1,137
Apr 199976015.102.21$1,148
Mar 19990012.471.84$0
Feb 19997409.981.82$739
Jan 199976010.381.90$789
Dec 1998009.201.77$0
Nov 199875010.892.19$817
Oct 199875012.421.97$932
Sep 199863012.592.08$793
Aug 19980011.301.91$0
Jul 19980011.742.24$0
Jun 199874011.242.24$832
May 199875012.622.21$947
Apr 199876013.042.51$991
Mar 19980012.802.31$0
Feb 199871013.952.30$990
Jan 199875014.702.15$1,103
Dec 199776016.322.41$1,240
Nov 19970018.193.09$0
Oct 199776019.253.15$1,463
Sep 199775017.742.95$1,331
Aug 199773017.862.55$1,304
Jul 19970017.582.25$0
Jun 199775017.242.26$1,293
May 199775018.972.31$1,423
Apr 199775017.882.08$1,341
Mar 199774018.951.94$1,402
Feb 19970020.492.21$0
Jan 199771023.483.54$1,667
Dec 199676023.32$1,772
Nov 199674021.97$1,626
Oct 199673023.31$1,702
Sep 199676022.22$1,689
Aug 199670020.26$1,418
Jul 199670019.55$1,369
Jun 1996138018.73$2,585
May 199669019.43$1,341
Apr 199670021.51$1,506
Mar 1996136019.38$2,636
Feb 199668016.98$1,155
Jan 199674017.07$1,263
Dec 199571017.19$1,220
Nov 1995135016.00$2,160
Oct 199573015.43$1,126
Sep 199572016.18$1,165
Aug 199570015.92$1,114
Jul 1995139015.24$2,118
Jun 199568016.41$1,116
May 199574017.56$1,299
Apr 1995144017.73$2,553
Mar 199567016.44$1,101
Feb 199571016.58$1,177
Jan 1995133015.92$2,117
Dec 199471015.03$1,067
Nov 1994144015.90$2,290
Oct 199471015.58$1,106
Sep 1994135115.29$2,064
Aug 199469116.13$1,113
Jul 1994141117.56$2,476
Jun 199470117.09$1,196
May 1994142115.88$2,255
Apr 199469114.14$976
Mar 1994143112.46$1,782
Feb 199471112.50$888
Jan 199473112.66$924
Dec 1993143112.33$1,763
Nov 1993142114.49$2,058
Oct 199370115.85$1,110
Sep 1993144115.03$2,164
Aug 1993141115.66$2,208
Jul 1993142115.46$2,195
Jun 1993141116.79$2,367
May 1993140117.68$2,475
Apr 1993139118.05$2,509
Mar 1993140118.14$2,540
Feb 1993140117.90$2,506
Jan 1993143116.93$2,421

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2001 — as filed, then multipliedworked
Oil                   55 bbl  × $ 25.52 =     $1,404
Casinghead gas         0 Mcf  × $  4.31 =         $0

────────────────────────────────────────────────────
Month total                                   $1,404

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 8A/O/64407 is the state's own key, not one this site invented.