SPRINGER

Operated by TEXAS ENERGY SOURCES, INC. (P-5 845825) in the G K (TANNEHILL) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 64452District 8AField 33456350OilCasinghead gasSaveExport
Value, all time
$220 k
Jan 1993 – Mar 2008
Value, last 12 filed months
$0
at the published price for each month
Months reported
183
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 4 leases and 8 wells, and the rule below applies to all of them.

Discovered
1982-01-05
as the register files it
Field class
Oil
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition12,109 bbl$218,577
Casinghead gasProduction903 Mcf$1,198
Total$219,775

467 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 33.4307, -100.3655. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

33.43070, -100.36548 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
3,657 ft
1 wells filed one
Completion to plug
19.2 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 3,657 ft.

Completions filed
Aug 1983
1 of 1 wells
Plug dates filed
Oct 2002
1 of 1 wells

Last completion to plug: a median of 19.2 years across the 1 well that filed both dates, with the middle half between 19.2 years and 19.2 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-2693114313,657 ftAug 1983Oct 2002Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (183)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

183 months

Mar 200800101.909.66$0
Feb 20080092.538.77$0
Jan 20080090.388.21$0
Dec 20070088.337.30$0
Nov 20070091.677.29$0
Oct 20070082.856.92$0
Sep 20070075.846.24$0
Aug 20070069.066.39$0
Jul 20070070.906.39$0
Jun 20070062.007.55$0
May 20070058.747.85$0
Apr 20070059.617.81$0
Mar 20070056.927.30$0
Feb 20070055.108.22$0
Jan 20070050.306.73$0
Dec 20060056.656.92$0
Nov 20060054.207.62$0
Oct 20060054.906.01$0
Sep 20060060.085.04$0
Aug 20060068.717.34$0
Jul 20060069.376.34$0
Jun 20060066.286.38$0
May 20060066.016.42$0
Apr 20060064.397.36$0
Mar 20060056.707.08$0
Feb 20060057.597.75$0
Jan 20060060.598.93$0
Dec 20050054.9413.42$0
Nov 20050054.6910.59$0
Oct 20050058.3413.80$0
Sep 20050061.4512.08$0
Aug 20050061.519.80$0
Jul 20050055.697.84$0
Jun 20050052.337.38$0
May 20050045.226.65$0
Apr 20050049.207.36$0
Mar 20050050.377.15$0
Feb 20050045.226.31$0
Jan 20050043.166.32$0
Dec 20040039.866.75$0
Nov 20040045.286.33$0
Oct 20040049.706.52$0
Sep 20040043.245.28$0
Aug 20040042.375.55$0
Jul 20040038.286.08$0
Jun 20040036.106.43$0
May 20040037.486.49$0
Apr 20040034.475.86$0
Mar 20040034.365.53$0
Feb 20040032.455.51$0
Jan 20040032.036.30$0
Dec 20030030.266.30$0
Nov 20030028.804.60$0
Oct 20030028.174.76$0
Sep 20030026.314.75$0
Aug 20030029.765.13$0
Jul 20030029.415.17$0
Jun 20030028.565.98$0
May 20030026.595.97$0
Apr 20030026.675.41$0
Mar 20030031.146.10$0
Feb 20030033.487.93$0
Jan 20030030.315.58$0
Dec 20020026.914.85$0
Nov 20020024.664.14$0
Oct 20020026.464.23$0
Sep 20020027.443.64$0
Aug 20020025.963.16$0
Jul 20020024.583.06$0
Jun 20020023.733.34$0
May 20020024.663.58$0
Apr 200244023.653.51$1,041
Mar 20020222.003.10$6
Feb 20020218.222.38$5
Jan 20020217.172.38$5
Dec 20010216.932.36$5
Nov 20010218.072.41$5
Oct 2001173219.782.53$3,427
Sep 20010224.262.25$5
Aug 20010224.873.05$6
Jul 20010223.933.20$6
Jun 2001165224.563.82$4,060
May 20010225.524.31$9
Apr 20010324.685.34$16
Mar 2001178224.545.38$4,379
Feb 20010327.755.77$17
Jan 2001181627.478.40$5,022
Dec 20000526.889.12$46
Nov 2000176632.215.66$5,703
Oct 20000431.235.15$21
Sep 20000531.875.19$26
Aug 2000166529.644.54$4,943
Jul 20000628.534.09$25
Jun 2000176529.304.40$5,179
May 20000427.263.68$15
Apr 20000624.513.12$19
Mar 2000159328.422.86$4,527
Feb 20000627.622.73$16
Jan 2000168625.272.48$4,260
Dec 19990624.282.42$15
Nov 1999184523.192.43$4,279
Oct 19990720.982.80$20
Sep 1999172621.752.62$3,757
Aug 19990719.262.88$20
Jul 1999174717.892.37$3,129
Jun 19990615.942.36$14
May 1999150715.792.32$2,385
Apr 1999171715.102.21$2,598
Mar 19990712.471.84$13
Feb 199917079.981.82$1,709
Jan 19990710.381.90$13
Dec 199817279.201.77$1,595
Nov 19980710.892.19$15
Oct 1998158712.421.97$1,976
Sep 1998169712.592.08$2,142
Aug 199807011.301.91$134
Jul 1998173811.742.24$2,049
Jun 19980711.242.24$16
May 1998168812.622.21$2,138
Apr 1998162713.042.51$2,130
Mar 1998164012.802.31$2,099
Feb 199801913.952.30$44
Jan 1998156814.702.15$2,310
Dec 1997173816.322.41$2,843
Nov 1997173818.193.09$3,172
Oct 19970819.253.15$25
Sep 1997172917.742.95$3,078
Aug 19970817.862.55$20
Jul 1997175917.582.25$3,097
Jun 1997167817.242.26$2,897
May 1997168918.972.31$3,208
Apr 19970917.882.08$19
Mar 19971611018.951.94$3,070
Feb 1997168920.492.21$3,462
Jan 19971751023.483.54$4,144
Dec 1996173923.32$4,034
Nov 199601021.97$0
Oct 19961741023.31$4,056
Sep 19961731022.22$3,844
Aug 19961581120.26$3,201
Jul 19961821119.55$3,558
Jun 1996159918.73$2,978
May 19961771219.43$3,439
Apr 19961721021.51$3,700
Mar 199601119.38$0
Feb 19961761116.98$2,988
Jan 19961741217.07$2,970
Dec 19951721217.19$2,957
Nov 19951761116.00$2,816
Oct 19951721215.43$2,654
Sep 19951701216.18$2,751
Aug 19951691015.92$2,690
Jul 19951731215.24$2,637
Jun 19951731116.41$2,839
May 19951791217.56$3,143
Apr 19951861017.73$3,298
Mar 199501216.44$0
Feb 19951731116.58$2,868
Jan 19951871215.92$2,977
Dec 19941791215.03$2,690
Nov 19941831215.90$2,910
Oct 19941731315.58$2,695
Sep 1994170115.29$2,599
Aug 19943502716.13$5,646
Jul 19940217.56$0
Jun 19941611317.09$2,751
May 19941751115.88$2,779
Apr 19940614.14$0
Mar 1994179712.46$2,230
Feb 19940712.50$0
Jan 1994164612.66$2,076
Dec 1993171712.33$2,108
Nov 19930714.49$0
Oct 1993181715.85$2,869
Sep 19930715.03$0
Aug 1993174715.66$2,725
Jul 19930715.46$0
Jun 1993183716.79$3,073
May 1993181717.68$3,200
Apr 19930718.05$0
Mar 1993192918.14$3,483
Feb 19930717.90$0
Jan 1993184816.93$3,115

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2002 — as filed, then multipliedworked
Oil                   44 bbl  × $ 23.65 =     $1,041
Casinghead gas         0 Mcf  × $  3.51 =         $0

────────────────────────────────────────────────────
Month total                                   $1,041

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 8A/O/64452 is the state's own key, not one this site invented.