ROBINSON

Operated by BBS OIL FIELD SERVICES INC (P-5 100221) in the POST (GLORIETA) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 64951District 8AField 72552500Hydrogen sulphide fieldOilCasinghead gasSaveExport
Value, all time
$1.5 M
Jan 1993 – May 2026
Value, last 12 filed months
$14 k
at the published price for each month
Months reported
401
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 169 leases and 697 wells, and the rule below applies to all of them.

Discovered
1950-07-07
as the register files it
Field class
Oil
the register's own label
Between wells
660 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres.

The register flags this field for hydrogen sulphide. That is a poisonous gas that occurs naturally in some formations. The flag is a property of the field as the Commission records it. It is not a measurement taken at this lease, and it is not a statement that gas is escaping anywhere.

The Commission's schedule remark for this field reads: AND POST FLDS. EFF. 8-01-59, OPTIONAL 20 AC. UNITS

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition36,138 bbl$1,502,632
Casinghead gasProduction333 Mcf$1,124
Total$1,503,756

45 Mcf of this lease's gas, across 45 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (4)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 33.0970, -101.1249. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.5 miles.

33.09660, -101.12438 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 4 wells
With a plug date
0.0%
0 of 4 wells
Median depth
2,713 ft
4 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
4100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

Between 2,620 and 2,900 ft, median 2,713 ft, over the 4 wells that filed a depth.

Completions filed
Jul 1984 – May 1985
4 of 4 wells

4 wells

42-1693254442,620 ftMay 1985
42-1693239232,725 ftFeb 1985
42-1693239122,700 ftDec 1984
42-1693239012,900 ftJul 1984

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (401)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

401 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 2026158089.753.15$14,181
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 2025109067.704.27$7,379
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 202432068.993.12$2,208
Nov 2024150069.052.20$10,358
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 2024156075.632.06$11,798
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 2024152078.812.20$11,979
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 202494073.023.30$6,864
Dec 20230071.262.61$0
Nov 2023204177.892.81$15,892
Oct 20230185.443.09$3
Sep 2023136189.042.74$12,112
Aug 20230180.522.67$3
Jul 20230174.852.64$3
Jun 2023153168.962.26$10,553
May 20230170.622.23$2
Apr 20230178.122.24$2
Mar 20230172.852.39$2
Feb 20230175.112.47$2
Jan 2023150176.533.39$11,483
Dec 20220176.415.73$6
Nov 20220185.005.65$6
Oct 20220187.185.86$6
Sep 2022349184.888.16$29,631
Aug 20220194.529.13$9
Jul 202201101.587.54$8
Jun 202201115.097.98$8
May 202201109.378.43$8
Apr 202201104.226.84$7
Mar 202201108.885.08$5
Feb 20220191.054.86$5
Jan 20220181.844.54$5
Dec 20210171.323.90$4
Nov 20210177.435.24$5
Oct 20210179.795.71$6
Sep 20210169.865.35$5
Aug 20210166.024.22$4
Jul 20210170.783.98$4
Jun 20210169.493.38$3
May 20210163.483.02$3
Apr 20210160.362.76$3
Mar 2021165161.302.72$10,117
Feb 20210157.805.55$6
Jan 20210150.412.81$3
Dec 20200144.642.68$3
Nov 20200138.772.71$3
Oct 20200136.972.48$2
Sep 20200137.091.99$2
Aug 20200139.982.39$2
Jul 20200138.371.83$2
Jun 20200134.901.69$2
May 20200116.921.81$2
Apr 20200114.751.80$2
Mar 20200130.341.86$2
Feb 20200149.881.98$2
Jan 20200157.252.09$2
Dec 2019176159.012.30$10,388
Nov 20190155.302.75$3
Oct 20190153.472.42$2
Sep 2019176155.052.66$9,691
Aug 20190153.112.30$2
Jul 20190156.272.46$2
Jun 20190152.782.49$2
May 2019177158.482.74$10,354
Apr 20190162.632.75$3
Mar 20190156.803.06$3
Feb 20190150.852.79$3
Jan 2019181146.033.23$8,335
Dec 20180146.594.19$4
Nov 2018185152.934.24$9,796
Oct 20180161.443.40$3
Sep 20180159.543.11$3
Aug 2018180159.403.07$10,695
Jul 20180165.142.93$3
Jun 20180160.183.08$3
May 20180165.382.90$3
Apr 2018182163.842.90$11,622
Mar 20180161.222.79$3
Feb 20180161.782.77$3
Jan 20180162.874.01$4
Dec 20170157.272.92$3
Nov 20170155.423.12$3
Oct 20170149.292.98$3
Sep 20170147.523.09$3
Aug 20170145.373.00$3
Jul 2017169143.873.09$7,417
Jun 20170142.493.09$3
May 20170145.373.26$3
Apr 20170147.933.21$3
Mar 20170146.772.98$3
Feb 20170150.452.95$3
Jan 20170149.413.42$3
Dec 2016177148.763.72$8,634
Nov 20160142.492.64$3
Oct 20160146.193.09$3
Sep 20160141.553.10$3
Aug 20160141.442.92$3
Jul 20160141.622.92$3
Jun 2016177145.352.69$8,030
May 20160142.521.99$2
Apr 20160136.561.99$2
Mar 20160133.011.79$2
Feb 20160126.472.06$2
Jan 20160127.352.36$2
Dec 20150132.362.00$2
Nov 2015192138.792.17$7,450
Oct 20150143.552.43$2
Sep 20150142.992.76$3
Aug 20150140.162.87$3
Jul 2015191148.152.95$9,200
Jun 20150156.152.88$3
May 20150155.212.96$3
Apr 20150149.822.71$3
Mar 20150142.892.93$3
Feb 2015185144.662.98$8,265
Jan 20150143.433.10$3
Dec 2014194154.693.59$10,613
Nov 20140170.464.25$4
Oct 20140178.303.90$4
Sep 20140186.164.05$4
Aug 20140189.394.04$4
Jul 20140196.564.18$4
Jun 2014186198.164.74$18,263
May 20140194.734.73$5
Apr 20140195.944.81$5
Mar 2014380195.895.06$36,443
Feb 20140197.406.19$6
Jan 20140190.404.86$5
Dec 20130191.824.35$4
Nov 20130188.853.74$4
Oct 20130197.423.78$4
Sep 20131941104.113.72$20,201
Aug 201301104.253.52$4
Jul 20131931102.523.72$19,790
Jun 20130194.403.93$4
May 20130194.834.15$4
Apr 20130193.964.28$4
Mar 2013191193.623.91$17,885
Feb 20130191.233.42$3
Jan 2013188191.603.42$17,224
Dec 20120186.773.42$3
Nov 20120186.953.62$4
Oct 20120189.383.40$3
Sep 2012185194.672.92$17,517
Aug 20120192.662.91$3
Jul 20120185.133.02$3
Jun 2012188179.822.52$15,009
May 20120191.612.49$2
Apr 201201101.652.00$2
Mar 20121901105.052.22$19,962
Feb 201201101.102.57$3
Jan 2012191198.092.73$18,738
Dec 20110196.873.24$3
Nov 20110195.723.31$3
Oct 2011183184.983.65$15,555
Sep 20110183.623.99$4
Aug 20110183.404.15$4
Jul 2011190194.144.52$17,891
Jun 20110192.904.64$5
May 2011193198.134.40$18,943
Apr 201101105.964.33$4
Mar 20110196.364.06$4
Feb 20110185.644.18$4
Jan 2011190186.504.59$16,440
Dec 20100185.734.35$4
Nov 2010189180.843.80$15,283
Oct 20100178.103.51$4
Sep 20100172.633.98$4
Aug 2010188173.684.42$13,856
Jul 20100172.554.74$5
Jun 20100170.364.91$5
May 20100171.124.24$4
Apr 2010173181.694.12$14,136
Mar 2010187178.394.39$14,663
Feb 20100173.585.44$5
Jan 20100174.365.96$6
Dec 20090171.445.48$5
Nov 2009190174.593.75$14,176
Oct 2009182172.544.11$13,206
Sep 20090165.543.06$3
Aug 2009190167.423.22$12,813
Jul 20090161.133.46$3
Jun 2009184166.163.90$12,177
May 20090154.743.93$4
Apr 2009192146.773.59$8,983
Mar 2009194142.144.06$8,179
Feb 20090132.814.63$5
Jan 2009194135.865.37$6,962
Dec 2008192137.105.98$7,129
Nov 2008190155.496.86$10,550
Oct 2008380175.246.92$28,598
Sep 200801101.767.88$8
Aug 20081881114.228.48$21,482
Jul 200801131.0811.39$11
Jun 20081891131.3313.03$24,834
May 20081901123.1711.57$23,414
Apr 20081831110.3110.45$20,197
Mar 20081981101.909.66$20,186
Feb 20080192.538.77$9
Jan 2008388190.388.21$35,076
Dec 20070088.337.30$0
Nov 2007207091.677.29$18,976
Oct 2007201082.856.92$16,653
Sep 20070075.846.24$0
Aug 2007191069.066.39$13,190
Jul 2007203070.906.39$14,393
Jun 20070062.007.55$0
May 2007188058.747.85$11,043
Apr 20070059.617.81$0
Mar 2007207056.927.30$11,782
Feb 20070055.108.22$0
Jan 2007389050.306.73$19,567
Dec 20060056.656.92$0
Nov 2006189054.207.62$10,244
Oct 20060054.906.01$0
Sep 20060060.085.04$0
Aug 2006162068.717.34$11,131
Jul 20060069.376.34$0
Jun 2006186066.286.38$12,328
May 20060066.016.42$0
Apr 20060064.397.36$0
Mar 20060056.707.08$0
Feb 20060057.597.75$0
Jan 2006198060.598.93$11,997
Dec 20050054.9413.42$0
Nov 20050054.6910.59$0
Oct 2005190058.3413.80$11,085
Sep 20050061.4512.08$0
Aug 20050061.519.80$0
Jul 2005180055.697.84$10,024
Jun 2005126052.337.38$6,594
May 20050045.226.65$0
Apr 20050049.207.36$0
Mar 2005197050.377.15$9,923
Feb 20050045.226.31$0
Jan 20050143.166.32$6
Dec 2004199139.866.75$7,939
Nov 20040145.286.33$6
Oct 20040149.706.52$7
Sep 20040143.245.28$5
Aug 2004187142.375.55$7,929
Jul 20040138.286.08$6
Jun 2004165136.106.43$5,963
May 20040137.486.49$6
Apr 20040134.475.86$6
Mar 2004199134.365.53$6,843
Feb 20040132.455.51$6
Jan 20040132.036.30$6
Dec 2003183130.266.30$5,544
Nov 20030128.804.60$5
Oct 2003184128.174.76$5,188
Sep 20030126.314.75$5
Aug 2003189129.765.13$5,630
Jul 20030129.415.17$5
Jun 2003192128.565.98$5,490
May 20030126.595.97$6
Apr 2003197126.675.41$5,259
Mar 2003174131.146.10$5,424
Feb 20030133.487.93$8
Jan 2003184130.315.58$5,583
Dec 20020126.914.85$5
Nov 2002177124.664.14$4,369
Oct 2002181126.464.23$4,793
Sep 20020127.443.64$4
Aug 2002180125.963.16$4,676
Jul 2002176124.583.06$4,329
Jun 20020123.733.34$3
May 2002163124.663.58$4,023
Apr 2002340123.653.51$8,045
Mar 20020122.003.10$3
Feb 2002178118.222.38$3,246
Jan 2002184117.172.38$3,162
Dec 20010116.932.36$2
Nov 2001183118.072.41$3,309
Oct 2001172119.782.53$3,405
Sep 2001183124.262.25$4,442
Aug 20010124.873.05$3
Jul 2001168123.933.20$4,023
Jun 2001171124.563.82$4,204
May 20010125.524.31$4
Apr 2001170124.685.34$4,201
Mar 2001180124.545.38$4,423
Feb 2001345127.755.77$9,580
Jan 20010127.478.40$8
Dec 20000126.889.12$9
Nov 2000150132.215.66$4,837
Oct 2000177131.235.15$5,533
Sep 2000182131.875.19$5,806
Aug 2000164129.644.54$4,866
Jul 2000175128.534.09$4,997
Jun 2000333129.304.40$9,761
May 20000127.263.68$4
Apr 20000124.513.12$3
Mar 2000180128.422.86$5,118
Feb 2000168127.622.73$4,643
Jan 2000185125.272.48$4,677
Dec 1999166124.282.42$4,033
Nov 19990123.192.43$2
Oct 1999341120.982.80$7,157
Sep 19990121.752.62$3
Aug 1999172119.262.88$3,316
Jul 1999167117.892.37$2,990
Jun 1999173115.942.36$2,760
May 19990115.792.32$2
Apr 1999170115.102.21$2,569
Mar 1999174112.471.84$2,172
Feb 199917319.981.82$1,728
Jan 1999180110.381.90$1,870
Dec 199817319.201.77$1,593
Nov 19980110.892.19$2
Oct 1998171112.421.97$2,126
Sep 1998172112.592.08$2,168
Aug 1998174111.301.91$1,968
Jul 1998170111.742.24$1,998
Jun 1998176111.242.24$1,980
May 1998170112.622.21$2,148
Apr 1998347113.042.51$4,527
Mar 19980112.802.31$2
Feb 19980113.952.30$2
Jan 1998354114.702.15$5,206
Dec 19970116.322.41$2
Nov 1997179118.193.09$3,259
Oct 19970119.253.15$3
Sep 1997172117.742.95$3,054
Aug 1997172117.862.55$3,074
Jul 1997168117.582.25$2,956
Jun 1997175117.242.26$3,019
May 1997174118.972.31$3,303
Apr 1997181117.882.08$3,238
Mar 1997174118.951.94$3,299
Feb 1997173120.492.21$3,547
Jan 1997173123.483.54$4,066
Dec 1996162123.32$3,778
Nov 1996177121.97$3,889
Oct 1996359123.31$8,368
Sep 19960122.22$0
Aug 1996173120.26$3,505
Jul 1996177119.55$3,460
Jun 1996171118.73$3,203
May 1996179119.43$3,478
Apr 1996178121.51$3,829
Mar 1996178119.38$3,450
Feb 1996177116.98$3,005
Jan 1996348117.07$5,940
Dec 19950117.19$0
Nov 1995172116.00$2,752
Oct 1995176115.43$2,716
Sep 1995182116.18$2,945
Aug 1995341115.92$5,429
Jul 19950115.24$0
Jun 1995347116.41$5,694
May 1995175117.56$3,073
Apr 1995172117.73$3,050
Mar 1995180116.44$2,959
Feb 1995175116.58$2,902
Jan 1995167115.92$2,659
Dec 1994185115.03$2,781
Nov 1994164115.90$2,608
Oct 1994169115.58$2,633
Sep 1994340115.29$5,199
Aug 1994167116.13$2,694
Jul 1994345117.56$6,058
Jun 19940117.09$0
May 1994179115.88$2,843
Apr 1994171114.14$2,418
Mar 1994177112.46$2,205
Feb 1994177112.50$2,213
Jan 1994332112.66$4,203
Dec 1993184012.33$2,269
Nov 1993174014.49$2,521
Oct 1993178015.85$2,821
Sep 1993179115.03$2,690
Aug 1993174115.66$2,725
Jul 1993340115.46$5,256
Jun 1993174116.79$2,921
May 1993171117.68$3,023
Apr 1993171118.05$3,087
Mar 1993388118.14$7,038
Feb 1993193117.90$3,455
Jan 1993191116.93$3,234

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Mar 2026 — as filed, then multipliedworked
Oil                  158 bbl  × $ 89.75 =    $14,181
Casinghead gas         0 Mcf  × $  3.15 =         $0

────────────────────────────────────────────────────
Month total                                  $14,181

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 8A/O/64951 is the state's own key, not one this site invented.