HAWN

Operated by WHITING OIL AND GAS CORPORATION (P-5 920478) in the MARY TWO (DEVONIAN) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 65390District 8AField 58027500Hydrogen sulphide fieldOilCasinghead gasSaveExport
Value, all time
$4.8 M
Jan 1993 – Mar 2025
Value, last 12 filed months
$552
at the published price for each month
Months reported
387
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 10 leases and 12 wells, and the rule below applies to all of them.

Discovered
1981-06-25
as the register files it
Field class
Oil
the register's own label
Between wells
1,200 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 80 acres.

The register flags this field for hydrogen sulphide. That is a poisonous gas that occurs naturally in some formations. The flag is a property of the field as the Commission records it. It is not a measurement taken at this lease, and it is not a statement that gas is escaping anywhere.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition134,373 bbl$4,809,910
Casinghead gasProduction21 Mcf$0
Total$4,809,910

21 Mcf of this lease's gas, across 21 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 33.0479, -102.6496. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

33.04790, -102.64956 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
13,157 ft
1 wells filed one
Completion to plug
39.0 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 13,157 ft.

Completions filed
Jun 1985
1 of 1 wells
Plug dates filed
Jun 2024
1 of 1 wells

Last completion to plug: a median of 39.0 years across the 1 well that filed both dates, with the middle half between 39.0 years and 39.0 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-50132821113,157 ftJun 1985Jun 2024Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (387)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

387 months

Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20247078.812.20$552
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20235089.042.74$445
Aug 202315080.522.67$1,208
Jul 20239074.852.64$674
Jun 202311068.962.26$759
May 20239070.622.23$636
Apr 202315078.122.24$1,172
Mar 202314072.852.39$1,020
Feb 20238075.112.47$601
Jan 202321076.533.39$1,607
Dec 202221076.415.73$1,605
Nov 202243085.005.65$3,655
Oct 202293087.185.86$8,108
Sep 202268084.888.16$5,772
Aug 20220094.529.13$0
Jul 2022130101.587.54$1,321
Jun 2022190115.097.98$2,187
May 2022150109.378.43$1,641
Apr 2022540104.226.84$5,628
Mar 2022140108.885.08$1,524
Feb 202258091.054.86$5,281
Jan 202219081.844.54$1,555
Dec 202133071.323.90$2,354
Nov 202127077.435.24$2,091
Oct 202127079.795.71$2,154
Sep 202121069.865.35$1,467
Aug 202164066.024.22$4,225
Jul 202127070.783.98$1,911
Jun 202143069.493.38$2,988
May 202118063.483.02$1,143
Apr 20212060.362.76$121
Mar 20211061.302.72$61
Feb 20212057.805.55$116
Jan 20212050.412.81$101
Dec 20204044.642.68$179
Nov 20201038.772.71$39
Oct 20203036.972.48$111
Sep 20203037.091.99$111
Aug 20201039.982.39$40
Jul 20203038.371.83$115
Jun 20203034.901.69$105
May 20201016.921.81$17
Apr 20203014.751.80$44
Mar 20203030.341.86$91
Feb 20200049.881.98$0
Jan 20206057.252.09$344
Dec 20194059.012.30$236
Nov 20194055.302.75$221
Oct 20193053.472.42$160
Sep 20196055.052.66$330
Aug 201924053.112.30$1,275
Jul 201924056.272.46$1,350
Jun 201914052.782.49$739
May 20195058.482.74$292
Apr 20194062.632.75$251
Mar 20196056.803.06$341
Feb 20193050.852.79$153
Jan 201919046.033.23$875
Dec 201822046.594.19$1,025
Nov 20182052.934.24$106
Oct 201815061.443.40$922
Sep 201839059.543.11$2,322
Aug 201832059.403.07$1,901
Jul 20180065.142.93$0
Jun 201824060.183.08$1,444
May 201858065.382.90$3,792
Apr 201856063.842.90$3,575
Mar 201881061.222.79$4,959
Feb 201839061.782.77$2,409
Jan 201879062.874.01$4,967
Dec 201751057.272.92$2,921
Nov 201751055.423.12$2,826
Oct 201755049.292.98$2,711
Sep 201755047.523.09$2,614
Aug 201760045.373.00$2,722
Jul 201761043.873.09$2,676
Jun 201751042.493.09$2,167
May 201794045.373.26$4,265
Apr 2017108047.933.21$5,176
Mar 2017114046.772.98$5,332
Feb 20176050.452.95$303
Jan 2017159049.413.42$7,856
Dec 2016215048.763.72$10,483
Nov 201698042.492.64$4,164
Oct 2016147046.193.09$6,790
Sep 2016116041.553.10$4,820
Aug 2016223041.442.92$9,241
Jul 2016248041.622.92$10,322
Jun 2016273045.352.69$12,381
May 2016215042.521.99$9,142
Apr 2016222036.561.99$8,116
Mar 2016225033.011.79$7,427
Feb 2016229026.472.06$6,062
Jan 2016241027.352.36$6,591
Dec 2015223032.362.00$7,216
Nov 2015193038.792.17$7,486
Oct 2015167043.552.43$7,273
Sep 2015184042.992.76$7,910
Aug 2015182040.162.87$7,309
Jul 2015181048.152.95$8,715
Jun 2015134056.152.88$7,524
May 20155055.212.96$276
Apr 201587049.822.71$4,334
Mar 2015156042.892.93$6,691
Feb 2015143044.662.98$6,386
Jan 2015191043.433.10$8,295
Dec 2014136054.693.59$7,438
Nov 2014157070.464.25$11,062
Oct 2014158078.303.90$12,371
Sep 2014179086.164.05$15,423
Aug 2014177089.394.04$15,822
Jul 201417096.564.18$1,642
Jun 20148098.164.74$785
May 201436094.734.73$3,410
Apr 2014413095.944.81$39,623
Mar 2014331095.895.06$31,740
Feb 20140097.406.19$0
Jan 20140090.404.86$0
Dec 20130091.824.35$0
Nov 20130088.853.74$0
Oct 20130097.423.78$0
Sep 201300104.113.72$0
Aug 20131650104.253.52$17,201
Jul 20133200102.523.72$32,806
Jun 2013164094.403.93$15,482
May 2013332094.834.15$31,484
Apr 2013167093.964.28$15,691
Mar 2013332093.623.91$31,082
Feb 2013163091.233.42$14,870
Jan 2013329091.603.42$30,136
Dec 2012157086.773.42$13,623
Nov 2012328086.953.62$28,520
Oct 2012151089.383.40$13,496
Sep 20120094.672.92$0
Aug 2012331092.662.91$30,670
Jul 2012167085.133.02$14,217
Jun 20120079.822.52$0
May 2012502091.612.49$45,988
Apr 201200101.652.00$0
Mar 20121680105.052.22$17,648
Feb 20123350101.102.57$33,869
Jan 2012331098.092.73$32,468
Dec 2011339096.873.24$32,839
Nov 2011337095.723.31$32,258
Oct 2011338084.983.65$28,723
Sep 2011168083.623.99$14,048
Aug 2011336083.404.15$28,022
Jul 2011344094.144.52$32,384
Jun 2011344092.904.64$31,958
May 2011332098.134.40$32,579
Apr 20113440105.964.33$36,450
Mar 2011347096.364.06$33,437
Feb 2011171085.644.18$14,644
Jan 2011342086.504.59$29,583
Dec 2010340085.734.35$29,148
Nov 2010170080.843.80$13,743
Oct 2010340078.103.51$26,554
Sep 2010339072.633.98$24,622
Aug 2010339073.684.42$24,978
Jul 20100072.554.74$0
Jun 2010494070.364.91$34,758
May 2010376071.124.24$26,741
Apr 2010381081.694.12$31,124
Mar 2010382078.394.39$29,945
Feb 2010375073.585.44$27,593
Jan 2010529074.365.96$39,336
Dec 20090071.445.48$0
Nov 2009377074.593.75$28,120
Oct 2009381072.544.11$27,638
Sep 2009193065.543.06$12,649
Aug 2009372067.423.22$25,080
Jul 2009188061.133.46$11,492
Jun 2009377066.163.90$24,942
May 2009191054.743.93$10,455
Apr 2009377046.773.59$17,632
Mar 2009379042.144.06$15,971
Feb 2009375032.814.63$12,304
Jan 2009383035.865.37$13,734
Dec 2008381037.105.98$14,135
Nov 2008362055.496.86$20,087
Oct 2008379075.246.92$28,516
Sep 20083730101.767.88$37,956
Aug 20083760114.228.48$42,947
Jul 20083750131.0811.39$49,155
Jun 20083790131.3313.03$49,774
May 20081930123.1711.57$23,772
Apr 20085630110.3110.45$62,105
Mar 200810101.909.66$102
Feb 2008190092.538.77$17,581
Jan 2008354090.388.21$31,995
Dec 2007572088.337.30$50,525
Nov 2007194091.677.29$17,784
Oct 2007562082.856.92$46,562
Sep 2007185075.846.24$14,030
Aug 2007561069.066.39$38,743
Jul 2007187070.906.39$13,258
Jun 2007382062.007.55$23,684
May 2007374058.747.85$21,969
Apr 2007386059.617.81$23,009
Mar 2007381056.927.30$21,687
Feb 2007194055.108.22$10,689
Jan 2007569050.306.73$28,621
Dec 2006194056.656.92$10,990
Nov 2006378054.207.62$20,488
Oct 2006372054.906.01$20,423
Sep 2006383060.085.04$23,011
Aug 2006371068.717.34$25,491
Jul 2006375069.376.34$26,014
Jun 2006570066.286.38$37,780
May 2006368066.016.42$24,292
Apr 2006727064.397.36$46,812
Mar 2006389056.707.08$22,056
Feb 2006196057.597.75$11,288
Jan 20060060.598.93$0
Dec 2005582054.9413.42$31,975
Nov 2005552054.6910.59$30,189
Oct 2005378058.3413.80$22,053
Sep 2005382061.4512.08$23,474
Aug 2005578061.519.80$35,553
Jul 2005194055.697.84$10,804
Jun 2005564052.337.38$29,514
May 2005192045.226.65$8,682
Apr 2005189049.207.36$9,299
Mar 2005366050.377.15$18,435
Feb 2005353045.226.31$15,963
Jan 2005345043.166.32$14,890
Dec 2004520039.866.75$20,727
Nov 2004509045.286.33$23,048
Oct 2004512049.706.52$25,446
Sep 2004345043.245.28$14,918
Aug 2004357042.375.55$15,126
Jul 2004357038.286.08$13,666
Jun 2004344036.106.43$12,418
May 2004705037.486.49$26,423
Apr 2004347034.475.86$11,961
Mar 2004167034.365.53$5,738
Feb 2004372032.455.51$12,071
Jan 2004362032.036.30$11,595
Dec 2003530030.266.30$16,038
Nov 2003360028.804.60$10,368
Oct 2003883028.174.76$24,874
Sep 2003178026.314.75$4,683
Aug 2003354029.765.13$10,535
Jul 2003527029.415.17$15,499
Jun 2003518028.565.98$14,794
May 2003168026.595.97$4,467
Apr 2003531026.675.41$14,162
Mar 2003354031.146.10$11,024
Feb 2003350033.487.93$11,718
Jan 2003527030.315.58$15,973
Dec 2002340026.914.85$9,149
Nov 2002890024.664.14$21,947
Oct 2002345026.464.23$9,129
Sep 2002685027.443.64$18,796
Aug 2002517025.963.16$13,421
Jul 2002690024.583.06$16,960
Jun 2002523023.733.34$12,411
May 2002534024.663.58$13,168
Apr 2002713023.653.51$16,862
Mar 2002527022.003.10$11,594
Feb 2002530018.222.38$9,657
Jan 2002536017.172.38$9,203
Dec 2001902016.932.36$15,271
Nov 2001181018.072.41$3,271
Oct 20010019.782.53$0
Sep 20010024.262.25$0
Aug 2001527024.873.05$13,106
Jul 2001707023.933.20$16,919
Jun 2001539024.563.82$13,238
May 2001693025.524.31$17,685
Apr 2001356024.685.34$8,786
Mar 2001715024.545.38$17,546
Feb 2001731027.755.77$20,285
Jan 2001367027.478.40$10,081
Dec 2000720026.889.12$19,354
Nov 2000548032.215.66$17,651
Oct 2000911031.235.15$28,451
Sep 2000724031.875.19$23,074
Aug 2000720029.644.54$21,341
Jul 2000900028.534.09$25,677
Jun 2000359029.304.40$10,519
May 2000896027.263.68$24,425
Apr 2000542024.513.12$13,284
Mar 2000556028.422.86$15,802
Feb 20004027.622.73$110
Jan 2000367025.272.48$9,274
Dec 1999721024.282.42$17,506
Nov 1999739023.192.43$17,137
Oct 1999730020.982.80$15,315
Sep 1999548021.752.62$11,919
Aug 1999879019.262.88$16,930
Jul 1999896017.892.37$16,029
Jun 1999732015.942.36$11,668
May 1999903015.792.32$14,258
Apr 1999740015.102.21$11,174
Mar 1999910012.471.84$11,348
Feb 199973409.981.82$7,325
Jan 1999740010.381.90$7,681
Dec 199891409.201.77$8,409
Nov 1998912010.892.19$9,932
Oct 1998908012.421.97$11,277
Sep 19981,097012.592.08$13,811
Aug 19981,078011.301.91$12,181
Jul 19981,065011.742.24$12,503
Jun 1998901011.242.24$10,127
May 19981,467012.622.21$18,514
Apr 1998536013.042.51$6,989
Mar 19981,088012.802.31$13,926
Feb 19981,100013.952.30$15,345
Jan 19981,097014.702.15$16,126
Dec 19971,287016.322.41$21,004
Nov 19971,270018.193.09$23,101
Oct 19971,414019.253.15$27,220
Sep 19971,092017.742.95$19,372
Aug 19971,076017.862.55$19,217
Jul 19971,578017.582.25$27,741
Jun 19971,245017.242.26$21,464
May 19971,414018.972.31$26,824
Apr 1997542017.882.08$9,691
Mar 1997538018.951.94$10,195
Feb 1997179020.492.21$3,668
Jan 1997177023.483.54$4,156
Dec 1996487023.32$11,357
Nov 1996545021.97$11,974
Oct 1996355023.31$8,275
Sep 1996513022.22$11,399
Aug 1996349020.26$7,071
Jul 1996464019.55$9,071
Jun 1996416018.73$7,792
May 1996549019.43$10,667
Apr 1996386021.51$8,303
Mar 1996501019.38$9,709
Feb 1996431016.98$7,318
Jan 1996519017.07$8,859
Dec 1995581017.19$9,987
Nov 1995440016.00$7,040
Oct 1995521015.43$8,039
Sep 1995509016.18$8,236
Aug 1995529015.92$8,422
Jul 1995529015.24$8,062
Jun 1995540016.41$8,861
May 1995595017.56$10,448
Apr 1995673017.73$11,932
Mar 1995480016.44$7,891
Feb 1995532016.58$8,821
Jan 1995746015.92$11,876
Dec 1994661015.03$9,935
Nov 1994563015.90$8,952
Oct 1994621015.58$9,675
Sep 1994678115.29$10,367
Aug 1994532116.13$8,581
Jul 1994796117.56$13,978
Jun 1994406117.09$6,939
May 1994711115.88$11,291
Apr 1994450114.14$6,363
Mar 1994898112.46$11,189
Feb 1994741112.50$9,263
Jan 1994668112.66$8,457
Dec 1993935112.33$11,529
Nov 1993606114.49$8,781
Oct 1993823115.85$13,045
Sep 1993867115.03$13,031
Aug 1993464115.66$7,266
Jul 1993823115.46$12,724
Jun 1993924116.79$15,514
May 1993905117.68$16,000
Apr 1993784118.05$14,151
Mar 1993943118.14$17,106
Feb 1993801117.90$14,338
Jan 1993884116.93$14,966

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2024 — as filed, then multipliedworked
Oil                    7 bbl  × $ 78.81 =       $552
Casinghead gas         0 Mcf  × $  2.20 =         $0

────────────────────────────────────────────────────
Month total                                     $552

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 8A/O/65390 is the state's own key, not one this site invented.