W. TWIN PEAKS PARRAMORE

Operated by HUNT OIL COMPANY (P-5 416330) in the TWIN PEAKS (STRAWN, UP) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 65678District 8AField 92060500Hydrogen sulphide fieldOilCasinghead gasSaveExport
Value, all time
$1.6 M
Jan 1993 – Mar 2013
Value, last 12 filed months
$58 k
at the published price for each month
Months reported
243
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 24 leases and 131 wells, and the rule below applies to all of them.

Discovered
1972-07-17
as the register files it
Field class
Oil
the register's own label
Between wells
1,320 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 80 acres.

The register flags this field for hydrogen sulphide. That is a poisonous gas that occurs naturally in some formations. The flag is a property of the field as the Commission records it. It is not a measurement taken at this lease, and it is not a statement that gas is escaping anywhere.

The Commission's schedule remark for this field reads: INTO THE ANNE TANDY (STRAWN) FIELD.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition50,865 bbl$1,595,331
Casinghead gasProduction4,221 Mcf$16,157
Total$1,611,488

1,196 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 33.4298, -100.1568. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

33.42981, -100.15682 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
6,050 ft
1 wells filed one
Completion to plug
32.4 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,050 ft.

Completions filed
Jan 1986
1 of 1 wells
Plug dates filed
Jun 2018
1 of 1 wells

Last completion to plug: a median of 32.4 years across the 1 well that filed both dates, with the middle half between 32.4 years and 32.4 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-2693154316,050 ftJan 1986Jun 2018Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (243)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

243 months

Mar 20130093.623.91$0
Feb 20130091.233.42$0
Jan 20130091.603.42$0
Dec 20120086.773.42$0
Nov 20120086.953.62$0
Oct 20120089.383.40$0
Sep 2012312094.672.92$29,537
Aug 20120092.662.91$0
Jul 2012160085.133.02$13,621
Jun 20120079.822.52$0
May 2012158091.612.49$14,474
Apr 201200101.652.00$0
Mar 20121640105.052.22$17,228
Feb 201200101.102.57$0
Jan 2012159098.092.73$15,596
Dec 20110096.873.24$0
Nov 2011193095.723.31$18,474
Oct 20110084.983.65$0
Sep 20110083.623.99$0
Aug 2011195083.404.15$16,263
Jul 2011179094.144.52$16,851
Jun 20110092.904.64$0
May 2011189098.134.40$18,547
Apr 201100105.964.33$0
Mar 20110096.364.06$0
Feb 2011196085.644.18$16,785
Jan 20110086.504.59$0
Dec 2010179085.734.35$15,346
Nov 2010196080.843.80$15,845
Oct 20100078.103.51$0
Sep 20100072.633.98$0
Aug 2010192073.684.42$14,147
Jul 20100072.554.74$0
Jun 2010192070.364.91$13,509
May 2010192071.124.24$13,655
Apr 20100081.694.12$0
Mar 2010190078.394.39$14,894
Feb 20100073.585.44$0
Jan 2010194074.365.96$14,426
Dec 20090071.445.48$0
Nov 2009197074.593.75$14,694
Oct 20090072.544.11$0
Sep 2009187065.543.06$12,256
Aug 2009181067.423.22$12,203
Jul 20090061.133.46$0
Jun 2009194066.163.90$12,835
May 2009193054.743.93$10,565
Apr 20090046.773.59$0
Mar 2009200042.144.06$8,428
Feb 2009193032.814.63$6,332
Jan 20090035.865.37$0
Dec 2008198037.105.98$7,346
Nov 20080055.496.86$0
Oct 20080075.246.92$0
Sep 20081930101.767.88$19,640
Aug 20081680114.228.48$19,189
Jul 200800131.0811.39$0
Jun 20082520131.3313.03$33,095
May 200800123.1711.57$0
Apr 20082520110.3110.45$27,798
Mar 200800101.909.66$0
Feb 2008215092.538.77$19,894
Jan 20080090.388.21$0
Dec 2007260088.337.30$22,966
Nov 200703091.677.29$219
Oct 20072483182.856.92$20,761
Sep 200703075.846.24$187
Aug 20072533169.066.39$17,670
Jul 200703170.906.39$198
Jun 20072503062.007.55$15,726
May 200703158.747.85$243
Apr 20072543059.617.81$15,375
Mar 200703156.927.30$226
Feb 200702855.108.22$230
Jan 20072523150.306.73$12,884
Dec 200603156.656.92$214
Nov 20062553054.207.62$14,050
Oct 200603154.906.01$186
Sep 20062483060.085.04$15,051
Aug 200603168.717.34$228
Jul 200603169.376.34$197
Jun 20062233066.286.38$14,972
May 20062473166.016.42$16,504
Apr 20062083064.397.36$13,614
Mar 200603156.707.08$220
Feb 20062512857.597.75$14,672
Jan 200603160.598.93$277
Dec 20052343154.9413.42$13,272
Nov 200503054.6910.59$318
Oct 20052473158.3413.80$14,838
Sep 20052503061.4512.08$15,725
Aug 200503161.519.80$304
Jul 20052443155.697.84$13,832
Jun 200503052.337.38$221
May 20052503145.226.65$11,511
Apr 20052503049.207.36$12,521
Mar 200506250.377.15$444
Feb 20055142845.226.31$23,420
Jan 20052553143.166.32$11,202
Dec 20042533139.866.75$10,294
Nov 200403045.286.33$190
Oct 20042553149.706.52$12,875
Sep 20042563043.245.28$11,228
Aug 200403142.375.55$172
Jul 20042503138.286.08$9,759
Jun 20042533036.106.43$9,326
May 20042543137.486.49$9,721
Apr 200403034.475.86$176
Mar 20042533134.365.53$8,865
Feb 200404932.455.51$270
Jan 20042623132.036.30$8,587
Dec 20032353130.266.30$7,306
Nov 200303028.804.60$138
Oct 20032573128.174.76$7,387
Sep 200303026.314.75$142
Aug 20032543129.765.13$7,718
Jul 200303129.415.17$160
Jun 20032511928.565.98$7,282
May 20032532026.595.97$6,847
Apr 200301026.675.41$54
Mar 20032431231.146.10$7,640
Feb 20032581033.487.93$8,717
Jan 20032571130.315.58$7,851
Dec 20022571126.914.85$6,969
Nov 20022521024.664.14$6,256
Oct 20022531326.464.23$6,749
Sep 200201227.443.64$44
Aug 20022561325.963.16$6,687
Jul 20022571324.583.06$6,357
Jun 200201223.733.34$40
May 20022551324.663.58$6,335
Apr 20022531623.653.51$6,040
Mar 200201622.003.10$50
Feb 20022501518.222.38$4,591
Jan 20022551617.172.38$4,416
Dec 20012551616.932.36$4,355
Nov 20012581618.072.41$4,701
Oct 20012551619.782.53$5,084
Sep 20012511624.262.25$6,125
Aug 20012561624.873.05$6,416
Jul 20012511623.933.20$6,058
Jun 20012551624.563.82$6,324
May 20012531625.524.31$6,525
Apr 20012561624.685.34$6,403
Mar 20012461624.545.38$6,123
Feb 20012581427.755.77$7,240
Jan 20012591627.478.40$7,249
Dec 200001726.889.12$155
Nov 20002861732.215.66$9,308
Oct 20002561731.235.15$8,082
Sep 20002541731.875.19$8,183
Aug 20005101929.644.54$15,203
Jul 200002028.534.09$82
Jun 20004941829.304.40$14,553
May 20002511727.263.68$6,905
Apr 20002561824.513.12$6,331
Mar 20002621628.422.86$7,492
Feb 20002591527.622.73$7,194
Jan 20002571925.272.48$6,542
Dec 19992551924.282.42$6,237
Nov 19995002123.192.43$11,646
Oct 19992572320.982.80$5,456
Sep 19992572321.752.62$5,650
Aug 19992531919.262.88$4,927
Jul 19992501917.892.37$4,518
Jun 19992551715.942.36$4,105
May 19995111715.792.32$8,108
Apr 19992571715.102.21$3,918
Mar 19992521712.471.84$3,174
Feb 1999257169.981.82$2,594
Jan 19992551910.381.90$2,683
Dec 1998512199.201.77$4,744
Nov 19982541810.892.19$2,805
Oct 19982561912.421.97$3,217
Sep 19982541812.592.08$3,235
Aug 19982561911.301.91$2,929
Jul 19982591911.742.24$3,083
Jun 19982521811.242.24$2,873
May 19985121912.622.21$6,503
Apr 19982572113.042.51$3,404
Mar 19982602212.802.31$3,379
Feb 19982641913.952.30$3,726
Jan 19982541914.702.15$3,775
Dec 19975111816.322.41$8,383
Nov 19972602218.193.09$4,797
Oct 19972572319.253.15$5,020
Sep 19972522017.742.95$4,530
Aug 19975022317.862.55$9,024
Jul 19972572317.582.25$4,570
Jun 19974692217.242.26$8,135
May 19972532218.972.31$4,850
Apr 19975112217.882.08$9,183
Mar 19972392518.951.94$4,578
Feb 19972561920.492.21$5,287
Jan 19972542223.483.54$6,042
Dec 19965052023.32$11,777
Nov 19962541421.97$5,580
Oct 19962621823.31$6,107
Sep 19962601922.22$5,777
Aug 19963202020.26$6,483
Jul 19962572019.55$5,024
Jun 19962601918.73$4,870
May 19962552119.43$4,955
Apr 19962602021.51$5,593
Mar 19965192119.38$10,058
Feb 19962642016.98$4,483
Jan 19962612117.07$4,455
Dec 19952632017.19$4,521
Nov 19952612016.00$4,176
Oct 19955182115.43$7,993
Sep 19952572816.18$4,158
Aug 19952532915.92$4,028
Jul 19952422915.24$3,688
Jun 19955022816.41$8,238
May 19952822917.56$4,952
Apr 19952622717.73$4,645
Mar 19952622916.44$4,307
Feb 19952562516.58$4,244
Jan 19955272815.92$8,390
Dec 19942632815.03$3,953
Nov 19942592815.90$4,118
Oct 19942722915.58$4,238
Sep 19945172815.29$7,905
Aug 19942582916.13$4,162
Jul 19942552917.56$4,478
Jun 19945092817.09$8,699
May 19942622915.88$4,161
Apr 19942572814.14$3,634
Mar 19945232912.46$6,517
Feb 19942652412.50$3,313
Jan 19942582912.66$3,266
Dec 19935282912.33$6,510
Nov 19932592814.49$3,753
Oct 19932612915.85$4,137
Sep 19935152815.03$7,740
Aug 19935112915.66$8,002
Jul 19932802915.46$4,329
Jun 19935112816.79$8,580
May 19932562917.68$4,526
Apr 19935242818.05$9,458
Mar 19932582918.14$4,680
Feb 1993280117.90$5,012
Jan 19935262516.93$8,905

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Sep 2012 — as filed, then multipliedworked
Oil                  312 bbl  × $ 94.67 =    $29,537
Casinghead gas         0 Mcf  × $  2.92 =         $0

────────────────────────────────────────────────────
Month total                                  $29,537

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 8A/O/65678 is the state's own key, not one this site invented.