COX "B"

Operated by GIEBEL PETROLEUM LTD. (P-5 304280) in the GIEBEL (CLEARFORK, LOWER) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 66137District 8AField 34742500OilCasinghead gasSaveExport
Value, all time
$917 k
Jan 1993 – Oct 1998
Value, last 12 filed months
$86 k
at the published price for each month
Months reported
70
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 11 leases and 12 wells, and the rule below applies to all of them.

Discovered
1983-05-16
as the register files it
Field class
Oil
the register's own label
Between wells
1,200 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 1991-08-05.

The Commission's schedule remark for this field reads: 8/11/98 PER DOCDET #8A- 0219559.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition49,918 bbl$825,319
Casinghead gasProduction161,582 Mcf$92,055
Total$917,374

124,088 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Every month this lease reported (70)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

70 months

Oct 19980012.421.97$0
Sep 19980012.592.08$0
Aug 199816047011.301.91$2,704
Jul 19983411,70911.742.24$7,827
Jun 19983581,66711.242.24$7,753
May 19982651,77112.622.21$7,252
Apr 19983681,80113.042.51$9,311
Mar 19983721,86912.802.31$9,078
Feb 19982521,73213.952.30$7,497
Jan 19984131,97314.702.15$10,323
Dec 19974731,87316.322.41$12,235
Nov 19973761,81618.193.09$12,448
Oct 19973631,97719.253.15$13,215
Sep 19973701,98017.742.95$12,414
Aug 19975472,16017.862.55$15,288
Jul 19973702,11317.582.25$11,252
Jun 19973651,99717.242.26$10,800
May 19973712,07918.972.31$11,837
Apr 19975482,07217.882.08$14,114
Mar 19973612,24418.951.94$11,192
Feb 19973811,98020.492.21$12,174
Jan 19975582,21123.483.54$20,928
Dec 19965562,27023.32$12,966
Nov 19963692,03721.97$8,107
Oct 19965352,11923.31$12,471
Sep 19963622,28222.22$8,044
Aug 19965402,34520.26$10,940
Jul 19965452,46019.55$10,655
Jun 19965412,58018.73$10,133
May 19965182,61319.43$10,065
Apr 19967222,32721.51$15,530
Mar 19965382,39119.38$10,426
Feb 19965542,32416.98$9,407
Jan 19967312,45117.07$12,478
Dec 19957492,60717.19$12,875
Nov 19955552,64016.00$8,880
Oct 19957563,24715.43$11,665
Sep 19955522,75416.18$8,931
Aug 19957502,82615.92$11,940
Jul 19957422,69815.24$11,308
Jun 19957362,61116.41$12,078
May 19957342,30817.56$12,889
Apr 19957452,64717.73$13,209
Mar 19959112,85116.44$14,977
Feb 19957442,58516.58$12,336
Jan 19951,0862,74215.92$17,289
Dec 19949052,89815.03$13,602
Nov 19941,0872,83215.90$17,283
Oct 19949012,90515.58$14,038
Sep 19948912,86415.29$13,623
Aug 19941,0843,10516.13$17,485
Jul 19941,2513,05617.56$21,968
Jun 19949003,07517.09$15,381
May 19941,5942,91515.88$25,313
Apr 19949132,63214.14$12,910
Mar 19949102,57212.46$11,339
Feb 19941,2922,41812.50$16,150
Jan 19941,1172,82012.66$14,141
Dec 19931,1012,69412.33$13,575
Nov 19939232,56514.49$13,374
Oct 19931,4472,67015.85$22,935
Sep 19931,0962,72115.03$16,473
Aug 19931,4532,59315.66$22,754
Jul 19931,0912,49415.46$16,867
Jun 19931,2602,31516.79$21,155
May 19939262,32517.68$16,372
Apr 19931,2972,25318.05$23,411
Mar 19931,0792,40718.14$19,573
Feb 19939031,95117.90$16,164
Jan 19931,3142,29316.93$22,246

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Aug 1998 — as filed, then multipliedworked
Oil                  160 bbl  × $ 11.30 =     $1,808
Casinghead gas       470 Mcf  × $  1.91 =       $896

────────────────────────────────────────────────────
Month total                                   $2,704

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 8A/O/66137 is the state's own key, not one this site invented.