ROSE

Operated by WHITING OIL AND GAS CORPORATION (P-5 920478) in the BILLY (ABO) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 67462District 8AField 08234002Hydrogen sulphide fieldOilCasinghead gasSaveExport
Value, all time
$6.7 M
Aug 1995 – Jul 2006
Value, last 12 filed months
$76 k
at the published price for each month
Months reported
132
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 12 leases and 35 wells, and the rule below applies to all of them.

Discovered
1995-01-12
as the register files it
Field class
Oil
the register's own label
Between wells
933 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 1996-02-13.

The register flags this field for hydrogen sulphide. That is a poisonous gas that occurs naturally in some formations. The flag is a property of the field as the Commission records it. It is not a measurement taken at this lease, and it is not a statement that gas is escaping anywhere.

The Commission's schedule remark for this field reads: BILLY C NO. 1. OPTIONAL 40 ACRE UNITS WITH 2100' MAX. DIAG.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition300,578 bbl$6,648,687
Casinghead gasProduction24,262 Mcf$81,734
Total$6,730,421

272 Mcf of this lease's gas, across 16 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (2)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 33.8505, -102.3412. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.3 miles.

33.85053, -102.34120 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 2 wells
With a plug date
0.0%
0 of 2 wells
Median depth
7,058 ft
2 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
2100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

Between 7,050 and 7,065 ft, median 7,058 ft, over the 2 wells that filed a depth.

Completions filed
Sep 1995 – Aug 1997
2 of 2 wells

2 wells

42-2793033227,050 ftAug 1997
42-2793032517,065 ftSep 1995

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (132)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

132 months

Jul 20060069.376.34$0
Jun 20060066.286.38$0
May 20060066.016.42$0
Apr 20060064.397.36$0
Mar 20060056.707.08$0
Feb 20060057.597.75$0
Jan 20060060.598.93$0
Dec 20050054.9413.42$0
Nov 20050054.6910.59$0
Oct 20050058.3413.80$0
Sep 20050061.4512.08$0
Aug 20051,2266161.519.80$76,009
Jul 20051,1246255.697.84$63,082
Jun 20051,0886052.337.38$57,378
May 20051,2646245.226.65$57,570
Apr 20051,0936049.207.36$54,217
Mar 20051,2466250.377.15$63,205
Feb 20051,0605645.226.31$48,287
Jan 20051,2538243.166.32$54,598
Dec 20041,1776239.866.75$47,334
Nov 20041,16811545.286.33$53,615
Oct 20041,12812549.706.52$56,876
Sep 20041,12614843.245.28$49,470
Aug 20041,29116742.375.55$55,627
Jul 20041,25516038.286.08$49,015
Jun 20041,33514836.106.43$49,146
May 20041,39416737.486.49$53,332
Apr 20041,35817034.475.86$47,806
Mar 20041,34515934.365.53$47,093
Feb 20041,26613532.455.51$41,826
Jan 20041,28316232.036.30$42,115
Dec 20031,40717430.266.30$43,672
Nov 20031,32115528.804.60$38,757
Oct 20031,43214128.174.76$41,011
Sep 20031,37714226.314.75$36,903
Aug 20031,4339729.765.13$43,144
Jul 20031,47721629.415.17$44,555
Jun 20031,51822128.565.98$44,676
May 20031,55519126.595.97$42,488
Apr 20031,49318326.675.41$40,808
Mar 20031,63713931.146.10$51,824
Feb 20031,43211933.487.93$48,887
Jan 20031,65118630.315.58$51,080
Dec 20021,73922026.914.85$47,864
Nov 20021,55318724.664.14$39,071
Oct 20021,42722826.464.23$38,723
Sep 20021,48925527.443.64$41,785
Aug 20021,48427225.963.16$39,385
Jul 20021,55725324.583.06$39,046
Jun 20021,58123323.733.34$38,295
May 20021,54625524.663.58$39,038
Apr 20021,68522623.653.51$40,644
Mar 20021,76819722.003.10$39,507
Feb 20021,60011818.222.38$29,432
Jan 20021,71115517.172.38$29,746
Dec 20011,83621116.932.36$31,582
Nov 20011,74022018.072.41$31,971
Oct 20011,87219819.782.53$37,529
Sep 20011,68317424.262.25$41,221
Aug 20011,78019524.873.05$44,864
Jul 20011,91314623.933.20$46,245
Jun 20011,81017424.563.82$45,119
May 20012,05915225.524.31$53,200
Apr 20011,83713024.685.34$46,031
Mar 20011,91413924.545.38$47,717
Feb 20011,90718527.755.77$53,986
Jan 20011,66212427.478.40$46,697
Dec 20001,77519826.889.12$49,518
Nov 20001,88620332.215.66$61,897
Oct 20001,91411731.235.15$60,376
Sep 20001,86714531.875.19$60,253
Aug 20001,88219829.644.54$56,682
Jul 20001,85818228.534.09$53,753
Jun 20001,91120229.304.40$56,881
May 20001,85522427.263.68$51,392
Apr 20001,82415224.513.12$45,180
Mar 20001,92216528.422.86$55,095
Feb 20001,80215727.622.73$50,199
Jan 20001,99220825.272.48$50,854
Dec 19992,03525424.282.42$50,025
Nov 19992,05623823.192.43$48,258
Oct 19991,95225320.982.80$41,662
Sep 19991,92143221.752.62$42,913
Aug 19992,042019.262.88$39,329
Jul 19992,00421517.892.37$36,362
Jun 19992,04319215.942.36$33,019
May 19992,16519815.792.32$34,645
Apr 19992,12718915.102.21$32,535
Mar 19992,256012.471.84$28,132
Feb 19992,0781539.981.82$21,017
Jan 19992,31613510.381.90$24,297
Dec 19982,4431979.201.77$22,825
Nov 19984,49819710.892.19$49,414
Oct 19982,25718312.421.97$28,392
Sep 19982,25521112.592.08$28,830
Aug 19982,37516511.301.91$27,152
Jul 19982,44523411.742.24$29,228
Jun 19982,50127211.242.24$28,720
May 19982,61317712.622.21$33,367
Apr 19982,65310813.042.51$34,866
Mar 19982,64810312.802.31$34,132
Feb 19982,63920613.952.30$37,288
Jan 19982,68723314.702.15$40,001
Dec 19972,81925716.322.41$46,626
Nov 19972,862018.193.09$52,060
Oct 19973,11679219.253.15$62,478
Sep 19973,1501,00417.742.95$58,848
Aug 19973,2541,02217.862.55$60,727
Jul 19973,7581,02717.582.25$68,373
Jun 19973,0501,06017.242.26$54,975
May 19974,2683418.972.31$81,042
Apr 19974,375017.882.08$78,225
Mar 19974,3643,21318.951.94$88,928
Feb 19974,2243420.492.21$86,625
Jan 19974,5321723.483.54$106,472
Dec 19965,1361723.32$119,772
Nov 19965,0031721.97$109,916
Oct 19966,0331723.31$140,629
Sep 19965,8121722.22$129,143
Aug 19966,6291720.26$134,304
Jul 19966,8861719.55$134,621
Jun 19966,9731718.73$130,604
May 19966,7731719.43$131,599
Apr 19966,4941721.51$139,686
Mar 19967,2621719.38$140,738
Feb 19965,7071716.98$96,905
Jan 19966,0781717.07$103,751
Dec 19956,5321717.19$112,285
Nov 19956,2761716.00$100,416
Oct 19956,1901715.43$95,512
Sep 19951591716.18$2,573
Aug 19950015.92$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Aug 2005 — as filed, then multipliedworked
Oil                1,226 bbl  × $ 61.51 =    $75,411
Casinghead gas        61 Mcf  × $  9.80 =       $598

────────────────────────────────────────────────────
Month total                                  $76,009

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 8A/O/67462 is the state's own key, not one this site invented.