STORCH

Operated by BULLIN, R. E. OPERATING INC. (P-5 106531) in the LEVELLAND field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 67478District 8AField 53411001Hydrogen sulphide fieldOilCasinghead gasSaveExport
Value, all time
$1.8 M
Nov 1995 – May 2026
Value, last 12 filed months
$31 k
at the published price for each month
Months reported
367
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 568 leases and 7,034 wells, and the rule below applies to all of them.

Discovered
1945-01-17
as the register files it
Field class
Oil
the register's own label
Between wells
880 ft
minimum
From a lease line
440 ft
minimum

A drilling unit in this field needs at least 21.25 acres.

The register flags this field for hydrogen sulphide. That is a poisonous gas that occurs naturally in some formations. The flag is a property of the field as the Commission records it. It is not a measurement taken at this lease, and it is not a statement that gas is escaping anywhere.

The Commission's schedule remark for this field reads: ASSOCIATED GAS FIELD LEVELLAND (SAN ANDRES)

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition37,642 bbl$1,702,985
Casinghead gasProduction18,955 Mcf$79,931
Total$1,782,916

400 Mcf of this lease's gas, across 14 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (2)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 33.5470, -102.3866. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.2 miles.

33.54699, -102.38662 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
50.0%
1 of 2 wells
With a plug date
50.0%
1 of 2 wells
Median depth
7,777 ft
2 wells filed one
Completion to plug
10.2 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
150.0%
A plug date is filed
150.0%
BothOn the schedule and plugged. Neither fact cancels the other.
150.0%
NeitherNo plug date, and not on the schedule.
150.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

Between 7,663 and 7,890 ft, median 7,777 ft, over the 2 wells that filed a depth.

Completions filed
Nov 1995 – Jun 1997
2 of 2 wells
Plug dates filed
Aug 2007
1 of 2 wells; 1 filed none

Last completion to plug: a median of 10.2 years across the 1 well that filed both dates, with the middle half between 10.2 years and 10.2 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

2 wells

42-2193318717,890 ftJun 1997Aug 2007Yes
42-219359782W7,663 ftNov 1995

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (367)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

367 months

May 2026060106.413.05$183
Apr 202606098.932.87$172
Mar 202606089.753.15$189
Feb 20261456063.503.75$9,433
Jan 202606059.138.00$480
Dec 202506056.664.41$265
Nov 20251506058.593.93$9,024
Oct 202506059.383.30$198
Sep 20251656062.743.08$10,537
Aug 202506063.933.01$181
Jul 202506066.743.32$199
Jun 202506066.483.13$188
May 202506060.553.23$194
Apr 20251676062.363.54$10,627
Mar 202506067.704.27$256
Feb 202506070.884.34$260
Jan 202506074.324.28$257
Dec 20241736068.993.12$12,123
Nov 202406069.052.20$132
Oct 202406071.372.28$137
Sep 20241746069.612.36$12,254
Aug 202406075.632.06$124
Jul 202406079.932.15$129
Jun 20241676078.082.63$13,197
May 202406078.812.20$132
Apr 202406084.451.66$100
Mar 20241526080.301.55$12,298
Feb 202406076.091.78$107
Jan 202406073.023.30$198
Dec 202306071.262.61$157
Nov 20231626077.892.81$12,787
Oct 202306085.443.09$185
Sep 202306089.042.74$164
Aug 20231746080.522.67$14,171
Jul 202306074.852.64$159
Jun 202306068.962.26$136
May 202306070.622.23$134
Apr 20231636078.122.24$12,868
Mar 202306072.852.39$144
Feb 202306075.112.47$148
Jan 20231606076.533.39$12,448
Dec 202206076.415.73$344
Nov 202206085.005.65$339
Oct 202206087.185.86$352
Sep 20221766084.888.16$15,429
Aug 202206094.529.13$548
Jul 2022060101.587.54$453
Jun 202217260115.097.98$20,274
May 2022060109.378.43$506
Apr 2022060104.226.84$410
Mar 202216960108.885.08$18,705
Feb 20221536091.054.86$14,222
Jan 202206081.844.54$272
Dec 202106071.323.90$234
Nov 202106077.435.24$314
Oct 202106079.795.71$343
Sep 202106069.865.35$321
Aug 202106066.024.22$253
Jul 202106070.783.98$239
Jun 20211736069.493.38$12,225
May 202106063.483.02$181
Apr 20211676060.362.76$10,246
Mar 202106061.302.72$163
Feb 202106057.805.55$333
Jan 20211796050.412.81$9,192
Dec 202006044.642.68$161
Nov 202006038.772.71$162
Oct 202006036.972.48$149
Sep 20201746037.091.99$6,573
Aug 202006039.982.39$143
Jul 202006038.371.83$110
Jun 202006034.901.69$101
May 202006016.921.81$109
Apr 20201746014.751.80$2,675
Mar 202006030.341.86$111
Feb 202006049.881.98$119
Jan 202006057.252.09$126
Dec 20191656059.012.30$9,875
Nov 201906055.302.75$165
Oct 201906053.472.42$145
Sep 20191606055.052.66$8,967
Aug 201906053.112.30$138
Jul 20191626056.272.46$9,263
Jun 201906052.782.49$149
May 201906058.482.74$164
Apr 20191666062.632.75$10,562
Mar 201906056.803.06$184
Feb 20191596050.852.79$8,253
Jan 201906046.033.23$194
Dec 201806046.594.19$251
Nov 20181666052.934.24$9,041
Oct 201806061.443.40$204
Sep 201806059.543.11$186
Aug 20181606059.403.07$9,688
Jul 20181646065.142.93$10,859
Jun 201806060.183.08$185
May 201806065.382.90$174
Apr 201806063.842.90$174
Mar 20181656061.222.79$10,269
Feb 201806061.782.77$166
Jan 20181666062.874.01$10,677
Dec 201706057.272.92$175
Nov 201706055.423.12$187
Oct 20171666049.292.98$8,361
Sep 201706047.523.09$185
Aug 20171686045.373.00$7,802
Jul 201706043.873.09$185
Jun 201706042.493.09$185
May 20171616045.373.26$7,500
Apr 201706047.933.21$193
Mar 20171566046.772.98$7,475
Feb 201706050.452.95$177
Jan 201706049.413.42$205
Dec 20161616048.763.72$8,074
Nov 201606042.492.64$159
Oct 20161696046.193.09$7,992
Sep 201606041.553.10$186
Aug 20161616041.442.92$6,847
Jul 201606041.622.92$175
Jun 20161536045.352.69$7,100
May 201606042.521.99$119
Apr 201606036.561.99$119
Mar 20161686033.011.79$5,653
Feb 201606026.472.06$124
Jan 201606027.352.36$142
Dec 20151666032.362.00$5,492
Nov 201506038.792.17$130
Oct 201506043.552.43$146
Sep 20151646042.992.76$7,216
Aug 201506040.162.87$172
Jul 201506048.152.95$177
Jun 20151726056.152.88$9,831
May 201506055.212.96$177
Apr 201506049.822.71$162
Mar 20151676042.892.93$7,339
Feb 201506044.662.98$179
Jan 201506043.433.10$186
Dec 20141646054.693.59$9,185
Nov 201406070.464.25$255
Oct 20141676078.303.90$13,310
Sep 201406086.164.05$243
Aug 20141706089.394.04$15,438
Jul 201406096.564.18$251
Jun 20141596098.164.74$15,892
May 201406094.734.73$284
Apr 20141606095.944.81$15,639
Mar 201406095.895.06$303
Feb 201406097.406.19$372
Jan 20141616090.404.86$14,846
Dec 201306091.824.35$261
Nov 20131676088.853.74$15,062
Oct 201306097.423.78$227
Sep 201315360104.113.72$16,152
Aug 2013060104.253.52$211
Jul 201316960102.523.72$17,549
Jun 201306094.403.93$236
May 20131686094.834.15$16,180
Apr 20131616093.964.28$15,385
Mar 201306093.623.91$235
Feb 201306091.233.42$205
Jan 20131556091.603.42$14,403
Dec 20121686086.773.42$14,783
Nov 201206086.953.62$218
Oct 201206089.383.40$204
Sep 20121566094.672.92$14,944
Aug 201206092.662.91$174
Jul 201206085.133.02$181
Jun 20121726079.822.52$13,880
May 201206091.612.49$149
Apr 201216360101.652.00$16,689
Mar 2012060105.052.22$133
Feb 2012060101.102.57$154
Jan 20121526098.092.73$15,074
Dec 20111686096.873.24$16,469
Nov 201106095.723.31$199
Oct 201106084.983.65$219
Sep 20111626083.623.99$13,786
Aug 201106083.404.15$249
Jul 20111646094.144.52$15,710
Jun 201106092.904.64$278
May 201106098.134.40$264
Apr 201116860105.964.33$18,061
Mar 201106096.364.06$243
Feb 20111636085.644.18$14,210
Jan 201106086.504.59$275
Dec 201006085.734.35$261
Nov 20101696080.843.80$13,890
Oct 201006078.103.51$211
Sep 20101536072.633.98$11,351
Aug 201006073.684.42$265
Jul 201006072.554.74$284
Jun 20101616070.364.91$11,623
May 201006071.124.24$254
Apr 201006081.694.12$247
Mar 20101606078.394.39$12,806
Feb 201006073.585.44$327
Jan 20101656074.365.96$12,627
Dec 200906071.445.48$329
Nov 20091646074.593.75$12,458
Oct 20091726072.544.11$12,723
Sep 20091706065.543.06$11,326
Aug 200906067.423.22$193
Jul 20091756061.133.46$10,906
Jun 200906066.163.90$234
May 200906054.743.93$236
Apr 20091756046.773.59$8,400
Mar 200906042.144.06$244
Feb 20091776032.814.63$6,085
Jan 200906035.865.37$322
Dec 20081706037.105.98$6,666
Nov 200806055.496.86$412
Oct 20081676075.246.92$12,980
Sep 2008060101.767.88$473
Aug 200816960114.228.48$19,812
Jul 2008060131.0811.39$683
Jun 200816460131.3313.03$22,320
May 2008060123.1711.57$694
Apr 200817460110.3110.45$19,821
Mar 2008060101.909.66$580
Feb 20081276092.538.77$12,278
Jan 20081656090.388.21$15,405
Dec 200706088.337.30$438
Nov 20071756091.677.29$16,480
Oct 200706082.856.92$415
Sep 20071726075.846.24$13,419
Aug 200706069.066.39$383
Jul 200706070.906.39$383
Jun 200706062.007.55$453
May 20071726058.747.85$10,574
Apr 200706059.617.81$468
Mar 20071726056.927.30$10,228
Feb 200706055.108.22$493
Jan 20071566050.306.73$8,250
Dec 20061726056.656.92$10,159
Nov 200606054.207.62$457
Oct 20061696054.906.01$9,639
Sep 20061716060.085.04$10,576
Aug 200606068.717.34$440
Jul 20061686069.376.34$12,035
Jun 20061696066.286.38$11,584
May 20061716066.016.42$11,673
Apr 200606064.397.36$442
Mar 20061636056.707.08$9,667
Feb 20061756057.597.75$10,543
Jan 20061716060.598.93$10,897
Dec 200506054.9413.42$805
Nov 20051726054.6910.59$10,042
Oct 20051726058.3413.80$10,862
Sep 200506061.4512.08$725
Aug 20051636061.519.80$10,614
Jul 20051756055.697.84$10,216
Jun 20051646052.337.38$9,025
May 200506045.226.65$399
Apr 20051536049.207.36$7,969
Mar 20051796050.377.15$9,446
Feb 20051596045.226.31$7,569
Jan 20051806043.166.32$8,148
Dec 200406039.866.75$405
Nov 20041826045.286.33$8,621
Oct 20041676049.706.52$8,691
Sep 200406043.245.28$317
Aug 20041476042.375.55$6,561
Jul 20041706038.286.08$6,873
Jun 20041806036.106.43$6,884
May 20041806037.486.49$7,136
Apr 20041763034.475.86$6,242
Mar 20041793034.365.53$6,316
Feb 20041743032.455.51$5,812
Jan 20041753032.036.30$5,794
Dec 20031783030.266.30$5,575
Nov 200306028.804.60$276
Oct 20031563028.174.76$4,537
Sep 20031773026.314.75$4,799
Aug 20031801529.765.13$5,434
Jul 20031623029.415.17$4,920
Jun 20031663028.565.98$4,920
May 20031823026.595.97$5,019
Apr 20031813026.675.41$4,989
Mar 20031603031.146.10$5,165
Feb 20031733033.487.93$6,030
Jan 20031783030.315.58$5,563
Dec 20021793026.914.85$4,963
Nov 200203024.664.14$124
Oct 20023593026.464.23$9,626
Sep 200203027.443.64$109
Aug 20021753025.963.16$4,638
Jul 20023573024.583.06$8,867
Jun 200203023.733.34$100
May 20023223024.663.58$8,048
Apr 20021793023.653.51$4,339
Mar 20021623022.003.10$3,657
Feb 20021633018.222.38$3,041
Jan 20023493017.172.38$6,064
Dec 20011703016.932.36$2,949
Nov 20011793018.072.41$3,307
Oct 20011753019.782.53$3,537
Sep 20011683024.262.25$4,143
Aug 20011683024.873.05$4,270
Jul 20013463023.933.20$8,376
Jun 20011813024.563.82$4,560
May 20011823025.524.31$4,774
Apr 20013443024.685.34$8,650
Mar 20013483024.545.38$8,701
Feb 20011723027.755.77$4,946
Jan 20015143027.478.40$14,372
Dec 20001703026.889.12$4,843
Nov 20003493032.215.66$11,411
Oct 20005143031.235.15$16,207
Sep 20007063031.875.19$22,656
Aug 20007093029.644.54$21,151
Jul 20003523028.534.09$10,165
Jun 20003333029.304.40$9,889
May 20001693027.263.68$4,717
Apr 200003024.513.12$93
Mar 20001643028.422.86$4,747
Feb 20001803027.622.73$5,053
Jan 200003025.272.48$74
Dec 19991763024.282.42$4,346
Nov 19991763023.192.43$4,154
Oct 199903020.982.80$84
Sep 19991563021.752.62$3,472
Aug 19991603019.262.88$3,168
Jul 19991733017.892.37$3,166
Jun 19991773015.942.36$2,892
May 199903015.792.32$70
Apr 19991753015.102.21$2,709
Mar 19991823012.471.84$2,325
Feb 1999184309.981.82$1,891
Jan 19991823010.381.90$1,946
Dec 1998173309.201.77$1,645
Nov 199803010.892.19$66
Oct 19981843012.421.97$2,344
Sep 19981853012.592.08$2,392
Aug 19981783011.301.91$2,069
Jul 199803011.742.24$67
Jun 19981833011.242.24$2,124
May 19981853012.622.21$2,401
Apr 199803013.042.51$75
Mar 19983393012.802.31$4,408
Feb 199803013.952.30$69
Jan 19983363014.702.15$5,004
Dec 199703016.322.41$72
Nov 19971793018.193.09$3,349
Oct 19971823019.253.15$3,598
Sep 19971823017.742.95$3,317
Aug 19971833017.862.55$3,345
Jul 19971643017.582.25$2,951
Jun 19971823017.242.26$3,205
May 19971803018.972.31$3,484
Apr 19971833017.882.08$3,335
Mar 19971613018.951.94$3,109
Feb 199703020.492.21$66
Jan 19971713023.483.54$4,121
Dec 19961603023.32$3,731
Nov 19961733021.97$3,801
Oct 19961693023.31$3,939
Sep 199603022.22$0
Aug 19961443020.26$2,917
Jul 19962643019.55$5,161
Jun 19961573018.73$2,941
May 19961333019.43$2,584
Apr 19962983021.51$6,410
Mar 19961493019.38$2,888
Feb 19961523016.98$2,581
Jan 19962143017.07$3,653
Dec 19951833017.19$3,146
Nov 199501016.00$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Oil                    0 bbl  × $106.41 =         $0
Casinghead gas        60 Mcf  × $  3.05 =       $183

────────────────────────────────────────────────────
Month total                                     $183

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 8A/O/67478 is the state's own key, not one this site invented.