ROMALEE

Operated by TEXLAND PETROLEUM, L.P. (P-5 849735) in the PRENTICE (6700) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 67568District 8AField 72995498Hydrogen sulphide fieldOilCasinghead gasSaveExport
Value, all time
$279 k
May 1996 – Oct 2003
Value, last 12 filed months
$0
at the published price for each month
Months reported
90
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 64 leases and 1,041 wells, and the rule below applies to all of them.

Discovered
1950-06-13
as the register files it
Field class
Oil
the register's own label
Between wells
600 ft
minimum
From a lease line
440 ft
minimum

A drilling unit in this field needs at least 20 acres.

The register flags this field for hydrogen sulphide. That is a poisonous gas that occurs naturally in some formations. The flag is a property of the field as the Commission records it. It is not a measurement taken at this lease, and it is not a statement that gas is escaping anywhere.

The Commission's schedule remark for this field reads: 20 AC. OPTION - MAX DIAG 1500

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition14,108 bbl$279,001
Casinghead gasProduction71 Mcf$177
Total$279,177

15 Mcf of this lease's gas, across 8 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 33.2534, -102.5756. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

33.25336, -102.57565 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
6,900 ft
1 wells filed one
Completion to plug
11 months
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,900 ft.

Completions filed
Mar 2002
1 of 1 wells
Plug dates filed
Feb 2003
1 of 1 wells

Last completion to plug: a median of 11 months across the 1 well that filed both dates, with the middle half between 11 months and 11 months. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-4453173816,900 ftMar 2002Feb 2003Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (90)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

90 months

Oct 20030028.174.76$0
Sep 20030026.314.75$0
Aug 20030029.765.13$0
Jul 20030029.415.17$0
Jun 20030028.565.98$0
May 20030026.595.97$0
Apr 20030026.675.41$0
Mar 20030031.146.10$0
Feb 20030033.487.93$0
Jan 20030030.315.58$0
Dec 20020026.914.85$0
Nov 20020024.664.14$0
Oct 20020026.464.23$0
Sep 20020027.443.64$0
Aug 20020025.963.16$0
Jul 20020024.583.06$0
Jun 20020023.733.34$0
May 20020024.663.58$0
Apr 20020023.653.51$0
Mar 20020022.003.10$0
Feb 20020018.222.38$0
Jan 20020017.172.38$0
Dec 2001139016.932.36$2,353
Nov 20010018.072.41$0
Oct 20010019.782.53$0
Sep 20010024.262.25$0
Aug 20010124.873.05$3
Jul 2001167123.933.20$4,000
Jun 2001173124.563.82$4,253
May 2001166125.524.31$4,241
Apr 2001170124.685.34$4,201
Mar 2001173124.545.38$4,251
Feb 20010127.755.77$6
Jan 2001335127.478.40$9,211
Dec 2000168126.889.12$4,525
Nov 20000132.215.66$6
Oct 2000173131.235.15$5,408
Sep 2000169131.875.19$5,391
Aug 2000185129.644.54$5,488
Jul 2000169128.534.09$4,826
Jun 2000170129.304.40$4,985
May 2000181127.263.68$4,938
Apr 2000175124.513.12$4,292
Mar 20000128.422.86$3
Feb 2000175127.622.73$4,836
Jan 2000172125.272.48$4,349
Dec 1999166124.282.42$4,033
Nov 1999177123.192.43$4,107
Oct 1999175120.982.80$3,674
Sep 1999172121.752.62$3,744
Aug 1999171119.262.88$3,296
Jul 1999186117.892.37$3,330
Jun 1999172115.942.36$2,744
May 1999169115.792.32$2,671
Apr 1999181115.102.21$2,735
Mar 1999185112.471.84$2,309
Feb 1999019.981.82$2
Jan 1999183110.381.90$1,901
Dec 199819119.201.77$1,759
Nov 1998174110.892.19$1,897
Oct 1998189112.421.97$2,349
Sep 1998172112.592.08$2,168
Aug 1998172111.301.91$1,946
Jul 1998174111.742.24$2,045
Jun 1998175111.242.24$1,969
May 1998164112.622.21$2,072
Apr 1998349113.042.51$4,553
Mar 1998173112.802.31$2,217
Feb 1998159113.952.30$2,220
Jan 1998171114.702.15$2,516
Dec 1997346116.322.41$5,649
Nov 1997171118.193.09$3,114
Oct 1997174119.253.15$3,353
Sep 1997340117.742.95$6,035
Aug 1997173117.862.55$3,092
Jul 1997345117.582.25$6,067
Jun 1997173117.242.26$2,985
May 1997347118.972.31$6,585
Apr 1997346117.882.08$6,189
Mar 1997167118.951.94$3,167
Feb 1997350120.492.21$7,174
Jan 1997342123.483.54$8,034
Dec 1996346123.32$8,069
Nov 1996350121.97$7,690
Oct 1996341223.31$7,949
Sep 1996329122.22$7,310
Aug 1996345120.26$6,990
Jul 1996513219.55$10,029
Jun 1996504318.73$9,440
May 1996846419.43$16,438

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Dec 2001 — as filed, then multipliedworked
Oil                  139 bbl  × $ 16.93 =     $2,353
Casinghead gas         0 Mcf  × $  2.36 =         $0

────────────────────────────────────────────────────
Month total                                   $2,353

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 8A/O/67568 is the state's own key, not one this site invented.