"BIG STONE"

Operated by UNITEX OIL & GAS, L.L.C. (P-5 877921) in the REVILO (CLEAR FORK) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 69725District 8AField 76093333OilSaveExport
Value, all time
$916 k
Apr 2011 – May 2026
Value, last 12 filed months
$31 k
at the published price for each month
Months reported
182
no gaps in the span
Streams
1
oil

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 12 leases and 37 wells, and the rule below applies to all of them.

Discovered
1957-01-27
as the register files it
Field class
Oil
the register's own label
Between wells
660 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2010-10-12.

The Commission's schedule remark for this field reads: DIAGONAL & 100% ACRE ALLOCATION FORMULA.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition12,529 bbl$916,201
Total$916,201

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.7794, -101.0750. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.77940, -101.07496 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
3,756 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 3,756 ft.

Completions filed
Apr 2011
1 of 1 wells

1 well

42-4153467413,756 ftApr 2011

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (182)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

182 months

May 20260106.413.05$0
Apr 2026098.932.87$0
Mar 202612189.753.15$10,860
Feb 2026063.503.75$0
Jan 2026059.138.00$0
Dec 202512456.664.41$7,026
Nov 2025058.593.93$0
Oct 2025059.383.30$0
Sep 2025062.743.08$0
Aug 20257763.933.01$4,923
Jul 2025066.743.32$0
Jun 202512466.483.13$8,244
May 2025060.553.23$0
Apr 2025062.363.54$0
Mar 202514567.704.27$9,817
Feb 202527070.884.34$19,138
Jan 2025074.324.28$0
Dec 2024068.993.12$0
Nov 2024069.052.20$0
Oct 202430871.372.28$21,982
Sep 2024069.612.36$0
Aug 2024075.632.06$0
Jul 2024079.932.15$0
Jun 202432778.082.63$25,532
May 2024078.812.20$0
Apr 2024084.451.66$0
Mar 2024080.301.55$0
Feb 202416576.091.78$12,555
Jan 2024073.023.30$0
Dec 2023071.262.61$0
Nov 2023077.892.81$0
Oct 202332685.443.09$27,853
Sep 2023089.042.74$0
Aug 2023080.522.67$0
Jul 2023074.852.64$0
Jun 202333068.962.26$22,757
May 2023070.622.23$0
Apr 2023078.122.24$0
Mar 202319972.852.39$14,497
Feb 2023075.112.47$0
Jan 2023076.533.39$0
Dec 202215776.415.73$11,996
Nov 2022085.005.65$0
Oct 2022087.185.86$0
Sep 202212684.888.16$10,695
Aug 2022094.529.13$0
Jul 2022163101.587.54$16,558
Jun 20220115.097.98$0
May 20220109.378.43$0
Apr 20220104.226.84$0
Mar 2022163108.885.08$17,747
Feb 2022091.054.86$0
Jan 20227681.844.54$6,220
Dec 2021071.323.90$0
Nov 2021077.435.24$0
Oct 2021079.795.71$0
Sep 202116169.865.35$11,247
Aug 2021066.024.22$0
Jul 20219470.783.98$6,653
Jun 2021069.493.38$0
May 2021063.483.02$0
Apr 202116860.362.76$10,140
Mar 2021061.302.72$0
Feb 2021057.805.55$0
Jan 2021050.412.81$0
Dec 202016544.642.68$7,366
Nov 2020038.772.71$0
Oct 2020036.972.48$0
Sep 202010037.091.99$3,709
Aug 2020039.982.39$0
Jul 202033238.371.83$12,739
Jun 2020034.901.69$0
May 2020016.921.81$0
Apr 2020014.751.80$0
Mar 202010130.341.86$3,064
Feb 2020049.881.98$0
Jan 202016757.252.09$9,561
Dec 2019059.012.30$0
Nov 20199655.302.75$5,309
Oct 2019053.472.42$0
Sep 201910655.052.66$5,835
Aug 2019053.112.30$0
Jul 20199556.272.46$5,346
Jun 2019052.782.49$0
May 2019058.482.74$0
Apr 201916362.632.75$10,209
Mar 2019056.803.06$0
Feb 2019050.852.79$0
Jan 201911246.033.23$5,155
Dec 2018046.594.19$0
Nov 201817852.934.24$9,422
Oct 2018061.443.40$0
Sep 2018059.543.11$0
Aug 20187159.403.07$4,217
Jul 2018065.142.93$0
Jun 201817060.183.08$10,231
May 2018065.382.90$0
Apr 2018063.842.90$0
Mar 201816361.222.79$9,979
Feb 2018061.782.77$0
Jan 2018062.874.01$0
Dec 201716257.272.92$9,278
Nov 2017055.423.12$0
Oct 2017049.292.98$0
Sep 2017047.523.09$0
Aug 20177945.373.00$3,584
Jul 20178743.873.09$3,817
Jun 2017042.493.09$0
May 201716845.373.26$7,622
Apr 2017047.933.21$0
Mar 2017046.772.98$0
Feb 20179450.452.95$4,742
Jan 2017049.413.42$0
Dec 201611648.763.72$5,656
Nov 2016042.492.64$0
Oct 201612846.193.09$5,912
Sep 2016041.553.10$0
Aug 201610941.442.92$4,517
Jul 2016041.622.92$0
Jun 201611845.352.69$5,351
May 2016042.521.99$0
Apr 201610036.561.99$3,656
Mar 2016033.011.79$0
Feb 201610426.472.06$2,753
Jan 201613627.352.36$3,720
Dec 2015032.362.00$0
Nov 2015038.792.17$0
Oct 201511543.552.43$5,008
Sep 2015042.992.76$0
Aug 201513140.162.87$5,261
Jul 2015048.152.95$0
Jun 201510256.152.88$5,727
May 2015055.212.96$0
Apr 201510249.822.71$5,082
Mar 201519642.892.93$8,406
Feb 2015044.662.98$0
Jan 2015043.433.10$0
Dec 201417454.693.59$9,516
Nov 2014070.464.25$0
Oct 2014078.303.90$0
Sep 20149086.164.05$7,754
Aug 201416889.394.04$15,018
Jul 2014096.564.18$0
Jun 201410598.164.74$10,307
May 201413094.734.73$12,315
Apr 2014095.944.81$0
Mar 20145795.895.06$5,466
Feb 201416097.406.19$15,584
Jan 2014090.404.86$0
Dec 20134991.824.35$4,499
Nov 2013088.853.74$0
Oct 201317397.423.78$16,854
Sep 20130104.113.72$0
Aug 2013175104.253.52$18,244
Jul 20130102.523.72$0
Jun 2013094.403.93$0
May 201318094.834.15$17,069
Apr 2013093.964.28$0
Mar 201317093.623.91$15,915
Feb 2013091.233.42$0
Jan 201317491.603.42$15,938
Dec 2012086.773.42$0
Nov 201216286.953.62$14,086
Oct 2012089.383.40$0
Sep 201213494.672.92$12,686
Aug 201216292.662.91$15,011
Jul 2012085.133.02$0
Jun 201217679.822.52$14,048
May 2012091.612.49$0
Apr 2012161101.652.00$16,366
Mar 2012172105.052.22$18,069
Feb 20120101.102.57$0
Jan 201233598.092.73$32,860
Dec 2011096.873.24$0
Nov 201117095.723.31$16,272
Oct 201117484.983.65$14,787
Sep 201117083.623.99$14,215
Aug 201117583.404.15$14,595
Jul 201134694.144.52$32,572
Jun 201117592.904.64$16,258
May 201152298.134.40$51,224
Apr 20110105.964.33$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Mar 2026 — as filed, then multipliedworked
Oil                  121 bbl  × $ 89.75 =    $10,860

────────────────────────────────────────────────────
Month total                                  $10,860

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 8A/O/69725 is the state's own key, not one this site invented.