BRAVO PIPELINE COMPANY
Inspections and violations
What the Railroad Commission's field inspectors recorded at this operator's facilities. An inspection count tracks how much this operator runs in Texas; the rate beside it is what the inspectors found.
From the Commission's inspection and violation files, covering Aug 1 2015 to Aug 7 2026. The two are separate files with no key between them, so the violations here are not a subset of the 0 inspections that found this operator out of compliance — they are counted from their own file.
Commission dockets
Cases the Railroad Commission opened naming this operator. Most dockets are applications — commonly for an exception to the statewide spacing rule — and a small number are compliance orders.
| Type | What the Commission's remarks call it | Dockets |
|---|---|---|
| 106 | no published meaning for this code | 1 |
From the Commission's docket file published 2025-02-05. It is the only copy on the Commission's link, so nothing filed after that date appears here. The dates shown are the earliest and latest the record carries — 13 May 2016 to 26 Oct 2016. The file holds eight date fields per docket and the Commission publishes no key to which is which, so none is named here.
Pipeline systems
The named networks BRAVO PIPELINE COMPANY operates. One physical pipeline is usually filed as hundreds of segments, so a system — not a segment — is the unit worth reading.
| System | Miles | Segments | Counties |
|---|---|---|---|
| BRAVO PIPELINE SYSTEM | 246 | 31 | 6 |
| ESTE | 168 | 19 | 7 |
| VAL VERDE- N&S CROSS | 89 | 15 | 4 |
| BRAVO MALLET - ANTON IRISH | 47 | 3 | 3 |
| CENTURY CO2 PIPELINE | 41 | 5 | 3 |
| MABEE RANCH SYSTEM | 16 | 3 | 2 |
| CO2/GMK SUPPLY | 13 | 2 | 1 |
| STRATOS | 6.9 | 1 | 1 |
| SHARON RIDGE CANYON UNIT CO2 TRANSMISSIO | 5.7 | 2 | 1 |
| SBR CO2 SEQUESTRATION PIPELINES | 5.5 | 3 | 1 |
| HANFORD C02 PIPELINE | 4.1 | 1 | 1 |
| DENVER UNIT CO2 P/L 4.5" | 2.8 | 1 | 1 |
| RHODES COWDEN UNIT | 2.6 | 1 | 1 |
| OXY BRAVO TO WSSAU | 2.4 | 1 | 1 |
| VAL VERDE- N&S CROSS | 1.9 | 4 | 2 |
| VAL VERDE- N&S CROSS | 1.6 | 1 | 1 |
| TERRELL CO2 PIPELINE | 0.2 | 3 | 1 |
| VAL VERDE- N&S CROSS | 0.2 | 2 | 1 |
| VAL VERDE- N&S CROSS | 0.1 | 1 | 1 |