PALO DURO PIPELNS (TX GATH) L.P.
Inspections and violations
What the Railroad Commission's field inspectors recorded at this operator's facilities. An inspection count tracks how much this operator runs in Texas; the rate beside it is what the inspectors found.
| Rule | What the Commission cited it for | Violations |
|---|---|---|
| SWR 3.8(d)(1) | Unpermitted Disposal of Oil and Gas Wastes | 1 |
| SWR 4.103(a) | Unpermitted Disposal of Oil and Gas Wastes | 1 |
What the Commission did
- Notice of Violation 2
From the Commission's inspection and violation files, covering Aug 1 2015 to Aug 7 2026. The two are separate files with no key between them, so the violations here are not a subset of the 2 inspections that found this operator out of compliance — they are counted from their own file.
The Railroad Commission's docket file published 2025-02-05 names no case against this operator. That is what the file holds. It is not a statement that none exists.
Pipeline systems
The named networks PALO DURO PIPELNS (TX GATH) L.P. operates. One physical pipeline is usually filed as hundreds of segments, so a system — not a segment — is the unit worth reading.
| System | Miles | Segments | Counties |
|---|---|---|---|
| TXOK | 1,721 | 2,480 | 12 |
| TXOK | 57 | 60 | 5 |
| TXOK | 42 | 53 | 3 |
| TXOK | 24 | 6 | 3 |
| TXOK | 22 | 8 | 1 |
| TXOK | 19 | 209 | 2 |
| TXOK | 17 | 1 | 1 |
| WHEELER/TX-OK SYSTEM | 9.3 | 17 | 1 |
| TXOK | 8.8 | 10 | 1 |
| TXOK | 7.5 | 1 | 1 |
| TXOK | 7.1 | 1 | 1 |
| TXOK | 6.8 | 6 | 1 |
| TXOK | 6.5 | 4 | 2 |
| TXOK | 5.6 | 1 | 1 |
| TXOK | 5.0 | 10 | 1 |
| TXOK | 4.6 | 1 | 1 |
| TXOK | 2.3 | 9 | 1 |
| TXOK | 2.2 | 4 | 2 |
| TXOK | 1.9 | 41 | 1 |
| TXOK | 1.8 | 37 | 1 |
| TXOK | 1.7 | 2 | 1 |
| TXOK | 1.2 | 1 | 1 |
| TXOK | 0.9 | 1 | 1 |
| TXOK | 0.8 | 1 | 1 |
| TXOK | 0.8 | 1 | 1 |
| TXOK | 0.5 | 3 | 1 |
| TXOK | 0.5 | 1 | 1 |
| TXOK | 0.3 | 1 | 1 |
| TXOK | 0.3 | 3 | 1 |
| TXOK | 0.3 | 5 | 1 |
| TXOK | 0.2 | 14 | 1 |
| TXOK | 0.1 | 1 | 1 |
| TXOK | 0.0 | 1 | 1 |
| TXOK | 0.0 | 1 | 1 |