TARGA SOUTHTEX NGL PIPELINE LTD.
Inspections and violations
What the Railroad Commission's field inspectors recorded at this operator's facilities. An inspection count tracks how much this operator runs in Texas; the rate beside it is what the inspectors found.
From the Commission's inspection and violation files, covering Aug 1 2015 to Aug 7 2026. The two are separate files with no key between them, so the violations here are not a subset of the 0 inspections that found this operator out of compliance — they are counted from their own file.
The Railroad Commission's docket file published 2025-02-05 names no case against this operator. That is what the file holds. It is not a statement that none exists.
Pipeline systems
The named networks TARGA SOUTHTEX NGL PIPELINE LTD. operates. One physical pipeline is usually filed as hundreds of segments, so a system — not a segment — is the unit worth reading.
| System | Miles | Segments | Counties |
|---|---|---|---|
| REFUGIO TO ROBSTOWN NGL SYSTEM | 37 | 3 | 3 |
| REFUGIO TO ROBSTOWN NGL SYSTEM | 27 | 2 | 2 |
| REFUGIO TO ROBSTOWN NGL SYSTEM | 21 | 2 | 2 |
| WOODSBORO PLANT LINES | 3.9 | 2 | 1 |
| BONNIE VIEW ETHANE GAS SYSTEM | 3.8 | 9 | 1 |
| WOODSBORO PLANT LINES | 3.8 | 1 | 1 |
| CORPUS CHRISTI BAY SYSTEM | 3.5 | 1 | 1 |
| BONNIE VIEW SYSTEM | 3.1 | 2 | 1 |
| BONNIE VIEW SYSTEM | 2.4 | 1 | 1 |
| REFUGIO TO ROBSTOWN NGL SYSTEM | 1.7 | 1 | 1 |
| REFUGIO TO ROBSTOWN NGL SYSTEM | 0.5 | 1 | 1 |
| REFUGIO TO ROBSTOWN NGL SYSTEM | 0.5 | 1 | 1 |