POST OAK MIDSTREAM, L.L.C.
Miles
23
Systems
7
Counties
1
Segments
15
The Railroad Commission's inspection files, covering Aug 1 2015 to Aug 7 2026, record no inspection of this operator. That is what the files hold. It is not a statement that none took place.
The Railroad Commission's docket file published 2025-02-05 names no case against this operator. That is what the file holds. It is not a statement that none exists.
Pipeline systems
The named networks POST OAK MIDSTREAM, L.L.C. operates. One physical pipeline is usually filed as hundreds of segments, so a system — not a segment — is the unit worth reading.
| System | Miles | Segments | Counties |
|---|---|---|---|
| NORTH WORD TREATING PLANT SOUR LINE | 4.9 | 1 | 1 |
| NORTH WORD TREATING PLANT SOUR LINE | 4.6 | 5 | 1 |
| NORTH WORD TREATING PLANT SOUR LINE | 4.1 | 1 | 1 |
| POST OAK PIPELINE 6" | 3.8 | 1 | 1 |
| POST OAK PIPELINE 4" | 3.8 | 1 | 1 |
| SOUTH TEXAS-TX150 | 1.2 | 2 | 1 |
| SOUTH TEXAS-TX150 | 0.6 | 4 | 1 |