Kansas · Township 22 South, Range 19 East
Section 28, Township 22 South, Range 19 East
232 wells on record in this section, across 2 counties.
Wells
232
Operators
10
Fields
5
The wells in this section file 2 different counties: Anderson (230), Leavenworth (1). A township can straddle a county line, so every one is shown as filed rather than one being picked.
Counties
Operators
| Operator | Wells |
|---|---|
| unavailable | 77 |
| Colt Energy Inc | 66 |
| Russell, James E. Petroleum, Inc. | 46 |
| Southern Star Central Gas Pipeline, Inc. | 10 |
| M.A.E. Resources, Inc. | 9 |
| Five Resources, Inc. | 8 |
| Williams Gas Pipeline Central, Inc. | 7 |
| J.C.B. Resources, Inc. | 6 |
| H.B.C. Oil, Inc. | 2 |
| Mel-Mar Investment Corporation | 1 |
Wells
60 of 232 wells.
| Well | Operator | Status | Type | Spudded | Depth |
|---|---|---|---|---|---|
| COX 2 | unavailable | — | — | 1956 | 800 ft |
| JCB 1-88 | unavailable | — | — | 1988 | 871 ft |
| JCB UNIT 1 7 | unavailable | Recompleted | — | 1956 | 800 ft |
| JCB UNIT 1 7 | Colt Energy Inc | Producing | — | 1988 | 871 ft |
| IRA COX 3-B | unavailable | Approved Intent to Drill | — | — | 881 ft |
| BALLARD 1 | unavailable | Plugged and Abandoned | — | — | 916 ft |
| UNIT 1 25-A | unavailable | Approved Intent to Drill | — | — | — |
| IRA COX 1-B | unavailable | Approved Intent to Drill | — | — | — |
| IRA COX 2-B | unavailable | Approved Intent to Drill | — | — | — |
| SCULLY-PEINE O-3 | unavailable | Approved Intent to Drill | — | — | 825 ft |
| COX 2 | unavailable | Approved Intent to Drill | — | — | — |
| UNIT 2 14 | unavailable | Approved Intent to Drill | — | — | — |
| UNIT 2 ALBRIGHT DS1 | unavailable | Approved Intent to Drill | — | — | — |
| UNIT 2 15 | unavailable | Approved Intent to Drill | — | — | — |
| UNIT 2 16 | unavailable | Approved Intent to Drill | — | — | — |
| PEINE (UNIT 2) 1 | unavailable | Recompleted | — | 1955 | 1,564 ft |
| PEINE (UNIT2) 1 | Colt Energy Inc | Recompleted | — | — | 1,564 ft |
| PEINE (UNIT2) 1 | Colt Energy Inc | Authorized Injection Well | — | — | 1,556 ft |
| VIETJE-LUDKE 3 | Southern Star Central Gas Pipeline, Inc. | Plugged and Abandoned | — | — | 841 ft |
| vietje-luedke 8 | Southern Star Central Gas Pipeline, Inc. | Plugged and Abandoned | — | — | 810 ft |
| JCB UNIT 1 2 | Colt Energy Inc | Producing | — | — | 900 ft |
| JCB UNIT 1 3 | Colt Energy Inc | Inactive Well | — | — | 900 ft |
| JCB UNIT 1 6 | Colt Energy Inc | Inactive Well | — | — | 900 ft |
| JCB UNIT 1 OW-1 | Colt Energy Inc | Plugged and Abandoned | — | — | 860 ft |
| VIETJE LUEDK UI 3 | Southern Star Central Gas Pipeline, Inc. | Plugged and Abandoned | — | — | 825 ft |
| SOUTH WELDA 90 | unavailable | Recompleted | — | — | — |
| SOUTH WELDA 90 | Southern Star Central Gas Pipeline, Inc. | Authorized Injection Well | — | — | 913 ft |
| SOUTH WELDA 91 | Southern Star Central Gas Pipeline, Inc. | Recompleted | — | — | — |
| SOUTH WELDA 91 | Southern Star Central Gas Pipeline, Inc. | Authorized Injection Well | — | — | 932 ft |
| UNIT 1 (COX) O-5 | unavailable | Approved Intent to Drill | — | — | — |
| UNIT 2 COLONY NORTH RCT-18 | Colt Energy Inc | Producing | — | 1974 | 800 ft |
| UNIT 2 COLONY NORTH RCT-19 | Colt Energy Inc | Producing | — | 1974 | 805 ft |
| UNIT 2 COLONY NORTH RCT-20 | Colt Energy Inc | Producing | — | 1974 | 833 ft |
| UNIT 1 ALBRIGHT O-7 | Williams Gas Pipeline Central, Inc. | Plugged and Abandoned | — | — | 840 ft |
| VIETJE-LUDKE W-1 | Williams Gas Pipeline Central, Inc. | — | — | — | 865 ft |
| VIETJE-LUEDKE W-2 | Williams Gas Pipeline Central, Inc. | — | — | — | 850 ft |
| UNIT 1 ALBRIGHT-PEINE 4-W | unavailable | Approved Intent to Drill | — | — | — |
| UNIT 1 VIETJE-LUEDKE O-9 | unavailable | Approved Intent to Drill | — | — | — |
| ALBRIGHT-PEINE 3-W | Williams Gas Pipeline Central, Inc. | Plugged and Abandoned | — | — | 835 ft |
| UNIT 1 ALBRIGHT (PEINE) O-10 | Williams Gas Pipeline Central, Inc. | Plugged and Abandoned | — | — | 815 ft |
| UNIT 2 25 | Colt Energy Inc | Producing | — | — | 830 ft |
| UNIT 2 R-37 | unavailable | Expired Intent to Drill (C-1) | — | — | — |
| UNIT 2 R-38 | unavailable | Approved Intent to Drill | — | — | — |
| MILLER 1 | Colt Energy Inc | Producing | — | — | 875 ft |
| UNIT 1 VIETJE 1 LEUDKE O-12 | unavailable | Approved Intent to Drill | — | — | — |
| MILLER 2 | M.A.E. Resources, Inc. | Plugged and Abandoned | — | 1981 | 886 ft |
| MILLER 3 | unavailable | Approved Intent to Drill | — | — | — |
| MILLER 4 | unavailable | Approved Intent to Drill | — | — | — |
| MILLER 4 | Colt Energy Inc | Producing | — | 1982 | 890 ft |
| MILLER 5 | M.A.E. Resources, Inc. | Converted to EOR Well | — | 1982 | 865 ft |
| MILLER 5 | Colt Energy Inc | Authorized Injection Well | — | — | 863 ft |
| MILLER 6 | Colt Energy Inc | Producing | — | 1982 | 883 ft |
| MILLER 7 | Colt Energy Inc | Producing | — | 1982 | 834 ft |
| MILLER 1 | unavailable | Approved Intent to Drill | — | — | — |
| MILLER 2 | unavailable | Approved Intent to Drill | — | — | — |
| MILLER 8 | Colt Energy Inc | Producing | — | 1983 | 907 ft |
| MILLER 9 | Colt Energy Inc | Producing | — | 1983 | 893 ft |
| MILLER 10-INP | M.A.E. Resources, Inc. | Converted to EOR Well | — | 1983 | 891 ft |
| MILLER 10 | Colt Energy Inc | Authorized Injection Well | — | — | 891 ft |
| MILLER 11 | Colt Energy Inc | Producing | — | 1983 | 889 ft |
The rest of Township 22 South, Range 19 East
31 other sections in this township holds a well.
Sec 1 (5)Sec 2 (121)Sec 3 (150)Sec 4 (53)Sec 5 (4)Sec 6 (2)Sec 8 (3)Sec 9 (112)Sec 10 (111)Sec 11 (2)Sec 13 (4)Sec 14 (11)Sec 15 (67)Sec 16 (46)Sec 17 (14)Sec 19 (39)Sec 20 (49)Sec 21 (162)Sec 22 (143)Sec 23 (23)Sec 24 (13)Sec 25 (7)Sec 26 (38)Sec 27 (61)Sec 29 (227)Sec 30 (99)Sec 31 (128)Sec 32 (119)Sec 33 (70)Sec 34 (10)Sec 35 (5)
Section 28, Township 22 South, Range 19 East, Kansas. Sections are indexed from the wells in them, so a section appears here only where a well filed it. Corpus built 2026-09-10.