Gardner Federal 28-2D (PC-28)

API 04521192 · Garfield County, Colorado · PARACHUTE field

SIGW
API
04521192
Operator
QB ENERGY OPERATING LLC
County
Garfield
Spudded
2012-06-08
Measured depth
7,640 ft
True vertical depth
7,342 ft

Production

19 monthly filings with Colorado, Nov 2024 to May 2026. Each product is in its own unit and the four are never added.

Cumulative oil
75 bbl
Cumulative gas
56,962 MCF
Cumulative water
1,386 bbl
PeriodOil (bbl)Gas (MCF)Water (bbl)Days
May 2026———0
Apr 2026361,4242415
Mar 2026—3,3499731
Feb 2026—3,0546928
Jan 2026—3,3878731
Dec 2025—3,4014531
Nov 2025—3,3279530
Oct 2025—3,86913631
Sep 202562,5026025
Aug 2025203,3077831
Jul 2025—3,3738731
Jun 2025—3,2517228
May 2025—3,2958531
Apr 2025133,2758430
Mar 2025—3,4927231
Feb 202503,2658028
Jan 202503,3639728
Dec 202403,0726431
Nov 202402,9565430

A dash is a period the well filed with no volume for that product.

Wellbore

Colorado files the bottom of each bore of this well, and not the path between.

Bore
Directional
Deepest station
7,640 ft
True vertical depth
7,343 ft
Reach from well head (derived)
1,709 ft
Bearing (derived)
136°
Bores
1

The line on the map joins the well head to the bottom of each bore. It is a statement about those two points and not about the path between them, which Colorado does not file. The reach and bearing are derived from two points Colorado filed. Neither is a figure the operator reported.

Location

39.415590, -108.003740

39.41559, -108.00374 · Surface location as filed with Colorado

Every well in Garfield County, Colorado

Colorado state record, from CO_wells_WELLS_SHP.parquet. Corpus built 2026-09-11.