DILLARD KG 34-13

API 12332075 · Weld County, Colorado · TOM CAT field

PROW
API
12332075
Operator
NOBLE ENERGY INC
County
Weld
Field
Spudded
2011-01-19
Measured depth
7,295 ft

Production

19 monthly filings with Colorado, Nov 2024 to May 2026. Each product is in its own unit and the four are never added.

Cumulative oil
185 bbl
Cumulative gas
470 MCF
Cumulative water
155 bbl
PeriodOil (bbl)Gas (MCF)Water (bbl)Days
May 202628335331
Apr 2026113542330
Mar 202611—82
Feb 2026———0
Jan 20265——29
Dec 2025———0
Nov 20252883914
Oct 2025———0
Sep 2025—23—23
Aug 2025—18—31
Jul 2025—62—31
Jun 2025—643130
May 2025—62—31
Apr 2025—52130
Mar 2025—52—31
Feb 2025—42—24
Jan 2025———0
Dec 2024———0
Nov 2024———0

A dash is a period the well filed with no volume for that product.

Location

40.611278, -104.542198

40.61128, -104.54220 · Surface location as filed with Colorado

Every well in Weld County, Colorado

Colorado state record, from CO_wells_WELLS_SHP.parquet. Corpus built 2026-09-11.