ANTELOPE F-J-15HNB

API 12335985 · Weld County, Colorado · WILDCAT field

PROW
API
12335985
Operator
BONANZA CREEK ENERGY OPERATING COMPANY LLC
County
Weld
Field
WILDCAT
Spudded
2013-03-05
Measured depth
10,948 ft
True vertical depth
6,333 ft

Production

35 monthly filings with Colorado, Jul 2023 to May 2026. Each product is in its own unit and the four are never added.

Cumulative oil
5,149 bbl
Cumulative gas
20,313 MCF
Cumulative water
2,418 bbl
PeriodOil (bbl)Gas (MCF)Water (bbl)Days
May 2026216,314512
Apr 2026———0
Mar 2026———0
Feb 2026—13—1
Jan 2026———0
Dec 2025———0
Nov 2025———0
Oct 2025———0
Sep 2025———0
Aug 2025———0
Jul 2025———0
Jun 2025———0
May 2025———0
Apr 2025———0
Mar 2025———0
Feb 2025———0
Jan 2025———0
Dec 2024———0
Nov 20243277145
Oct 20243571,06236031
Sep 20243741,13635529
Aug 20243201,08924528
Jul 20243059601030
Jun 20243421,0239230
May 20241251,22211831
Apr 202434081913630
Mar 20243491,1358031
Feb 20243879607429
Jan 202412539818
Dec 202330276717030
Nov 202330672827029
Oct 202333070211531
Sep 20233428449630
Aug 20233877637431
Jul 202340569610627

A dash is a period the well filed with no volume for that product.

Wellbore

Colorado files the bottom of each bore of this well, and not the path between.

Bore
Horizontal
Deepest station
10,948 ft
True vertical depth
6,334 ft
Reach from well head (derived)
4,441 ft
Bearing (derived)
180°
Bores
1

The line on the map joins the well head to the bottom of each bore. It is a statement about those two points and not about the path between them, which Colorado does not file. The reach and bearing are derived from two points Colorado filed. Neither is a figure the operator reported.

Location

40.406060, -104.314660

40.40606, -104.31466 · Surface location as filed with Colorado

Every well in Weld County, Colorado

Colorado state record, from CO_wells_WELLS_SHP.parquet. Corpus built 2026-09-11.