LaSalle 25E-202

API 12337408 · Weld County, Colorado · WATTENBERG field

SIOW
API
12337408
Operator
PDC ENERGY INC
County
Weld
Spudded
2013-11-12
Measured depth
11,775 ft
True vertical depth
6,765 ft

Production

20 monthly filings with Colorado, Oct 2024 to May 2026. Each product is in its own unit and the four are never added.

Cumulative oil
356 bbl
Cumulative gas
3,258 MCF
PeriodOil (bbl)Gas (MCF)Days
May 2026——0
Apr 2026——0
Mar 2026——0
Feb 2026——0
Jan 2026——0
Dec 2025——0
Nov 2025——0
Oct 2025——0
Sep 2025——0
Aug 2025——0
Jul 2025——0
Jun 2025——0
May 20255948930
Apr 20256450430
Mar 20259859826
Feb 2025——0
Jan 2025—3064
Dec 20244750922
Nov 20246853330
Oct 20242031914

A dash is a period the well filed with no volume for that product.

Wellbore

Colorado files the bottom of each bore of this well, and not the path between.

Bore
Horizontal
Deepest station
11,775 ft
True vertical depth
6,765 ft
Reach from well head (derived)
5,124 ft
Bearing (derived)
77°
Bores
1

The line on the map joins the well head to the bottom of each bore. It is a statement about those two points and not about the path between them, which Colorado does not file. The reach and bearing are derived from two points Colorado filed. Neither is a figure the operator reported.

Location

40.373880, -104.620130

40.37388, -104.62013 · Surface location as filed with Colorado

Every well in Weld County, Colorado

Colorado state record, from CO_wells_WELLS_SHP.parquet. Corpus built 2026-09-11.