Castor Federal LD 15-75-1HN

API 12337484 · Weld County, Colorado · DJ HORIZONTAL NIOBRARA field

PROW
API
12337484
Operator
NOBLE ENERGY INC
County
Weld
Spudded
2014-01-07
Measured depth
10,055 ft
True vertical depth
5,764 ft

Production

21 monthly filings with Colorado, Sep 2024 to May 2026. Each product is in its own unit and the four are never added.

Cumulative oil
9,404 bbl
Cumulative gas
35,430 MCF
Cumulative water
249 bbl
PeriodOil (bbl)Gas (MCF)Water (bbl)Days
May 2026915——31
Apr 20268171,301—30
Mar 20267471,637—30
Feb 20264441,289—28
Jan 20265321,443—27
Dec 20255551,5911331
Nov 2025135712528
Oct 20252181,011518
Sep 20251981,1122225
Aug 20252193,4671831
Jul 20252072,8071731
Jun 20252102,5631630
May 20255681,102731
Apr 20254248332830
Mar 20253957701931
Feb 20253081,0131426
Jan 20253761,4082329
Dec 20246182,0143031
Nov 20243411,623214
Oct 20246253,520531
Sep 20245524,2142530

A dash is a period the well filed with no volume for that product.

Wellbore

Colorado files the bottom of each bore of this well, and not the path between.

Bore
Horizontal
Deepest station
10,055 ft
True vertical depth
5,764 ft
Reach from well head (derived)
4,099 ft
Bearing (derived)
179°
Bores
1

The line on the map joins the well head to the bottom of each bore. It is a statement about those two points and not about the path between them, which Colorado does not file. The reach and bearing are derived from two points Colorado filed. Neither is a figure the operator reported.

Location

40.757136, -103.848902

40.75714, -103.84890 · Surface location as filed with Colorado

Every well in Weld County, Colorado

Colorado state record, from CO_wells_WELLS_SHP.parquet. Corpus built 2026-09-11.