Harold 6X-232

API 12345756 · Weld County, Colorado · WATTENBERG field

PROW
API
12345756
Operator
PDC ENERGY INC
County
Weld
Field
WATTENBERG
Spudded
2018-12-15
Measured depth
17,598 ft
True vertical depth
6,785 ft

Production

20 monthly filings with Colorado, Oct 2024 to May 2026. Each product is in its own unit and the four are never added.

Cumulative oil
24,863 bbl
Cumulative gas
211,707 MCF
Cumulative water
5,295 bbl
PeriodOil (bbl)Gas (MCF)Water (bbl)Days
May 202677311,04122531
Apr 20266859,88630
Mar 202688611,36227531
Feb 20268669,45618728
Jan 20269379,96525331
Dec 202584310,09625831
Nov 202594210,27429230
Oct 20258825,52321217
Sep 2025124953264
Aug 20251,96814,51363431
Jul 20252,65815,48277331
Jun 20252,39514,19041930
May 20252,02718,72137531
Apr 20252,08216,11131130
Mar 20252,06916,23031726
Feb 20250
Jan 20254815,2688113
Dec 20242,26316,05347531
Nov 20241,81611,44217127
Oct 20241665,141115

A dash is a period the well filed with no volume for that product.

Location

40.335750, -104.585490

40.33575, -104.58549 · Surface location as filed with Colorado

Every well in Weld County, Colorado

Colorado state record, from CO_wells_WELLS_SHP.parquet. Corpus built 2026-08-19.