GUTTERSEN C34-715

API 12348916 · Weld County, Colorado · WATTENBERG field

PROW
API
12348916
Operator
NOBLE ENERGY INC
County
Weld
Spudded
2022-12-08
Measured depth
20,142 ft
True vertical depth
6,728 ft

Production

24 monthly filings with Colorado, Mar 2024 to May 2026. Each product is in its own unit and the four are never added.

Cumulative oil
140,950 bbl
Cumulative gas
1,112,726 MCF
Cumulative water
14,990 bbl
PeriodOil (bbl)Gas (MCF)Water (bbl)Days
May 20262,81413,570—30
Apr 20263,09614,839—30
Mar 20263,67216,605—31
Feb 20263,46914,862—28
Jan 20263,91416,302—31
Dec 20254,00817,321—31
Nov 20254,60918,429—30
Oct 20254,22724,952—31
Sep 20253,98043,932—30
Aug 20254,75150,875—31
Jul 2025—54,159—31
Jun 20255,12452,272—30
May 20255,43456,785—31
Apr 20255,57857,320—30
Mar 20256,10560,494—31
Feb 20256,01857,551—28
Jan 20257,20163,0291,68931
Dec 20247,46567,1972,09931
Nov 20247,55566,4351,16930
Oct 20248,14171,5761,04631
Sep 20248,59067,90264530
Aug 20248,97368,7451,25931
Jul 202410,50648,3021,83631
Mar 202415,72089,2725,24731

A dash is a period the well filed with no volume for that product. 1 period is carried by two Colorado extracts that disagree on the volume, with nothing in the record to choose between them; it is shown without a number rather than with a guessed one, and excluded from the totals above.

Wellbore

Colorado files the bottom of each bore of this well, and not the path between.

Bore
Horizontal
Deepest station
20,142 ft
True vertical depth
6,728 ft
Reach from well head (derived)
12,740 ft
Bearing (derived)
6°
Bores
1

The line on the map joins the well head to the bottom of each bore. It is a statement about those two points and not about the path between them, which Colorado does not file. The reach and bearing are derived from two points Colorado filed. Neither is a figure the operator reported.

Location

40.262623, -104.533584

40.26262, -104.53358 · Surface location as filed with Colorado

Every well in Weld County, Colorado

Colorado state record, from CO_wells_WELLS_SHP.parquet. Corpus built 2026-09-11.