Lindsey 9N
API 12348987 · Weld County, Colorado · WATTENBERG field
PROW
API
12348987
Operator
PDC ENERGY INC
County
Weld
Field
WATTENBERG
Spudded
2019-06-12
Measured depth
16,599 ft
True vertical depth
6,588 ft
Production
20 monthly filings with Colorado, Oct 2024 to May 2026. Each product is in its own unit and the four are never added.
Cumulative oil
13,893 bbl
Cumulative gas
372,354 MCF
Cumulative water
8,343 bbl
| Period | Oil (bbl) | Gas (MCF) | Water (bbl) | Days |
|---|---|---|---|---|
| May 2026 | 921 | 21,527 | 607 | 31 |
| Apr 2026 | 955 | 20,699 | — | 30 |
| Mar 2026 | 304 | 6,226 | 205 | 10 |
| Feb 2026 | 789 | 20,579 | 506 | 28 |
| Jan 2026 | 910 | 22,660 | 514 | 31 |
| Dec 2025 | 865 | 21,351 | 530 | 31 |
| Nov 2025 | 791 | 21,102 | 427 | 30 |
| Oct 2025 | 855 | 22,457 | 619 | 31 |
| Sep 2025 | 735 | 20,967 | 454 | 30 |
| Aug 2025 | 784 | 22,731 | 623 | 31 |
| Jul 2025 | 810 | 22,842 | 675 | 30 |
| Jun 2025 | 659 | 22,471 | 549 | 30 |
| May 2025 | 750 | 18,123 | 581 | 31 |
| Apr 2025 | 919 | 24,798 | 715 | 30 |
| Mar 2025 | 847 | 27,190 | 613 | 31 |
| Feb 2025 | 662 | 15,021 | 376 | 28 |
| Jan 2025 | 803 | 26,250 | — | 31 |
| Dec 2024 | 13 | 1,678 | 4 | 4 |
| Nov 2024 | — | — | 10 | 1 |
| Oct 2024 | 521 | 13,682 | 335 | 31 |
A dash is a period the well filed with no volume for that product.
Location
40.335120, -104.491170
40.33512, -104.49117 · Surface location as filed with Colorado⌘ or Ctrl + scroll to zoom
Every well in Weld County, Colorado
Colorado state record, from CO_wells_WELLS_SHP.parquet. Corpus built 2026-08-19.