Bost Farm 40C-8-L2

API 12351453 · Weld County, Colorado · WATTENBERG field

PROW
API
12351453
Operator
PDC ENERGY INC
County
Weld
Spudded
2022-01-03
Measured depth
17,853 ft
True vertical depth
7,371 ft

Production

20 monthly filings with Colorado, Oct 2024 to May 2026. Each product is in its own unit and the four are never added.

Cumulative oil
6,279 bbl
Cumulative gas
100,960 MCF
Cumulative water
1,677 bbl
PeriodOil (bbl)Gas (MCF)Water (bbl)Days
May 20264836,94819831
Apr 20263564,316—30
Mar 20262953,19913931
Feb 20261891,9499217
Jan 20261983,0488921
Dec 20252765,18413331
Nov 20253265,67814830
Oct 20253405,37413631
Sep 20252544,20310123
Aug 20254505,30120430
Jul 20252693,57713222
Jun 20255317,738—30
May 20254276,766431
Apr 20253176,090—25
Mar 20254369,601531
Feb 20252133,508127
Jan 20252216,497—31
Dec 2024541,335131
Nov 20241903,2088630
Oct 20244547,44020831

A dash is a period the well filed with no volume for that product.

Wellbore

Colorado files the bottom of each bore of this well, and not the path between.

Bore
Horizontal
Deepest station
17,853 ft
True vertical depth
7,371 ft
Reach from well head (derived)
8,826 ft
Bearing (derived)
93°
Bores
1

The line on the map joins the well head to the bottom of each bore. It is a statement about those two points and not about the path between them, which Colorado does not file. The reach and bearing are derived from two points Colorado filed. Neither is a figure the operator reported.

Location

40.414650, -104.827870

40.41465, -104.82787 · Surface location as filed with Colorado

Every well in Weld County, Colorado

Colorado state record, from CO_wells_WELLS_SHP.parquet. Corpus built 2026-09-11.