HETHCOCK 5-4HZ

API 12352108 · Weld County, Colorado · WATTENBERG field

PROW
API
12352108
Operator
KERR MCGEE OIL & GAS ONSHORE LP
County
Weld
Spudded
2023-06-28
Measured depth
17,727 ft
True vertical depth
7,170 ft

Production

36 monthly filings with Colorado, Jun 2023 to May 2026. Each product is in its own unit and the four are never added.

Cumulative oil
57,028 bbl
Cumulative gas
1,532,525 MCF
Cumulative water
47,337 bbl
PeriodOil (bbl)Gas (MCF)Water (bbl)Days
May 202694737,74980731
Apr 202696037,57681530
Mar 20261,02840,83388131
Feb 202695138,23080228
Jan 20261,09243,84594531
Dec 20251,14245,46399831
Nov 20251,19645,49299830
Oct 20251,26848,8471,02331
Sep 20251,28349,4081,01130
Aug 20251,44854,6561,25231
Jul 20251,52457,4241,26431
Jun 20251,52858,5281,36930
May 20251,84063,9941,56731
Apr 20251,98865,9871,66430
Mar 20252,13772,3321,95231
Feb 20252,20871,5062,24128
Jan 20252,67479,2482,16431
Dec 20243,19594,5953,24631
Nov 20243,725103,9464,17430
Oct 20244,881116,5805,32731
Sep 20245,743109,5004,61830
Aug 20246,850106,1582,54728
Jul 20245,69871,7453,98831
Jun 20241,38214,6191,26930
May 20243404,2644158
Apr 2024———0
Mar 2024———0
Feb 2024———0
Jan 2024———0
Dec 2023———0
Nov 2023———0
Oct 2023———0
Sep 2023———0
Aug 2023———0
Jul 2023———0
Jun 2023———0

A dash is a period the well filed with no volume for that product.

Wellbore

Colorado files the bottom of each bore of this well, and not the path between.

Bore
Horizontal
Deepest station
17,727 ft
True vertical depth
7,170 ft
Reach from well head (derived)
8,934 ft
Bearing (derived)
186°
Bores
1

The line on the map joins the well head to the bottom of each bore. It is a statement about those two points and not about the path between them, which Colorado does not file. The reach and bearing are derived from two points Colorado filed. Neither is a figure the operator reported.

Location

40.257039, -104.688256

40.25704, -104.68826 · Surface location as filed with Colorado

Every well in Weld County, Colorado

Colorado state record, from CO_wells_WELLS_SHP.parquet. Corpus built 2026-09-11.