STATE PH PROMETHEUS P22 15N-20-01

API 12352788 · Weld County, Colorado · WATTENBERG field

PROW
API
12352788
Operator
BONANZA CREEK ENERGY OPERATING COMPANY LLC
County
Weld
Spudded
2025-05-04

Production

13 monthly filings with Colorado, May 2025 to May 2026. Each product is in its own unit and the four are never added.

Cumulative oil
109,510 bbl
Cumulative gas
200,162 MCF
Cumulative water
72,235 bbl
PeriodOil (bbl)Gas (MCF)Water (bbl)Days
May 20265,84424,6212,45531
Apr 20267,50826,0993,34030
Mar 202610,51128,3973,59631
Feb 202612,18328,2233,69628
Jan 202613,90229,8095,21331
Dec 202517,49130,5599,02131
Nov 202518,20218,73210,41630
Oct 202514,3958,30514,78431
Sep 20258,2834,72117,17530
Aug 20251,1916962,53912
Jul 2025———0
Jun 2025———0
May 2025———0

A dash is a period the well filed with no volume for that product.

Wellbore

Colorado files the bottom of each bore of this well, and not the path between.

Bore
Horizontal
Deepest station
17,997 ft
True vertical depth
6,022 ft
Reach from well head (derived)
11,538 ft
Bearing (derived)
341°
Bores
1

The line on the map joins the well head to the bottom of each bore. It is a statement about those two points and not about the path between them, which Colorado does not file. The reach and bearing are derived from two points Colorado filed. Neither is a figure the operator reported.

Location

40.392720, -104.190740

40.39272, -104.19074 · Surface location as filed with Colorado

Every well in Weld County, Colorado

Colorado state record, from CO_wells_WELLS_SHP.parquet. Corpus built 2026-09-11.