Feist 1

API 15057200180000 · Ford County, Kansas · WILDCAT field

Plugged and AbandonedPlugged 1970-06-30
API
15057200180000
Operator
unavailable
County
Ford
Field
WILDCAT
Location
NW NW NW SE Sec 32 25S 23W
Spudded
1970-06-04
Completed
1970-06-17
Plugged
1970-06-30
Measured depth
4,960 ft

Formation tops

Kansas records 39 formations for this well, shallowest first.

FormationTop (ft)Base (ft)Picks
Graneros Shale Formation70—1
Dakota Sandstone Formation90—1
Kiowa Shale Formation367—1
Permian System798—1
Cedar Hills Sandstone Formation1,047—1
Salt Plain Formation1,206—1
Stone Corral Formation1,540–1,548—2
Wellington Formation1,857—1
Hutchinson Salt Member2,0182,4011
Chase Group2,574—1
Neva Limestone Member—3,1201
Wood Siding Formation3,328—1
Root Shale Formation—3,4511
Topeka Limestone Formation3,796—1
Heebner Shale Member4,076—2
Douglas Group4,112—1
Lansing Group4,183—1
Stanton Limestone Formation4,183—1
Bonner Springs Shale Member4,256—1
Iola Limestone Formation—4,3731
Paola Limestone Member—4,3831
Cement City Limestone Member4,400—1
Quivira Shale Member—4,4021
Drum Limestone Member4,442—1
Block Limestone Member—4,4441
Winterset Limestone Member4,486—1
Canville Limestone Member—4,4931
Bethany Falls Limestone Member4,537—1
Hertha Limestone Formation—4,5701
Kansas City Group4,6164,3732
Lenapah Limestone Formation4,629—1
Cherokee Group4,743—1
Excello Shale Member4,750—1
Atokan Stage4,825—1
Mississippian System4,856–4,861—3
Pennsylvanian System—4,8611
Chesteran Stage——1
St. Louis Limestone Formation——1
Ste. Genevieve Limestone Formation——1

A dash is a formation Kansas records for this well without a depth. In the base column a dash is also a depth Kansas’s sources record differently from one another. 2 formations were picked at more than one depth by different Kansas sources, and their range is shown rather than one of the answers.

Location

37.840245, -99.879587

37.84025, -99.87959 · Surface location as filed with Kansas

Every well in Ford County, Kansas

Kansas state record, from KS_wells_ks_wells.parquet. Corpus built 2026-09-11.