CROW CANYON UNIT #103H

API 3004538228 · San Juan County, New Mexico · Aztec district · Federal lease

NewOilPlugged 9999-12-31
API
3004538228
Operator
DJR OPERATING, LLC
Location (PLSS)
I-19-24N-08W
Spudded
2025-10-10

Pools

[98194] CROW CANYON, MANCOS

Monthly production

4 months filed with the Oil Conservation Division, Mar 2026 to Jun 2026. Oil and water are barrels; gas is MCF — the three are never added.

Cumulative oil
21,391 bbl
Cumulative gas
14,392 MCF
Cumulative water
19,539 bbl
MonthOil (bbl)Gas (MCF)Water (bbl)Days
Jun 20267,41613,4707,67030
May 202613,97592211,8699
Apr 202600
Mar 202600

A month with no figure filed no volume for that product. Statewide, 535 well-months carry two filings that disagree on the volume with nothing in the record to choose between them; those are excluded rather than guessed.

Location

36.297022, -107.716184 · I-19-24N-08W

New Mexico OCD data, corpus built 2026-08-18. API 04538228.