Smith & Lochte 1378
API 31029123500000 · Erie County, New York · Concord field
ACGD
API
31029123500000
Operator
PPP Future Development Inc.
County
Erie
Field
Concord
Location
Concord
Permit issued
1976-09-22
Measured depth
2,489 ft
True vertical depth
2,489 ft
Production
39 annual filings with New York, 1985 to 2024. Each product is in its own unit and the four are never added.
Cumulative oil
0 bbl
Cumulative gas
9,674 MCF
Cumulative water
376 bbl
| Period | Oil (bbl) | Gas (MCF) | Water (bbl) |
|---|---|---|---|
| 2024 | 0 | 0 | 0 |
| 2023 | 0 | 0 | 0 |
| 2022 | 0 | 0 | 0 |
| 2021 | 0 | 0 | 0 |
| 2020 | 0 | 10 | 0 |
| 2019 | 0 | 6 | 0 |
| 2018 | 0 | 17 | 0 |
| 2017 | 0 | 9 | 0 |
| 2016 | 0 | 38 | 0 |
| 2015 | 0 | 26 | 0 |
| 2014 | 0 | 24 | 5 |
| 2013 | 0 | 30 | 0 |
| 2012 | 0 | 96 | 0 |
| 2011 | 0 | 19 | 0 |
| 2010 | 0 | 101 | 46 |
| 2009 | — | 45 | 0 |
| 2008 | 0 | 0 | 0 |
| 2007 | 0 | 0 | 0 |
| 2006 | — | 40 | 0 |
| 2005 | — | 0 | 0 |
| 2004 | 0 | 0 | 0 |
| 2003 | 0 | 115 | 0 |
| 2002 | 0 | 0 | 0 |
| 2001 | 0 | 25 | 0 |
| 2000 | — | 596 | — |
| 1999 | — | 0 | 0 |
| 1997 | — | 0 | 0 |
| 1996 | — | 0 | 0 |
| 1995 | — | 77 | 0 |
| 1994 | — | 295 | 155 |
| 1993 | — | 1,252 | 100 |
| 1992 | — | 516 | 0 |
| 1991 | — | 513 | 10 |
| 1990 | — | 1,011 | 0 |
| 1989 | — | 1,014 | 0 |
| 1988 | — | 489 | 60 |
| 1987 | — | 1,241 | 0 |
| 1986 | — | 2,069 | 0 |
| 1985 | — | 0 | 0 |
A dash is a period the well filed with no volume for that product.
Location
42.590100, -78.714740
42.59010, -78.71474 · Surface location as filed with New York⌘ or Ctrl + scroll to zoom
Every well in Erie County, New York
New York state record, from NY_wells_szye-wmt3.parquet. Corpus built 2026-08-19.