Choate/Smith 2

API 31029197690000 · Erie County, New York · Alden-Lancaster field

PAGDPlugged 2021-05-24
API
31029197690000
Operator
PPP Future Development Inc.
County
Erie
Field
Alden-Lancaster
Location
Alden
Spudded
1984-12-19
Completed
1984-12-29
Permit issued
1984-11-28
Plugged
2021-05-24
Measured depth
1,288 ft
True vertical depth
1,288 ft

Production

31 annual filings with New York, 1986 to 2020. Each product is in its own unit and the four are never added.

Cumulative oil
0 bbl
Cumulative gas
0 MCF
Cumulative water
0 bbl
PeriodOil (bbl)Gas (MCF)Water (bbl)
2020000
2019000
2018000
2014000
2013000
2012000
201100
201000
200900
200800
200700
200600
200500
200400
20030
2002000
2001000
20000
199900
199800
199700
199600
199500
199400
199300
199200
199100
199000
198800
198700
198600

A dash is a period the well filed with no volume for that product.

Location

42.940190, -78.476110

42.94019, -78.47611 · Surface location as filed with New York

Every well in Erie County, New York

New York state record, from NY_wells_szye-wmt3.parquet. Corpus built 2026-08-19.