Choate/Smith 2
API 31029197690000 · Erie County, New York · Alden-Lancaster field
PAGDPlugged 2021-05-24
API
31029197690000
Operator
PPP Future Development Inc.
County
Erie
Field
Alden-Lancaster
Location
Alden
Spudded
1984-12-19
Completed
1984-12-29
Permit issued
1984-11-28
Plugged
2021-05-24
Measured depth
1,288 ft
True vertical depth
1,288 ft
Production
31 annual filings with New York, 1986 to 2020. Each product is in its own unit and the four are never added.
Cumulative oil
0 bbl
Cumulative gas
0 MCF
Cumulative water
0 bbl
| Period | Oil (bbl) | Gas (MCF) | Water (bbl) |
|---|---|---|---|
| 2020 | 0 | 0 | 0 |
| 2019 | 0 | 0 | 0 |
| 2018 | 0 | 0 | 0 |
| 2014 | 0 | 0 | 0 |
| 2013 | 0 | 0 | 0 |
| 2012 | 0 | 0 | 0 |
| 2011 | — | 0 | 0 |
| 2010 | — | 0 | 0 |
| 2009 | — | 0 | 0 |
| 2008 | — | 0 | 0 |
| 2007 | — | 0 | 0 |
| 2006 | — | 0 | 0 |
| 2005 | — | 0 | 0 |
| 2004 | — | 0 | 0 |
| 2003 | — | 0 | — |
| 2002 | 0 | 0 | 0 |
| 2001 | 0 | 0 | 0 |
| 2000 | — | 0 | — |
| 1999 | — | 0 | 0 |
| 1998 | — | 0 | 0 |
| 1997 | — | 0 | 0 |
| 1996 | — | 0 | 0 |
| 1995 | — | 0 | 0 |
| 1994 | — | 0 | 0 |
| 1993 | — | 0 | 0 |
| 1992 | — | 0 | 0 |
| 1991 | — | 0 | 0 |
| 1990 | — | 0 | 0 |
| 1988 | — | 0 | 0 |
| 1987 | — | 0 | 0 |
| 1986 | — | 0 | 0 |
A dash is a period the well filed with no volume for that product.
Location
42.940190, -78.476110
42.94019, -78.47611 · Surface location as filed with New York⌘ or Ctrl + scroll to zoom
Every well in Erie County, New York
New York state record, from NY_wells_szye-wmt3.parquet. Corpus built 2026-08-19.