Adler 2 (4162)

API 31099204300000 · Seneca County, New York · Fayette-Waterloo field

ACGD
API
31099204300000
Operator
Greenway Energy LLC
County
Seneca
Field
Fayette-Waterloo
Location
Varick
Spudded
1986-12-07
Completed
1986-12-22
Permit issued
1986-11-24
Measured depth
2,527 ft
True vertical depth
2,527 ft

Production

39 annual filings with New York, 1986 to 2024. Each product is in its own unit and the four are never added.

Cumulative oil
0 bbl
Cumulative gas
110,365 MCF
Cumulative water
0 bbl
PeriodOil (bbl)Gas (MCF)Water (bbl)
202401,3980
202301,3460
202201,5730
202101,4040
202001,4790
201901,5450
201801,5490
201701,6200
201601,4800
201501,3920
201401,6080
201301,6890
201201,7400
201102,1770
201002,1810
200902,2890
200801,8870
200702,0760
200602,1940
200502,3800
200402,7540
20031,951
20022,406
20012,4420
20002,646
19992,2470
19982,2950
19972,8280
19963,1060
19952,5400
19943,5460
19937,6820
19924,5440
19914,3960
19905,7740
19897,1690
19886,4140
198710,6180
198600

A dash is a period the well filed with no volume for that product.

Location

42.786721, -76.848878

42.78672, -76.84888 · Surface location as filed with New York

Every well in Seneca County, New York

New York state record, from NY_wells_szye-wmt3.parquet. Corpus built 2026-08-19.