GLASS 2512 #2H-7
API 3500322723 · Alfalfa County, Oklahoma
Completions
Oklahoma files 3 completion reports for this well. 3 carry a production test the operator filed.
Completion 0
HORIZONTAL HOLEACOILProduction test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2013-12-11 | 231 | 867 | 471 | 25 | 730 | 64/64 |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 7 | 26 | P-110 | 6,475 | 295 |
| INTERMEDIATE | 9 5/8 | 36 | J-55 | 1,050 | 330 |
| SURFACE | 13 3/8 | 48 | H-40 | 564 | 510 |
Completion 1
HORIZONTAL HOLEACOILProduction test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2013-12-11 | 268 | 453 | 2,287 | 34 | 220 | 64/64 |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 7 | 26 | P-110 | 6,475 | 295 |
| LINER | 4.5 | 11.6 | P-110 | 5,116 | 0 |
| INTERMEDIATE | 9 5/8 | 36 | J-55 | 1,050 | 330 |
| SURFACE | 13 3/8 | 48 | H-40 | 564 | 510 |
Completion 1
HORIZONTAL HOLEACOILProduction test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2013-12-11 | 268 | 453 | 2,287 | 34 | 220 | 64/64 |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 7 | 26 | P-110 | 6,475 | 295 |
| LINER | 4.5 | 11.6 | P-110 | 5,116 | 0 |
| INTERMEDIATE | 9 5/8 | 36 | J-55 | 1,050 | 330 |
| SURFACE | 13 3/8 | 48 | H-40 | 564 | 510 |
Drilling permit
Oklahoma files 1 application to drill this well, naming 1 target formation. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2013-09-06
WRADRHorizontal holeTarget formation
| Formation | Expected top (ft) |
|---|---|
| MISSISSIPPIAN | 5,800 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
36.652855, -98.532175
Every well in Alfalfa County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.