REITZ #2 SWD
API 3500322903 · Alfalfa County, Oklahoma
Injection
12 monthly filings with Oklahoma, Jan 2025 to Dec 2025.
| Month | Fluid injected (bbl) | Max pressure (psi) |
|---|---|---|
| Dec 2025 | 81,696 | -1 |
| Nov 2025 | 83,612 | -21 |
| Oct 2025 | 87,047 | -8 |
| Sep 2025 | 85,972 | -21 |
| Aug 2025 | 75,808 | -22 |
| Jul 2025 | 82,543 | -2 |
| Jun 2025 | 86,552 | 2 |
| May 2025 | 103,656 | 3 |
| Apr 2025 | 82,981 | -22 |
| Mar 2025 | 69,654 | -22 |
| Feb 2025 | 53,352 | -3 |
| Jan 2025 | 48,960 | -22 |
A dash is a month the well filed with no figure in that column.
Completion
Oklahoma files 1 completion report for this well.
Completion 0
DIRECTIONAL HOLEAC2DNCCasing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 9 5/8 | 40 | H-80 | 6,219 | 926 |
| CONDUCTOR | 20 | 36 | J-55 | 247 | 715 |
| SURFACE | 13 3/8 | 48 | H-40 | 787 | 665 |
Drilling permit
Oklahoma files 1 application to drill this well, naming 1 target formation. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2014-04-18
WRADRDirectional holeTarget formation
| Formation | Expected top (ft) |
|---|---|
| ARBUCKLE | 6,115 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
36.840195, -98.361295
Every well in Alfalfa County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.