KELTNER 2512 #1-17 SWD
API 3500323183 · Alfalfa County, Oklahoma
Injection
12 monthly filings with Oklahoma, Jan 2025 to Dec 2025.
| Month | Fluid injected (bbl) | Max pressure (psi) |
|---|---|---|
| Dec 2025 | 0 | 0 |
| Nov 2025 | 0 | 0 |
| Oct 2025 | 0 | 0 |
| Sep 2025 | 0 | 0 |
| Aug 2025 | 0 | 0 |
| Jul 2025 | 0 | 0 |
| Jun 2025 | 0 | 0 |
| May 2025 | 0 | 0 |
| Apr 2025 | 0 | 0 |
| Mar 2025 | 0 | 0 |
| Feb 2025 | 0 | 0 |
| Jan 2025 | 0 | 0 |
A dash is a month the well filed with no figure in that column.
Completion
Oklahoma files 1 completion report for this well.
Completion 1
STRAIGHT HOLEAC2DNCIntervals
| Formation | Produced | Perforated (ft) | Treatment |
|---|---|---|---|
| WILCOX | DISP | 6,645–7,001 | Acid |
| HUNTON | DISP | 7,012–7,096 | Acid |
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 7 | 26 | P-110 | 6,630 | 445 |
| LINER | 4.5 | 11.6 | P-110 | 574 | 40 |
| INTERMEDIATE | 9 5/8 | 36 | J-55 | 1,222 | 570 |
| SURFACE | 13 3/8 | 48 | J-55 | 584 | 510 |
Drilling permits
Oklahoma files 2 applications to drill this well, naming 3 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2015-03-02
WRADRDirectional holeTarget formation
| Formation | Expected top (ft) |
|---|---|
| ARBUCKLE | 7,256 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Filed 2017-01-20
WRADRStraight holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| HUNTON | 6,603 |
| WILCOX | 6,984 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
36.651723, -98.517058
Every well in Alfalfa County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.