BARTEL #2-5
API 3501122909 · Blaine County, Oklahoma
Completion
Oklahoma files 1 completion report for this well. One carries a production test the operator filed.
Completion 2
STRAIGHT HOLEACOILIntervals
| Formation | Produced | Perforated (ft) | Treatment |
|---|---|---|---|
| ATOKA | GAS | 8,294–8,310 | Acid, Frac |
| MORROW SAND | OIL | 8,356–8,364 | Acid, Frac |
Production tests
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2001-08-02 | 370 | 3,688 | 6 | 43.5 | 4,100 | 16/64 |
| 2012-07-25 | 0 | 61 | 2 | — | 1,500 | 17/64 |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| INTERMEDIATE | 5 1/2 | 17 | N-80 | 8,252 | 300 |
| PRODUCTION | 2 7/8 | 6.5 | N-80 | 8,497 | 75 |
| SURFACE | 8 5/8 | 24 32 | J-55 | 500 | 250 |
Drilling permits
Oklahoma files 2 applications to drill this well, naming 8 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2001-04-25
WRADRTarget formations
| Formation | Expected top (ft) |
|---|---|
| TONKAWA | 6,535 |
| LAYTON | 7,025 |
| BIG LIME-OSWEGO | 7,770 |
| RED FORK | 8,095 |
| ATOKA | 8,265 |
| MORROW SD | 8,315 |
| CHESTER UNCONF | 8,455 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Filed 2012-04-26
WRARCStraight holeTarget formation
| Formation | Expected top (ft) |
|---|---|
| ATOKA | 8,292 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
36.064134, -98.497210
Every well in Blaine County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.